Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹14.8 CrAdmitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GE POWER INDIA LIMITED |
|---|---|---|---|---|
| 1.00 | FOR MATERIAL SUPPLY: Design, Engineering, manufacturing, Supply of Pendent Re- heater coils from swaged tube (63.5x4.0mm to 51.0x4.0mm) of inlet leg to outlet leg(up to HRH outlet header connection) including all support arrangement & Header bend for Unit No.3 & 4 of 210 MW ABL Make Boiler at SGTPS Birsinghpur. 2x55 Sets =110 Sets
(55 Sets per Units) | 2 | Lot | 7,84,57,856 ₹9,25,80,270.08 Lowest |
| 2.00 | For Work: Dismantling of existing Coils & Erection, Testing & Commissioning of new Pendent Re- heater coils from inlet leg to outlet leg (up to HRH outlet header connection) in Unit No. 3 & 4 of 210 MW ABL Make Boiler at SGTPS Birsinghpur | 2 | Job | 4,70,07,418 ₹5,54,68,753.24 Lowest |
Tender Value
₹14.8 Cr
Closing Date
10 Jan 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE P and W, SGTPS, MPPGCL, Birsinghpur
P and W Cell, SGTPS, MPPGCL, Birsinghpur
Supply and work of dismantling of existing Coils, Erection, Testing,Commissioning of complete set off new Pendent Re- heater coils from swaged tube of inlet leg to outlet leg including all support,arrangement, Header, bend for SGTPS U- 3 and 4 Brs
2026_MPPGC_472905_1
472905
Single
Miscellaneous Goods
Item Wise
90 days
SGTPS, MPPGCL, Birsinghpur
11 documents required · 11 mandatory
₹0
Exempted
17 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
10 Jan 2026
5 Jan 2026
FOR MATERIAL SUPPLY: Design, Engineering, manufacturing, Supply of Pendent Re- heater coils from swaged tube (63.5x4.0mm to 51.0x4.0mm) of inlet leg to outlet leg(up to HRH outlet header connection) including all support arrangement & Header bend for Unit No.3 & 4 of 210 MW ABL Make Boiler at SGTPS Birsinghpur. 2x55 Sets =110 Sets (55 Sets per Units)
For Work: Dismantling of existing Coils & Erection, Testing & Commissioning of new Pendent Re- heater coils from inlet leg to outlet leg (up to HRH outlet header connection) in Unit No. 3 & 4 of 210 MW ABL Make Boiler at SGTPS Birsinghpur
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.75 MB
TenderSchedule472905.pdf
Tender Documents • 0.75 MB
SBDturnkey.pdf
Tender Documents • 2.71 MB
DetailsOfBidder.xls
Tender Documents • 0.02 MB
BidderSBDamendment.pdf
Tender Documents • 0.24 MB
BOQ_556407.xls
BOQ • 0.25 MB
TECHNICALBID472905.xls
Additional Documents • 0.38 MB
checklist472905.pdf
Additional Documents • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .