Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance LAMTIBAHAL BRAJRAJNAGAR JHARSUGUDA 768216 | JHARSUGUDA | ODISHA | 768216 | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 CrAdmitted-Finance AT OPM COLONY BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | JHARSUGUDA | ODISHA | 768216 | ₹5.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.8 CrAdmitted-Finance AT CHUAKANI PO CHHUALIBERNA DIST JHARSUGUDA PIN 768216 | JHARSUGUDA | JHARSUGUDA | ODISHA | 768216 | ₹6.8 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAJ KISHOR SINGH L1 | NATH JEE ENTERPRISES L2 | SRINIBAS PRADHAN INFRA PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications ) | 8,415 | cum | 40 ₹3.4 L | 47.96 ₹4.0 L | 65 ₹5.5 L |
| 2.00 | Compacting Original Ground Supporting Embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | 8,415 | cum | 30 ₹2.5 L | 34.35 ₹2.9 L | 15 ₹1.3 L |
| 3.00 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) | 13,275 | cum | 100 ₹13.3 L | 158.71 ₹21.1 L | 160 ₹21.2 L |
| 4.00 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2) : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- I Material | 3,690 | cum | 1,160 ₹42.8 L | 1,473.99 ₹54.4 L | 1,900 ₹70.1 L |
| 5.00 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2 : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- III Material | 3,555 | cum | 1,160 ₹41.2 L | 1,338.96 ₹47.6 L | 1,850 ₹65.8 L |
| 6.00 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect. | 2,362.5 | cum | 1,900 ₹44.9 L | 2,041.31 ₹48.2 L | 2,700 ₹63.8 L |
| 7.00 | Cement Concrete Pavement ( Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. | 5,512.5 | cum | 4,300 ₹2.4 Cr | 3,795.41 ₹2.1 Cr | 5,000 ₹2.8 Cr |
| 8.00 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600 | 52.02 | Tonne | 34,000 ₹17.7 L | 38,687.24 ₹20.1 L | 60,000 ₹31.2 L |
| 9.00 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600 | 3.35 | Tonne | 40,000 ₹1.3 L | 50,883 ₹1.7 L | 62,000 ₹2.1 L |
| 10.00 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete. | 1,920 | cum | 200 ₹3.8 L | 247.62 ₹4.8 L | 350 ₹6.7 L |
Updated dates
Tender Value
₹8.7 Cr
EMD Value
₹10.9 L
Closing Date
27 Mar 2026, 5:00 pmClosed
Shri Kaushal Kumar
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438879957. 0663-2542779
Construction of PQC Coal Transportation Road outside of IB Valley Washery premises under ILBL OCP of Lakhanpur Area
2026_MCL_355422_1
MCL/Samb/Civil-TC/e-Tender /25-26/14 Dated 03.03.2026
Open Tender
Civil Works - Roads
2005 days
Lakhanpur Area MCL
As per tender documents.
5 documents required · 5 mandatory
₹10.9 L
30 May 2026
5 Mar 2026
30 Mar 2026
5 Mar 2026
27 Mar 2026
6 Mar 2026
5 Mar 2026 - 16 Mar 2026
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications )
Compacting Original Ground Supporting Embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 )
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2) : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- I Material
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2 : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- III Material
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect.
Cement Concrete Pavement ( Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600
Supplying and stacking good quality moorum at work site with all lead and royalty, all complete.
Construction of shoulder with moorum, grading to required slope and compacted to meet requirement of Table 300-2 (cost of moorum to be paid seperately)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) Oridinary soil Mechanical Means upto 3 m depth
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Plain/Reinforced cement concrete in sub-structure including formwork, shuttering etc. complete as per drawing and technical specifications PCC Grade M20 height upto 5 m
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 900 mm dia RCC Pipes
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) Oridinary soil Manual Means upto 3 m depth
Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 1200 mm dia RCC Pipes (laying by manual/mechanical means)
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_368277.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid