| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAccepted-Finance | ₹44.6 L | L1 | Accepted-Finance BEING L1 |
| 2 | L2₹51.3 LAccepted-Finance | ₹51.3 L | L2 | Accepted-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | Paras Electricals L2 | M/s.TIRUPATI BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in soft/loose soil complete all as specified and directed | 165 | Square Metre | 50 ₹8,250 | 40 ₹6,600 |
| 2.00 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in hard/ dense soil complete all as specified and directed. | 18.9 | Cubic Metre | 300 ₹5,670 | 250 ₹4,725 |
| 3.00 | Excavating in post holes (or similar holes) each not exceeding 0.5 cu. m, getting out in hard/ dense soil and removing surplus soil to a distance exceeding 500 m and making good surface. | 36 | Each | 250 ₹9,000 | 200 ₹7,200 |
| 4.00 | Removing excavated surplus soil to a distance exc 250 mts but not exceeding 500mts . and depositing where directedcomplete all as directed. | 15 | Cubic Metre | 200 ₹3,000 | 150 ₹2,250 |
| 5.00 | M & L for Hard core of broken hard stone or boulders of guage not exceeding 63 mm , deposited spread as subbase to inter locking tiles in layers n.exc 15cm thick , watered & well rammed to true surface complete all as specified and directed. | 36 | Cubic Metre | 1,850 ₹66,600 | 1,800 ₹64,800 |
| 6.00 | M & L for PCC 1 :2 :4 type B2 using 40 mm graded crushed stone aggregate as in foundation filling mass concrete complete all as specified and directed | 4.37 | Cubic Metre | 6,500 ₹28,405 | 6,000 ₹26,220 |
| 7.00 | Providing precast ce- ment concrete Type B1 1:2 :4 using 20 mm graded crushed stone aggregate in window or door cills, lintels, bressumers, steps, quoin blocks (for use with masonry),string courses, copings. kneelers, apex stones, pier caps, columns, posts , boundary pillars, bed plates, pintle blocks, ancho-rage blocks, bonders (for stone wallin). corbels, brackets,etc. (of any section indicated), with plain fair faces, including chamfers, weatherings, throat- ing etc. and setting in mortar complete with joints to match Set in cement mortar 1:4 complete all as directed. | 0.58 | Cubic Metre | 9,500 ₹5,510 | 9,000 ₹5,220 |
| 8.00 | Supply only Integral Water Proofing Compound (ISI Marked) of Make : CICO, Acco Proof, Impermo, Aqua flex as approved. | 37.5 | Litre | 155 ₹5,812.50 | 150 ₹5,625 |
| 9.00 | M&L for brick work with old size Fly Ash bricks, straight or curved on plan exc 6.00 metre mean radius, built in cement mortar 1:4 complete all as specified | 24.2 | Cubic Metre | 6,560 ₹1.6 L | 6,000 ₹1.5 L |
| 10.00 | M&L for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted stone masonry built in cement mortar 1:4 complete all as specified & as directed. | 12.2 | Cubic Metre | 4,400 ₹53,680 | 4,000 ₹48,800 |
Updated dates
Tender Value
₹43.2 L
EMD Value
₹83,320
Closing Date
18 May 2026, 6:00 pmClosed
GE AF OJHAR
GE AF OJHAR AIR FORCE STATION OJHAR DIST NASHIK PIN 422221
PROVN OF DUST PROOF INFRASTRUCTURE, FENCING AND ALLIED WORK SERVICES VARIOUS LOCATIONS OF AT AF STN BORGAD UNDER GE (AF) OJHAR.
2026_MES_760697_1
8405/E8
Open Tender
Miscellaneous Works
180 days
GE AF OJHAR
As per tender documents
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹83,320
Yes
27 May 2026
17 Apr 2026
20 May 2026
17 Apr 2026
18 May 2026
1 May 2026
17 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in soft/loose soil complete all as specified and directed | - | Square Metre | - | - |
| 2 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in hard/ dense soil complete all as specified and directed. | - | Cubic Metre | - | - |
| 3 | Excavating in post holes (or similar holes) each not exceeding 0.5 cu. m, getting out in hard/ dense soil and removing surplus soil to a distance exceeding 500 m and making good surface. | - | Each | - | - |
| 4 | Removing excavated surplus soil to a distance exc 250 mts but not exceeding 500mts . and depositing where directedcomplete all as directed. | - | Cubic Metre | - | - |
| 5 | M & L for Hard core of broken hard stone or boulders of guage not exceeding 63 mm , deposited spread as subbase to inter locking tiles in layers n.exc 15cm thick , watered & well rammed to true surface complete all as specified and directed. | - | Cubic Metre | - | - |
| 6 | M & L for PCC 1 :2 :4 type B2 using 40 mm graded crushed stone aggregate as in foundation filling mass concrete complete all as specified and directed | - | Cubic Metre | - | - |
| 7 | Providing precast ce- ment concrete Type B1 1:2 :4 using 20 mm graded crushed stone aggregate in window or door cills, lintels, bressumers, steps, quoin blocks (for use with masonry),string courses, copings. kneelers, apex stones, pier caps, columns, posts , boundary pillars, bed plates, pintle blocks, ancho-rage blocks, bonders (for stone wallin). corbels, brackets,etc. (of any section indicated), with plain fair faces, including chamfers, weatherings, throat- ing etc. and setting in mortar complete with joints to match Set in cement mortar 1:4 complete all as directed. | - | Cubic Metre | - | - |
| 8 | Supply only Integral Water Proofing Compound (ISI Marked) of Make : CICO, Acco Proof, Impermo, Aqua flex as approved. | - | Litre | - | - |
| 9 | M&L for brick work with old size Fly Ash bricks, straight or curved on plan exc 6.00 metre mean radius, built in cement mortar 1:4 complete all as specified | - | Cubic Metre | - | - |
| 10 | M&L for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted stone masonry built in cement mortar 1:4 complete all as specified & as directed. | - | Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TENDER8405.pdf
Tender Documents • 0.73 MB
BOQ_852091.xls
BOQ • 0.85 MB
Download all tender documents and submit your bid