Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC 2ND FLOOR 76A PHUL SARAI RANCHI ROAD DISTRICT RAMGARH JHARKHAND | RANCHI | RAMGARH | JHARKHAND | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.5 L+₹2,474.46 (0.72%)Rejected-AOC AT DATMA MORE PO KUJU DISTT RAMGARH JHARKHAND 825316 | RAMGARH | RAMGARH | JHARKHAND | 825316 | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.5 L+₹5,011.46 (1.46%)Rejected-AOC AT PO LAIYO VIA KEDIA DISTT RAMGARH JHARKHAND 825325 | RAMGARH | RAMGARH | JHARKHAND | 825325 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
30 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manoj Kumar Mishra Project Engineer (Excv)
Jharkhand OCP, PO-Kedla, Dist- Ramgarh, Pin- 825325
Repairing of isolator, VCB and Main Transformer 63 KVA, 3.3 KV alongwith magnetic amplifiers -03 Nos. (Hoist, crowd and swing/ propel) in HMB-581 shovel of Jharkhand OCP.
2023_CCL_294301_1
PE(X)/JOCP/NIT/23-24/60 Dated- 22.11.2023
Open Tender
Excavation Department Work
Item Rate
5 days
Jharkhand OCP
As per tender document
2 documents required · 2 mandatory
₹4,300
8 Dec 2023
22 Nov 2023
1 Dec 2023
22 Nov 2023
30 Nov 2023
22 Nov 2023
22 Nov 2023 - 27 Nov 2023
Amount
Repairing of isolator Repairing of handle mechanism with new materials.
Repairing and replacement of fixed and moving contacts, insulator and Arc chute
Repairing of Tie rod and its mechanism
HT Electrician: 02 person X 03 days
Helper: 02 person X 03 days
Repairing of VCB . Replacement of vacuum interrupter bottles.
Replacement of economy resistance
Replacement of holding coil
Replacement of flexible connections, terminals and support insulators.
HT Electrician: 02 person X 03 days
Helper: 02 person X 03 days
Repairing of Transformer. Copper wire for winding (-) Less scrap value = (60%)
Cost of insulation (15% of sl.no. 1)
Brass studs with bushings
HT Electrician: 02 person X 03 days
Helper: 03 person X 03 days
Repairing of 03 Nos. Magnetic Amplifiers (Hoist, crowd and swing/ propel) Replacement of main transformer coil (-) Less scrap value 33 Kg. X @350
Replacement of control winding
Replacement of choke coil
Replacement of main diode 40A, 1200PIV
Replacementof bridge unit potentiometer (1 Kohm/ 50W)
Replacement of pot resistance 200ohm/50W, 51ohm/50W, 1.6Kohm/50W
HT Electrician – 03 person X 02 days
Helper – 03 person X 02 days
Total impact of GST for the purpose of CTC
M/S PARVEJ ENTERPRISES
M/S ARSHI ENTERPRISES
techsummary_304826.pdf
PDF • 0.27 MB
finsummary_304826.pdf
PDF • 0.27 MB
workorder.pdf
PDF • 0.28 MB
finance_304826.pdf
PDF • 0.27 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .