Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC GALA NO B 128 129 130 SATYAM INDUSTRIAL ESTATE OFF KARVE ROAD OPP SNDT COLLEGE ERANNDWANE PUNE 411038 PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | L1 | Accepted-AOC ACCEPTED DUE TO LOWEST | |
| 2 | L2₹27.0 L+₹2.2 L (8.96%)Rejected-AOC | L2 | Rejected-AOC REJECTED DUE TO NOT LOWEST | |
| 3 | L3₹27.1 L+₹2.4 L (9.60%)Rejected-AOC 203 VARDHMAN ENTRANCE PLAZA LSC NASEERPUR DWARKA SECTOR 1A PHASE 1 NEW DELHI 110075 | NEW DELHI | NEW DELHI | DELHI | 110075 | L3 | Rejected-AOC REJECTED DUE TO NOT LOWEST | |
| 4 | L4₹27.6 L+₹2.9 L (11.5%)Rejected-AOC AT POST ARANGAON MEHERABAD TAL DIST AHMEDNAGAR PIN 414006 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414006 | L4 | Rejected-AOC REJECTED DUE TO NOT LOWEST | |
| 5 | L5₹30.8 L+₹6.0 L (24.3%)Rejected-AOC PLOT NO 4 SUDARSHAN ROW RESIDENCY GAWADE MALA PIPELINE ROAD SAVEDI AHMEDNAGAR 414003 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414003 | L5 | Rejected-AOC REJECTED DUE TO NOT LOWEST |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
6 Apr 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) LOHEGAON
GE (AF) LOHEGAON, PUNE -411032
OUTSOURCING OF SERVICES FOR MANAGEMENT OF ELECTRIC SUPPLY INSTALLATION AT VIMAN NAGAR, 509 AREA AND 9 BRD AT AF STN PUNE
2021_MES_429946_1
8447/E8
Open Tender
Miscellaneous Works
Item Rate
330 days
GE (AF) LOHEGAON
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE (AF) LOHEGAON
₹88,000
Yes
17 May 2021
11 Mar 2021
8 Apr 2021
11 Mar 2021
6 Apr 2021
25 Mar 2021
60 days
Amount
Outsourcing of services for operation and maintenance of Control panels , and switch yard etc complete at HT 22 /11 KV MRS 509 electrical installation and connected LT switch gears round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift 03 shifts per day) by deploying skilled electrician to maintain the records and attending the complaints pertaining to electric supply complete all as specified and directed. (a) First Shift - 0600 Hrs to 1400 Hrs -One skilled Electrician (b) Second shift-1400Hrs to 2200Hrs- One skilled Electrician (C) Third Shift -2200Hrs to 0600Hrs - One skilled Electrician
Outsourcing of services for operation and maintenance of Control panels , and switch yard etc complete at HT 22 /11 KV MRS 9 BRD electrical installation and connected LT switch gears round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift 03 shifts per day) by deploying skilled electrician to maintain the records and attending the complaints pertaining to electric supply complete all as specified and directed. (a) First Shift - 0600 Hrs to 1400 Hrs -One skilled Electrician (b) Second shift-1400Hrs to 2200Hrs- One skilled Electrician (C) Third Shift -2200Hrs to 0600Hrs - One skilled Electrician
Outsourcing of services for operation and maintenance of HT 11 KV electrical installation and and LT switch gears at Viman Nagar Power house round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift 03 shift per day) by deploying skilled electrician to maintain the records and attending the complaints pertaining to electric supply complete all as specified and directed. (a) First Shift - 0600 Hrs to 1400 Hrs -One skilled Electrician (b) Second shift-1400Hrs to 2200Hrs- One skilled Electrician (C) Third Shift -2200Hrs to 0600Hrs - One skilled Electrician
Outsourcing of services for operation and maintenance of HT 22/11 KV electrical installation and and LT switch gears at 509 area Power House round the clock, seven days a week incl Sunday/holiday (8 Hrs each shift 03 shifts per day ) by deploying skilled electrician to maintain the records and attending the complaints pertaining to electric supply complete all as specified and directed. (a) First Shift - 0600 Hrs to 1400 Hrs -One skilled Electrician (b) Second shift-1400Hrs to 2200Hrs- One skilled Electrician (C) Third Shift -2200Hrs to 0600Hrs - One skilled Electrician
Note :- For Srl item No 1.00 to 4.00 (i) Contractor shall submit the nominal roll and qualification certificate of operator with in 15 days of acceptance. (ii) The Operator shall must be ITI qualified in Electrical Engineering or shall have 10th Class passed with experience of minimum 05 years experience in operation of 22/11 KV Electric supply Installation to perform duty at installation of Item No 1 and 2. and shall be ITI qualified in Electrical Engineering or shall have 10th Class passed with experience of minimum 05 years in operation of HT Electric supply Installation to perform duty at installation of Item No 3 & 4 (iii) Contractor shall ensure attendance of all operators shift wise if any operator found absent from duty a recovery of double the rate quoted by the contractor against each shift/item shall be made. (iv) All necessary T&P including uniform shall be provided by the contractor to the operators at no extra cost. The rates for the same is deemed to be included in the unit rates of the items. (v) The contractor shall provide of all the necessary stationery such as log book ,attendance register etc to the operator for maintenance the plant running record. (vi) All operator shall wear proper uniform on duty. (vii) Contractor have to submit the payment proof in AADHAR linked Accouts of operators account at the time of submission of RAR. (viii) Contractor shall provide Notice Board of each installation with in 15 days from the date of commencement of contract. (ix) Area cleaning including cutting of grasses etc up to 3 meters from the plinth protection all around the electrical installation (x) Contractor shall submit the monthly duty roster of each installation before 03 days of respective month. (xi) Suitable reliever to be provided during off shift operator as per the labour law. (xii) If the quoted amount is less than the estimated cost of the work, then the lowest bidder will have to deposit FDR/BGB in favour of Accepting Officer within 07 days of opening of Financial Bid for the difference in estimated cost & quoted amount. In case the said FDR/BGB is not submitted within the stipulated period as mentioned above, the contractor shall be banned for 06 months & his bid will be rejected. FDR/BGB shall be released only after satisfactory completion of work including defect liability period of contract whenever applicable. (xiii) The minimum wages are revised every six months, therefore the rates quoted shall be applicable as on bid submission end date and the bidder shall undertake to pay only as per minimum wages revised from time to time in future during the contract period and the contractor shall have no claim whatsoever on this account.
KSP ENTERPRISES
HVAC Engineering Co
Smruti Construction
Maruti Abhiyantriki
Garg Engineers
Apurva constructions
metro electrical services
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .