Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 CrAccepted-AOC 0 RAM SURAT MAURYA 0 SHAKARMANDI JAUNPUR JAUNPUR UTTAR PRADESH 222001 UDYAM UP 38 0066946 | JAUNPUR | UTTAR PRADESH | 222001 | ₹17.9 Cr | L1 | Accepted-AOC First Lowest amount quoted by the bidder is accepted |
| 2 | L2₹20.2 CrRejected-AOC NEW NO H 98 1 PERIYAR NAGAR ERODE 638 001 | ERODE | TAMIL NADU | 638001 | ₹20.2 Cr | L2 | Rejected-AOC Second Lowest amount quoted by the bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender documents produced by the bidder is not responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Tender documents produced by the bidder is not responsive |
| 5 | Rejected-Technical SAKTHI MAHAL NO 63 PERUNDURAI ROAD ERODE 638 011 | ERODE | TAMIL NADU | 638011 | - | - | Rejected-Technical Tender documents produced by the bidder is not responsive |
| Sl No | Description | Qty | Unit | GMS Elegant Builders I Pvt Ltd L2 | S K & CO L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling clearing away and carefully stacking materials usefull materials for reuse for any thickness of walls in brick or stone masonry in cement mortar walls under 3m high etc., complete complying with standard specifications and as directed by the Engineer incharge of work. (SI 12) Page no.21 | 674 | Cum | 250 ₹1.7 L | 229.62 ₹1.5 L |
| 2.00 | Dismantling the existing Plain Cement Concrete over Cut Stone Slab in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. | 78 | Cum | 530 ₹41,340 | 483.29 ₹37,696.62 |
| 3.00 | Dismantling clearing away and carefully stacking materials usefull materials for reuse for removal of cut stone slabs etc., complete complying with standard specifications and as directed by the Engineer incharge of work | 23 | Cum | 540 ₹12,420 | 509.87 ₹11,727.01 |
| 4.00 | Dismantling clearing away and carefully stacking materials usefull materials for reuse for dismantling lime concrete etc., complete complying with standard specifications and as directed by the Engineer incharge of work | 17 | Cum | 370 ₹6,290 | 351.75 ₹5,979.75 |
| 5.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with an extra lead of every 0 to 100m deploying earth moving machineries and tipper including benching formation of bunds breaking clods sectioning etc.,complete | 5,016 | Cum | 60 ₹3.0 L | 58.85 ₹3.0 L |
| 6.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial left 2m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam, and ordinary soil including excavated earth - Open Excavation - S.S.20B | 4,659 | Cum | 95 ₹4.4 L | 81.84 ₹3.8 L |
| 7.00 | Earth work Excavation in hard stiff clay,stiff black cotton soil, Hard red earth, shales, murrams, gravel, stoney earth and earth mixed small size blouders and hard grvelly soil depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and deposting the surplus earth in places as shown by the departmental offices with an initial lead of 10metres and initial left of 2 metres and clearing, levelling the site etc., complying with standard specification and as directed by the departmental officers. (For open excavation) | 780 | Cum | 130 ₹1.0 L | 122.52 ₹95,565.60 |
| 8.00 | Earthwork for foundation SDR - (Not Requiring Blasting) excavating and deposition on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and depositing the surplus earth in places as shown by the departmental officers etc., complete as per relevant standard specification. | 657 | Cum | 260 ₹1.7 L | 245.05 ₹1.6 L |
| 9.00 | Earthwork for foundation SDR - (Not Requiring Blasting) excavating and deposition on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and depositing the surplus earth in places as shown by the departmental officers etc., complete as per relevant standard specification | 1,812 | Cum | 200 ₹3.6 L | 182.49 ₹3.3 L |
| 10.00 | Earthwork for foundation SDR - (Not Requiring Blasting) excavating and deposition on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting depositing on bank including shoring strutting and bailing out water wherever necessary, well rammed consolidated and depositing the surplus earth in places as shown by the departmental officers etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS. | 1,312 | Cum | 400 ₹5.2 L | 364.98 ₹4.8 L |
Tender Value
₹19.2 Cr
EMD Value
₹9.7 L
Closing Date
28 Aug 2025, 3:00 pmClosed
Superintending Engineer,WRD
O/o The Superintending Engineer,WRD Thamiraparani Basin Circle Tirunelveli
Rehabilitation of Tharuvai Regulator and outlet at the confluence point of Pachaiyar River cum Flood Carrier Canal in Tharuvai Village of Palayamkottai Taluk of Tirunelveli District.
2025_WRD_592238_1
02SE/TBC/TNY/2025-26(1)
Open Tender
Civil Works - Water Works
730 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9.7 L
11 Nov 2025
13 Aug 2025
29 Aug 2025
13 Aug 2025
28 Aug 2025
13 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_707289.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid