| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.5 L+₹31,510 (8.08%)Accepted-AOC 72 USMAN ENCAVE SECTOR O ALIGANJ LUCKNOW 226004 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226004 | L2 | Accepted-AOC Accepted | |
| 3 | L3₹3.8 L+₹36,955 (9.48%)Accepted-AOC | L3 | Accepted-AOC Accepted | |
| 4 | Rejected-Technical | - | Rejected-Technical EMD is not as per NIT |
Tender Value
₹4.0 L
EMD Value
₹8,100
Closing Date
20 Mar 2020, 6:00 pmClosed
COA
CSIR-CIMAP Lucknow
Replacement of existing old non energy efficient ceiling fans with energy efficient ceiling fans at CSIR-CIMAP colony, Lucknow
2020_CSIR_45458_1
68_021/815/2019-MP (Works)
Open Tender
Electrical Works
Works
60 days
CSIR-CIMAP
A Grade Electrical Contractor
2 documents required · 2 mandatory
₹560
Director
₹8,100
1 Sept 2020
9 Mar 2020
23 Mar 2020
9 Mar 2020
20 Mar 2020
9 Mar 2020
9 Mar 2020 - 20 Mar 2020
Amount
Supplying of ceiling fan having double ball bearings copper winding with all standard accessories as required of following sweep suitable for operation on 230V AC, single phase, 50Hz supply including powder coated down rod as per site requirements. 1400 mm sweep (Havells / Bajaj / Crompton) or equivalent
Installation, testing and commissioning of ceiling fan including wiring the down rods of standard length (up to 30cm) with 1.5 sq.mm FR PVC insulated, copper conductor, single core cable etc. as required
Supplying and fixing of stepped type electronic fan regulator on the existing switch board including connections etc. as required.
BUYBACK IS MANDATORY: Buy back of replaced old existing ceiling fans of various sweep sizes (1200mm and 1400mm) installed in various locations / quarters in the colony premises. All the ceiling fans are in working condition of different manufacturers. The firm has to disconnect, transport, and take back all the existing ceiling fans from the installation place. A detail is needed to be prepared and the same should be submitted by the firm to issue gate pass to take the materials outside the colony. Format will be given by concerned Engineer In-Charge towards the issue of gate pass. Nothing will be paid extra on any account. The firm may physically inspect and check all the buyback materials before quoting the price.
UNNATI ENGINEERS
Ankur Enterprises
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .