| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-AOC OODLABARI P O MANABARI DIST JALPAIGURI WB PIN 735222 STATE WEST BENGAL | JALPAIGURI | WEST BENGAL | 735222 | L1 | Accepted-AOC RATES ARE FOUND REASONABLE AND BEING L1 BIDDER | |
| 2 | L2₹25.1 L+₹2.5 L (11.0%)Rejected-Finance | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 3 | L3₹25.8 L+₹3.2 L (14.3%)Rejected-Finance | L3 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 4 | L4₹28.7 L+₹6.1 L (27.1%)Rejected-Finance | L4 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 5 | L5₹28.9 L+₹6.3 L (27.9%)Rejected-Finance 14 NATIONAL COMMERCE HOUSE BUILDING CHURCH ROAD SILIGURI DAJEELING WEST BENGAL 734001 | DARJEELING | WEST BENGAL | 734001 | L5 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | ROZI KHAN L4 | KAMALA INDUSTRIES L5 | NARAYAN MAJUMDER L6 | M/S ARPAN RAKSHIT L2 | AJOY DEY L1 | PUSHPA CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) | |||||||||
| 1.01 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of RCC framed structure for single JCOs living accn with att bathrooms for 02 X JCOs type 'A' in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including garage cum scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22(R). | 1 | Lumpsum | 17,69,450 ₹17,69,450 | 19,00,000 ₹19,00,000 | 18,67,333.5 ₹18,67,333.5 | 15,69,047.37 ₹15,69,047.37 | 14,59,000 ₹14,59,000 Lowest | 16,97,560 ₹16,97,560 |
| 2.00SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) | |||||||||
| 2.01 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24. | 1 | Lumpsum | 1,34,520 ₹1,34,520 | 1,00,339 ₹1,00,339 Lowest | 1,37,484.59 ₹1,37,484.59 | 1,18,470.77 ₹1,18,470.77 | 1,02,000 ₹1,02,000 | 1,14,000 ₹1,14,000 |
| 3.00SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT) | |||||||||
| 3.01 | Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25. | 1 | Lumpsum | 2,47,500 ₹2,47,500 | 2,23,920 ₹2,23,920 | 2,30,842.13 ₹2,30,842.13 | 2,01,056.05 ₹2,01,056.05 | 1,74,000 ₹1,74,000 Lowest | 1,97,500 ₹1,97,500 |
| 4.00SCHEDULE 'A' PART-IV (AREA DRAINAGE) | |||||||||
| 4.01 | Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26 to 27. | 1 | Lumpsum | 2,07,500 ₹2,07,500 | 1,86,704.1 ₹1,86,704.1 | 2,07,917.8 ₹2,07,917.8 | 1,85,069.69 ₹1,85,069.69 | 1,74,000 ₹1,74,000 Lowest | 1,82,785 ₹1,82,785 |
| 5.00SCHEDULE 'A' PART-V (INTERNAL ELECTRIFICATION) | |||||||||
| 5.01 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 28(R) to 34(R). | 1 | Lumpsum | 1,81,000 ₹1,81,000 | 1,66,520 ₹1,66,520 | 1,62,358.04 ₹1,62,358.04 | 1,53,069.41 ₹1,53,069.41 | 1,25,000 ₹1,25,000 Lowest | 1,58,000 ₹1,58,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
PROVN OF 02 ROOMS (SINGLE JCOS ACCN) WITH ATT BATROOMS FOR 02 X JCOS TYPE A AT BAGRAKOTE MIL STN UNDER GE SEVOKE ROAD
2025_MES_740707_1
8281/E8
Open Tender
Civil Works
Lump-sum
180 days
SEVOKE ROAD MIL STN
AS PER NIT
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹60,000
Yes
22 Jan 2026
20 Nov 2025
26 Dec 2025
20 Nov 2025
25 Dec 2025
18 Dec 2025
Amount
SCHEDULE 'A' PART-I (BUILDING & STRUCTURE)
Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of RCC framed structure for single JCOs living accn with att bathrooms for 02 X JCOs type 'A' in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including garage cum scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22(R).
SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE)
Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24.
SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT)
Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25.
SCHEDULE 'A' PART-IV (AREA DRAINAGE)
Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26 to 27.
SCHEDULE 'A' PART-V (INTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 28(R) to 34(R).
SCHEDULE 'A' PART-VI (SEWAGE DISPOSAL)
Lump sum price worked out by the contractor for SEWAGE DISPOSAL as listed in Schedule ‘A’ Part-VI of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VI on Serial Page No. 35 to 38.
SCHEDULE 'A' PART-VII (EXTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-VII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VII on Serial Page No. 39.
SCHEDULE 'A' PART-VIII (INTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for (INTERNAL WATER SUPPLY) as listed in Schedule ‘A’ Part-VIII of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VIII on Serial Page No. 40 to 41.
SCHEDULE 'A' PART-IX (EXTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for (EXTERNAL ELECTRIFICATION) as listed in Schedule ‘A’ Part-IX of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IX on Serial Page No. 42(R).
SCHEDULE 'A' PART-X (MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (TO BE QUOTED BY CONTRACTOR))
M & L for horizontal boring across the existing road without disturbing the road surface for inserting GI pipe, Complete all as specified and directed by Engineer-in-Charge. Note :- GI pipe Shall be measured and paid respective
S&F of Modular TV socket, 1 module 6 Amp one way including back plate and top cover fixed flushed to wall, ISI marked, complete all as specified and as directed by Engineer-in-charge.
M&L for construction of valve chamber with MS sheet cover 3 mm thick with angle iron frame of size 50 x50x6mm and locking arrangements, with handle duly painted with one coat of primer and two coats of black synthetic enamel paints including excavation and earth work in any type of soil, PCC (1:4:8) type D-2 in foundation, PCC benching (1:2:4) type B-1, PCC (1:5:8) block masonry 20 cm thick in cement mortar (1:6), 10 mm thick plastering in CM 1:4, PCC bed in (1:3:6) and coping 50 mmm thick in cement concrete 1:2:4 type B-1 using 20 mm stone aggregate including necessary formwork, painting one coat of red oxide and two coats of bituminous black paint on all metallic surface as s[specified as directed of sizes 900 X 900X 900 mm (internal dimensions), complete all as per specified and as directed by Engineer-in-charge.
S&F of 50mm outer diadouble corrugated pipe (DWC) for enclosing cable below below ground/ road surface to a required depth including suitable couplers for joining of pipe complete all as specified and as directed by Engineer-in-charge.
M/S ARPAN RAKSHIT (BID ID -3504807)
PUSHPA CONSTRUCTION (BID ID -3502948)
ROZI KHAN (BID ID -3514088)
KAMALA INDUSTRIES (BID ID -3504379)
NARAYAN MAJUMDER (BID ID -3514287)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
8281TenderDocuments.pdf
Tender Documents • 3.61 MB
8281_SCH_A.pdf
Additional Documents • 0.50 MB
All_TD_DRW_merge.pdf
Additional Documents • 22.65 MB
drawings.pdf
Additional Documents • 4.86 MB
BOQ_829416.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .