Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-Finance | 1 | Accepted-Finance ACCEPTED | |
| 2 | 2₹4.7 L+₹34,611 (7.96%)Accepted-Finance | 2 | Accepted-Finance ACCEPTED | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | SAIGURU COMMUNICATIONS L1 | CKV ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation (for narrow excavation) in hard stiff clay, stiff block cotton hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelley soil with an initial lead of 10m and lift of 2m including cost of all materials, lead and lift etc., complete and directed by Engineer at site. | 70 | M3 | 100 ₹7,000 Lowest | 209 ₹14,630 |
| 2.00 | Plain cement concrete 1:4:8 using 40mm size graded HBG stone including cost of all materials labour, curing charges, lead lifts etc., complete for foundation & flooring ans as directed by Board Engineer at Site. | 8 | M3 | 4,250 ₹34,000 Lowest | 4,270 ₹34,160 |
| 3.00 | Brick work in CM 1:5 using Second class Ground moulded chamber Burnt Bricks including cost of all materials, labour charges, Scaffolding charges, Curing, leads and lifts etc., complete and as directed by Engineer. | 23 | M3 | 5,250 ₹1,20,750 Lowest | 5,271 ₹1,21,233 |
| 4.00 | Plastering with CM 1:5, 12mm thick on interior faces including cost of all materials, labour, scaffolding charges, curing charges, all leads & lifts etc., complete and as directed by Engineer at site. | 220 | M2 | 150 ₹33,000 Lowest | 252 ₹55,440 |
| 5.00 | Supply and fixing of 55x55x5mmMS angles including cost of all materials,labour charges,all leads& lifts etc ,complete | 880 | Kg | 58 ₹51,040 | 49 ₹43,120 Lowest |
| 6.00 | Supply and fixing RCC cable duct cover slab using R.C.C (1:1.5:3) mix using 12 to20mm HBG machine crushed metal including cost of all materials , lead, lift Transport, head load lead, labour charges, finishing the joints centering and curing etc., Complete and as directed by Board Engineer at site. | 14 | M3 | 7,000 ₹98,000 Lowest | 7,287 ₹1,02,018 |
| 7.00 | Providing Ribbed Tor Steel for Reinforecement rods in RCC including Cutting, Bending, Tying and fixing in Position as per Specification & Drawing, including Cost of all Materials, Steel Binding Wire, All leads & Lifts etc, complete and as directed by Board Engineer at site. | 1,300 | Kg | 70 ₹91,000 Lowest | 76 ₹98,800 |
Tender Value
₹6.5 L
EMD Value
₹6,600
Closing Date
1 Dec 2025, 10:00 amClosed
Superintending Engineer
SUBHA TOWERS, T.GODE ROAD, NAMAKKAL
Improvement to Komarapalayam 110 KV SS by providing new cable duct and cable duct cover slabs
2025_EB_624181_1
Spec No.10 2025-26 Dt.14.11.2025
Open Tender
Civil Works
Works
Namakkal
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,600
3 Dec 2025
17 Nov 2025
2 Dec 2025
17 Nov 2025
1 Dec 2025
17 Nov 2025
Amount
Earth work excavation (for narrow excavation) in hard stiff clay, stiff block cotton hard red earth, shales, murram, gravel stoney earth, and earth mixed with small size boulders and hard gravelley soil with an initial lead of 10m and lift of 2m including cost of all materials, lead and lift etc., complete and directed by Engineer at site.
Plain cement concrete 1:4:8 using 40mm size graded HBG stone including cost of all materials labour, curing charges, lead lifts etc., complete for foundation & flooring ans as directed by Board Engineer at Site.
Brick work in CM 1:5 using Second class Ground moulded chamber Burnt Bricks including cost of all materials, labour charges, Scaffolding charges, Curing, leads and lifts etc., complete and as directed by Engineer.
Plastering with CM 1:5, 12mm thick on interior faces including cost of all materials, labour, scaffolding charges, curing charges, all leads & lifts etc., complete and as directed by Engineer at site.
Supply and fixing of 55x55x5mmMS angles including cost of all materials,labour charges,all leads& lifts etc ,complete
Supply and fixing RCC cable duct cover slab using R.C.C (1:1.5:3) mix using 12 to20mm HBG machine crushed metal including cost of all materials , lead, lift Transport, head load lead, labour charges, finishing the joints centering and curing etc., Complete and as directed by Board Engineer at site.
Providing Ribbed Tor Steel for Reinforecement rods in RCC including Cutting, Bending, Tying and fixing in Position as per Specification & Drawing, including Cost of all Materials, Steel Binding Wire, All leads & Lifts etc, complete and as directed by Board Engineer at site.
CKV ENGINEERING (BID ID -1524255)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_746342.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .