Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.3 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹19.2 L+₹1.9 L (10.8%)Accepted-Finance | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹19.6 L+₹2.3 L (13.2%)Accepted-Finance | L-3 | Accepted-Finance Admitted |
Tender Value
₹19.2 L
EMD Value
₹20,000
Closing Date
3 Mar 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle, 220 KV S/S Campus Natwa, Mirzapur
Construction of new 220 KV Main bus-II, bus bar strengthening of 220 KV Main bus-I, 220 KV Bus Coupler bay and 132 KV Bus bar Splitting at 220 KV S/S Mirzapur under ETD Mirzapur
2022_UPTCL_753757_2
49/2022-23/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
90 days
Mirzapur
As per tender specification
2 documents required · 2 mandatory
₹590
Executive Engineer, ETD, Mirzapur
₹20,000
22 Mar 2023
15 Feb 2023
4 Mar 2023
15 Feb 2023
3 Mar 2023
15 Feb 2023
Amount
[A] Supply
PG Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR Tarantulla to Zebra PG Clamp
PG Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR Zebra to Zebra PG Clamp
Double Suspension fitting for Tarantulla Conductor with turn buckle for 300 mm spacing comprising 1x60 no. 120/70 KN disc insulator as per technical specification
Double Suspension fitting for Zebra Conductor with turn buckle for 300 mm spacing comprising 1x60 no. 120/70 KN disc insulator as per technical specification
Single Suspension fitting for Zebra Conductor with turn buckle with 120/70 KN disc insulator as per technical specificati
Double Tension fitting for Tarantulla conductor with turn buckle for 300 mm spacing comprising 1x60 no. 120/70 KN disc insulator as per technical specification
Double Tension fitting for zebra conductor with turn buckle for 300 mm spacing comprising 1x60 no. 120/70 KN disc insulator as per technical specification
Single Tension fitting for moose conductor with turn buckle with 120/70 KN disc insulator as per technical specificati
Spacer suitable for tarantulla conductor with 02 bolts, 300 mm spacing complete with hot dip galvanised nut , bolt, plain & spring washer
Spacer suitable for Zebra conductor with 02 bolts, 200 mm spacing complete with hot dip galvanised nut , bolt, plain & spring washer
Twin isolator clamp made of alluminium alloy LM-6 alongwith 08/12 galvanised nut & bolts, spring & plain washer suitable for Zebra
PI Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR twin tarantulla conductor
PI Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR twin zebra conductor
PG Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR Tarantulla to Tarantulla conductor
PG Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR moose to moose conductor
PG Clamp made of alluminium alloy LM-6 alongwith 04 galvanised nut & bolts, spring & plain washer suitable for ACSR moose to zebra conductor
Twin isolator clamp made of alluminium alloy LM-6 alongwith 08/12 galvanised nut & bolts, spring & plain washer suitable for Tarantulla conductor
Twin isolator clamp made of alluminium alloy LM-6 alongwith 08/12 galvanised nut & bolts, spring & plain washer suitable for Moose conductor
[B] Work
Detail of works for construction of new 220 KV Main bus-II
Complete installation , commissioning & cable connection of following equipments as per instruction manual of various equipments and technical specifications of UPPTCL including shifting of materials/equipments from store to erection site and including all other associated work to complete the job
Tendom isolator
245 KV tendom isolator with post insulator (motorised)
Bus isolator
245 KV Bus isolator with post insulator without E/S(motorised)
Capacitor voltage transformer
245 KV CVT
245 KV CVT Junction box
Post insulator for support
245 KV Post insulator
Stringing of main bus bar -II upto 180 (36x5) Mtr. each span 36 mtr. long with twin tarantulla conductor in each phase by tightening with gantry and fixing of spacer clamp at an equal interval between both tarantulla conductor and hardware fitting parallel to existing 220 KV Main bus-I including fixing of 120/70 KN Disc insulator/Tension fitting/suspension fitting/PG clamps etc. Cutting of conductor and also shifting of all material from store to site of work and all other associated work to complete the job satisfactory.
Dismentalling of existing 245 KV CT of 160 MVA T/F-I at first dismentalling of jumper of all 3-Phase CT , all connection of CT, Junction box of CT and lowering down of 245 KV existing CT on ground level and then dismentalling of BCT structure of CT.
Dismentalling of existing 245 KV Post insulator for support connected from jack bus of 160 MVA T/F-I and then dismentalling of all 03 Nos. ALP structure.
Erection of BCT structure at new place under jack bus of 160 MVA T/F-I.Complete installation & commissioning of 245 KV CT including Junction box and then jumpering from Jack bus of T/F. earthing of equipment with 75x10 MS Flat and auxilary structure by 50x10 mm MS Flat.
Maintaining safety clearance between BCU building to gantary of main Bus bar-II. Fabrication and making proper holes by drill machine & fixing channel top to the gantary on both side of all 3-Phase for proper setting of post insulator. Safe carriage of post insulator from store to site and fixing to the top of BXM gantary on fabricted channel including proper hole matching of channel to post insulator.Cross jumpering of main bus through post insulator including proper suspension fitting and PG Clamp to maintain proper clearance. Angle & PI shall be provided by department. All men & T&P shall be provided by contractor including in cost.
Dismentalling of existing 245 KV BSI of all 220 KV bay connected from main bus-I. At first lowering down of all jumper connected from main bus to BSI and BSI to CB, cutting of earthing of all equipment and structure then dismentalling of all 245 KV BSI. Finally dismentalling of all CBT structure from its foundation.
Bay wise interconnection of equipment with specified twin Zebra conductor .
Jumpering between main bus-II to BSI of all 220 KV bay with twin Zebra conductor including fixing of spacer at equal interval including hardware fitting/PG Clamp etc.
Jumpering between BSI to CB including tendom isolator with twin zebra conductor of all 220 KV bay including fixing of spacer at equal interval including hardware fitting/PG Clamp etc.
Jumper between Main bus-II to 245 KV CVT including proper suspension fitting, 120/70 KN disc insulator and PG Clamp
Dropper between Jack bus of 160 MVA T/F-I to main bus-II with proper hardware fitting and PG Clamp.
Jumpering between Main bus-II to HV side bushing of 160 MVA T/F-I including proper suspension fitting, 120/70 KN disc insulator and PG Clamp etc.
Dropper between HV bushing of 160 MVA T/F-I to LA including proper suspension fitting, 120/70 KN disc insulator and PG Clamp etc.
Erection of Lattice type main and Auxiliary structures(FTM-05 set, DTM- 03 set,ETM-03 set, XMM-06 set, YPM-06 set, BXM-11 set, CLI-06 set, CBT-08 set, BCT-09 set, ALP-27 set, BBL-01 set) including shorting, shifting, cutting, bending, matching of hole where necessary straightening and other associated work to complete the job. As per technical specifications of UPPTCL including shifting of materials/equipments from store to erection site and including all other associated work to complete the job.
Detail of works for Bus bar strengthning of 220 KV Main bus-I
The following work are to be carried out for strengthning (doubling) of 220 KV Main bus bar-I
Dismentalling of existing 220 KV Bus bar of single Tarantulla conductor along with tension fittings and disc insulators then its lowering down the ground from both side of gantary in three nos. span (3x3=09 Nos. Conductor) , including shifting and proper stacking of dismanteled material in store of 220 KV S/S Mirzapur with the help of suitable T&P and skilled labour with full safety precaution.
Stringing of new 220 KV Bus bar of twin tarantulla conductor by tightening with gantery along with hoisting, stringing, clamping, fixing of spacer clamp at an equal interval between both tarantulla conductor and hardware fitting with help of suitable T&P and skilled labour with full safety precautions including all associated works.
Fixing and tightening of twin zebra conductor jumper with suitable spacer from 220 KV Main bus bar to TI.
Detail of works for Construction of 220 KV Bus coupler bay
Stringing of Jack bus bar upto 54 Mtr. long with twin tarantulla conductor in each phase by tightening with gantery and fixing of spacer clamp at an equal interval between both tarantulla conductor and hardware fitting including fixing of 120/70 KN Disc insulator/Tension fitting/suspension fitting/PG clamp etc. Cutting of conductor and also shifting of all material from store to site of work and all other associated work to complete the job satisfactory.
Stringing of bus bar upto 8 Mtr. long with twin tarantulla conductor in each phase by tightening with gantery and fixing of spacer clamp at an equal interval between both tarantulla conductor and hardware fitting including fixing of 120/70 KN Disc insulator/Tention fitting/suspention fitting/PG clamp etc. Cutting of conductor and also shifting of all material from store to site of work and all other associated work to complete the job satisfactory.
Complete installation , commissioning & cable connection of following equipments as per instruction manual of various equipments and technical specifications of UPPTCL including shifting of materials/equipments from store to erection site and including all other associated work to complete the job
Bus isolator
245 KV Bus isolator with post insulator without E/S(motorised)
Circuit breaker
245 KV SF6 Circuit breaker
Current transformer
245 KV Current transformer
245 KV CT Junction box
220 KV Bus coupler control & relay panel SAS based
Bay wise interconnection of equipment with specified twin Zebra conductor .
Jumpering between Main bus bar-II to BSI
Jumpering between CB to BSI
Dropper between Jack bus to CB
Jumpering between bus bar to CT
Jumpering between CT to Jack bus including suspension fitting, 120/70 KN Disc insulator & PG Clamp etc.
Dropper between Jack bus to 220 KV Main bus-I
Laying of following size of control cable in cable trench from various equipment to control pnel/Junction box with proper dressing and sadding of cable at every 75 mm distance with MS Saddle of size 25x3 mm including carriage of cable drum from store to site and shifting back to store and fixing of cable tray as per cable schedule as per layout and technical specifications of UPPTCL and all other associated work to complete the job.
2 Core x 2.5 sq. mm
4 Core x 2.5 sq. mm
6 Core x 2.5 sq. mm
10 Core x 2.5 sq. mm
In newly constructed 220 KV Bus bar-II, 220 KV Bus coupler bay, 132 KV Bus splitting termination of all control cable as per cable schedule including making necessary hole in gland required. Supply and fixing of suitable cable gland of appropriate size, supply and providing ferrules in each core of cable and its termination with Lugs and all other associated work to complete the job.
In newly constructed 220 KV Bus bar-II, 220 KV Bus coupler bay, 132 KV Bus splitting bay earthing of various equipment by MS Flat of following size including painting by standard quality primer then two coat of green paint
75X10 mm MS Flat
50X6 mm MS Flat
25X6 mm MS Flat
Laying of earthmat in the extended 220 KV Main bus-I&II bay by digging upto 01 meter in X-Y axis in ground and laying of 40 mm MS round bae as per drawing and standard norms and connecting it by 40 mm MS round bar spikes of lenth 3.00 meter and grouting it in ground at edge of earthmat in the corner alongwith welding of earthmat at crossing point by double angle/MS Flat. then connecting it to main earthmat of switchyard by welding MS Flat. Complete work in totality by engaging sufficient man power and T&P. Earthmat material (MS round bar) shall be provided by department.
Detail of works for splitting of 132 KV Main bus bar
Complete installation , commissioning & cable connection of following equipments as per instruction manual of various equipments and technical specifications of UPPTCL including shifting of materials/equipments from store to erection site and including all other associated work to complete the job
Bus isolator
145 KV Bus isolator with post insulator without E/S(motorised)
Potential Transformer
145 KV Potential Transformer
145 KV PT Junction box
Dismentalling of twin Jumper between 132 KV Jigna-I bay and 160 MVA T/F-II bay of 132 KV Main bus including Suspension fitting , 120/70 KN disc insulator & PG Clamp etc.
Jumpering between 132 KV Main bus to 132 KV Bus section isolator with twin tarantulla conductor and fixing of spacer clamp at an equal interval between both tarantulla conductor
Dismentalling of PT connection of 160 MVA T/F-II & III, 20 MVA T/F-I&II and 40 MVA T/F connected from existing 132 KV Main bus PT-I and reconnecting from newly constructed 132 KV Main bus PT-II connected from 132 KV Main bus including all other associated work to complete the job
Supply and fixing of 100 W outdoor LED street lights, Aluminium die cast, waterproof, Rustproof white lights for street wall mounted Ledure/Havells/Syska/Crompton/Bajaj make.
Supply and fixing of (3X2) feet iron make board with 2 nos. of leg for writing of name of bay. At first grouting of iron board then written of name of bay with two coating of red oxide primer and two coating of black coated then writing of name of bay from Yellow paints. All man, material & T&P shall be provided by contractor including in cost.
ASIA ENTERPRISES
VK Fabricators and Erectors
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .