Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC LAMTIBAHAL BRAJRAJNAGAR JHARSUGUDA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | ₹5.1 Cr | L1 | Accepted-AOC Awarded being the L1 Bidder |
| 2 | L2₹5.1 Cr+₹3.0 L (0.58%)Rejected-Finance AT OPM COLONY BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | ₹5.1 Cr+₹3.0 L (0.58%) | L2 | Rejected-Finance Rejected not being the L1 bidder. |
| 3 | L3₹6.8 Cr+₹1.7 Cr (32.4%)Rejected-Finance AT CHUAKANI PO CHHUALIBERNA DIST JHARSUGUDA PIN 768216 | JHARSUGUDA | JHARSUGUDA | ODISHA | 768216 | ₹6.8 Cr+₹1.7 Cr (32.4%) | L3 | Rejected-Finance Rejected not being the L1 bidder. |
| Sl No | Description | Qty | Unit | RAJ KISHOR SINGH L1 | NATH JEE ENTERPRISES L2 | SRINIBAS PRADHAN INFRA PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications ) | 8,415 | cum | 40 ₹3,36,600 Lowest | 47.96 ₹4,03,583.4 | 65 ₹5,46,975 |
| 2.00 | Compacting Original Ground Supporting Embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | 8,415 | cum | 30 ₹2,52,450 | 34.35 ₹2,89,055.25 | 15 ₹1,26,225 Lowest |
| 3.00 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) | 13,275 | cum | 100 ₹13,27,500 Lowest | 158.71 ₹21,06,875.25 | 160 ₹21,24,000 |
| 4.00 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2) : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- I Material | 3,690 | cum | 1,160 ₹42,80,400 Lowest | 1,473.99 ₹54,39,023.1 | 1,900 ₹70,11,000 |
| 5.00 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2 : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- III Material | 3,555 | cum | 1,160 ₹41,23,800 Lowest | 1,338.96 ₹47,60,002.8 | 1,850 ₹65,76,750 |
| 6.00 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect. | 2,362.5 | cum | 1,900 ₹44,88,750 Lowest | 2,041.31 ₹48,22,594.88 | 2,700 ₹63,78,750 |
| 7.00 | Cement Concrete Pavement ( Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. | 5,512.5 | cum | 4,300 ₹2,37,03,750 | 3,795.41 ₹2,09,22,197.62 Lowest | 5,000 ₹2,75,62,500 |
| 8.00 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600 | 52.02 | Tonne | 34,000 ₹17,68,697 Lowest | 38,687.24 ₹20,12,529.57 | 60,000 ₹31,21,230 |
| 9.00 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600 | 3.35 | Tonne | 40,000 ₹1,34,015.49 Lowest | 50,883 ₹1,70,477.75 | 62,000 ₹2,07,724.01 |
| 10.00 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete. | 1,920 | cum | 200 ₹3,84,000 Lowest | 247.62 ₹4,75,430.4 | 350 ₹6,72,000 |
Tender Value
₹8.7 Cr
EMD Value
₹10.9 L
Closing Date
23 Mar 2026, 5:00 pmClosed
Shri Kaushal Kumar
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438879957. 0663-2542779
Construction of PQC Coal Transportation Road outside of IB Valley Washery premises under ILBL OCP of Lakhanpur Area
2026_MCL_355422_1
MCL/Samb/Civil-TC/e-Tender /25-26/14 Dated 03.03.2026
Open Tender
Civil Works - Roads
Item Rate
2005 days
Lakhanpur Area MCL
As per tender documents.
5 documents required · 5 mandatory
₹10.9 L
18 Aug 2026
5 Mar 2026
25 Mar 2026
5 Mar 2026
23 Mar 2026
6 Mar 2026
5 Mar 2026 - 16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specifications ) | 8,415 | cum | 81 | ₹6,81,615 |
| 2 | Compacting Original Ground Supporting Embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | 8,415 | cum | 58 | ₹4,88,070 |
| 3 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section - 300 ) | 13,275 | cum | 268 | ₹35,57,700 |
| 4 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2) : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- I Material | 3,690 | cum | 2,489 | ₹91,84,410 |
| 5 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 4OO-1 & Table 400-2 : Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. For grading- III Material | 3,555 | cum | 2,261 | ₹80,37,855 |
| 6 | Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 26.5 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing as per clause 601 of specifications complete in all respect. | 2,362.5 | cum | 3,447 | ₹81,43,537.5 |
| 7 | Cement Concrete Pavement ( Construction of un-reinforced, dowel jointed, plain cement concrete pavement (minimum flexural strength - 4.5 Mpa) over a prepared sub base with cement @ 400 kg per cum (minimum), coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a batching and mixing plant as per approved mix design,transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. | 5,512.5 | cum | 6,409 | ₹3,53,29,612.5 |
| 8 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification and as per relevant clause of section 1600 | 52.02 | Tonne | 65,328 | ₹33,98,395.22 |
| 9 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications and as per relevant clause of section 1600 | 3.35 | Tonne | 85,922 | ₹2,87,871.97 |
| 10 | Supplying and stacking good quality moorum at work site with all lead and royalty, all complete. | 1,920 | cum | 418.15 | ₹8,02,848 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_368277.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .