Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹8.9 CrAccepted-AOC FLAT NO 2450 KRISHNA COLONY JIND 126102 | JIND | HARYANA | 126102 | ₹8.9 Cr | 1st | Accepted-AOC 1st |
| 2 | 2nd₹9.7 CrRejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹9.7 Cr | 2nd | Rejected-AOC 2nd |
| 3 | 3rd₹10.1 CrRejected-AOC 858 SECTOR 23 127021 | BHIWANI | HARYANA | 127021 | ₹10.1 Cr | 3rd | Rejected-AOC 3rd |
| 4 | 4th₹10.2 CrRejected-AOC MITTAL FARM LOHARU ROAD CHARKHI DADRI 127306 | CHARKI DADRI | HARYANA | 127306 | ₹10.2 Cr | 4th | Rejected-AOC 4th |
| 5 | 5th₹10.3 CrRejected-AOC NEAR SHIV MANDIR VILLAGE RAJPURA KHARKARI TEHSIL AND DISTRICT BHIWANI 127031 | BHIWANI | HARYANA | 127031 | ₹10.3 Cr | 5th | Rejected-AOC 5th |
| Sl No | Description | Qty | Unit | M/S SHREE BALAJI BUILDERS L4 | ROHTASH KUMAR CONTRACTOR L2 | Ravinder Sharma Contractor L3 | ANAND KUMAR CONT L5 | M/S AAR PEE CONSTRUCTION COMPANY JIND L1 |
|---|---|---|---|---|---|---|---|---|
| 1.10 | SDesign, construction, testing and commissioning of 2.00 MLD capacity Water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVC/VAG) 1. | 1 | Each | 1,35,00,000 ₹1.4 Cr | 1,40,00,000 ₹1.4 Cr | 1,40,00,000 ₹1.4 Cr | 1,40,00,000 ₹1.4 Cr | 1,12,57,500 ₹1.1 Cr |
| 1.20 | Supplying , erection , testing and commissioning of Horizontal Motor pumping set for raw water having head 30.00 mtr as per the indicated requirements of discharge in 3800 LPM and power capacity in 45.00 BHP ( Discharge 3800 LPM) | 2 | Each | 3,35,000 ₹6.7 L | 45,000 ₹90,000 | 4,00,000 ₹8 L | 4,00,000 ₹8 L | 2,29,000 ₹4.6 L |
| 1.30 | Supplying , erection , testing and commissioning of Horizontal Motor pumping set for raw water having head 12.00 mtr as per the indicated requirements of discharge in 5000LPM and power capacity in ( Discharge 5000 LPM) | 2 | Each | 3,35,000 ₹6.7 L | 2,00,000 ₹4 L | 2,00,000 ₹4 L | 3,50,000 ₹7 L | 1,85,000 ₹3.7 L |
| 1.40 | Supplying , erection , testing and commissioning of Horizontal Motor pumping set for clear water having head 40.00 mtr as per the indicated requirements of discharge in 5000LPM and power capacity in ( Discharge 5000 LPM) | 2 | Each | 4,35,000 ₹8.7 L | 3,00,000 ₹6 L | 5,00,000 ₹10 L | 4,50,000 ₹9 L | 5,60,000 ₹11.2 L |
| 1.50 | Credit of clear water Pumping machinery 2400 LPM x 40M Head.... | 2 | No. | 35,000 -₹70,000 | 5,000 -₹10,000 | 15,000 -₹30,000 | 15,000 -₹30,000 | 37,000 -₹74,000 |
| 1.60 | Credit of raw water Pumping machinery 2000 LPM x 12M Head.... | 2 | No. | 35,000 -₹70,000 | 10,000 -₹20,000 | 10,000 -₹20,000 | 15,000 -₹30,000 | 30,000 -₹60,000 |
| 1.70 | credit of steel...1 | 42,450 | Kg. | 20 -₹8,49,000 | 20 -₹8,49,000 | 15 -₹6,36,750 | 5 -₹2,12,250 | 62 -₹26,31,900 |
| 1.80 | Operation and Maintenance of Raw water pumping station, inlet channel, pump chamber, raw water rising main raw water construction of houdies, raw water sump well, D.G set installation and water Treatment plant of 2.00 MLD SCADA Based for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (Will be charged to the A/mtc estimate). Complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | 1,35,000 ₹1.4 L | 4,00,000 ₹4 L | 2,00,000 ₹2 L | 5,00,000 ₹5 L | 5,00,000 ₹5 L |
| 1.90 | 1st year Operation and maintenance after defect liability period | 1 | Job | 2,35,000 ₹2.4 L | 4,00,000 ₹4 L | 2,50,000 ₹2.5 L | 5,00,000 ₹5 L | 6,20,000 ₹6.2 L |
| 2.00 | 2nd year Operation and maintenance | 1 | Job | 3,35,000 ₹3.4 L | 4,00,000 ₹4 L | 2,50,000 ₹2.5 L | 5,00,000 ₹5 L | 8,20,000 ₹8.2 L |
Tender Value
₹11.2 Cr
EMD Value
₹22.4 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SOHAN LAL
Hisar PHED No. 1
Agroha DNIT for augmentation and R W Pumping Station Laying DI Pipeline in Place of Old ACPVC Pipe in village Agroha
2026_HRY_502597_1
202612444B26 F03C 4D75 983F F98C5F0B8700564PUH
Open Tender
Civil Works
500 days
AGROHA
Agroha DNIT for augmentation and R W Pumping Station Laying DI Pipeline in Place of Old ACPVC Pipe in village Agroha
2 documents required · 2 mandatory
₹20,000
₹22.4 L
Yes
25 Apr 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
14 Feb 2026 - 20 Feb 2026
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_581273.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid