| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 LAccepted-AOC | ₹18.3 L Quoted ₹19.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.7 L+₹79,608.75 (3.99%)Rejected-Finance | ₹20.7 L+₹79,608.75 (3.99%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | S.PRABAHARAN SRI SATHYA ENTERPRISES L1 | S P YOGARAJAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 111 | M3 | 135 ₹14,985 Lowest | 140 ₹15,540 |
| 2.00 | labour charges for transporting the surplus excavated earth, debris atc.,away from the site to a lead of 5 KM including cost of all materials lead lift etc complete as directed by the department engineer at site. | 50 | M3 | 130 ₹6,500 Lowest | 130 ₹6,500 Lowest |
| 3.00 | Labour charges for Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 61 | M3 | 40 ₹2,440 Lowest | 45 ₹2,745 |
| 4.00 | Laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 7.86 | M3 | 7,320 ₹57,535.2 Lowest | 7,350 ₹57,771 |
| 5.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 50.25 | M3 | 8,500 ₹4,27,125 Lowest | 8,800 ₹4,42,200 |
| 6.00 | Providing and laying P:C:C 1:2:4 using 20mm HBG metal including form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 7.45 | M3 | 11,800 ₹87,910 Lowest | 12,000 ₹89,400 |
| 7.00 | Providing and laying R:C:C 1:1:5:3 using 12-20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 20.02 | M3 | 14,350 ₹2,87,287 Lowest | 14,500 ₹2,90,290 |
| 8.00 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level) RCC Wall. | 9.09 | M3 | 15,000 ₹1,36,350 Lowest | 15,500 ₹1,40,895 |
| 9.00 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade (with a minimum cement content of 360 kg per cu.m) for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. Pre Cast slab | 1.3 | M3 | 9,250 ₹12,025 Lowest | 9,300 ₹12,090 |
| 10.00 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as per standard specification and as directed by the department engineer at site. | 2.14 | MT | 93,500 ₹2,00,090 Lowest | 99,000 ₹2,11,860 |
Tender Value
₹18.4 L
EMD Value
₹18,400
Closing Date
15 Apr 2025, 9:00 amClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2025_EB_537489_1
OT-03/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Thirunindravur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,400
Yes
2 Sept 2026
2 Apr 2025
16 Apr 2025
2 Apr 2025
15 Apr 2025
2 Apr 2025
Amount
Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
labour charges for transporting the surplus excavated earth, debris atc.,away from the site to a lead of 5 KM including cost of all materials lead lift etc complete as directed by the department engineer at site.
Labour charges for Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P:C:C 1:2:4 using 20mm HBG metal including form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying R:C:C 1:1:5:3 using 12-20mm HBG metal with form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. (up to basement level) RCC Wall.
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade (with a minimum cement content of 360 kg per cu.m) for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. Pre Cast slab
Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as per standard specification and as directed by the department engineer at site.
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete as directed by the dept. Engineer at site.
Labour charges for assembling of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site. (The templete will be make own arrangement by the contractor)
Plastering in CM 1:5 20 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 25 mm dia
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 25 mm dia
Engaging JCB for levelling the ups and downs of the location for making of foundation including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Painting 2 coats with approved plastic emulsion paint over one priming coat of plastic emulsion paint over cement plastered wall surface, ceilling and other new surface including cost of all materials, colur pigments labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site
supply, fabrication, cutting and fixing in position of MS Channel , Angle & chequared plate 6mm thick with lifting hooks / holes and placing over cable duct inside control room building, painting with one coat red oxide, two coats enamul paint, labour for laying, transport, T & P including cost of all materials, labour, leads, lift, cutting, grinding, painting, placing in position etc., complete as directed by the department engineer at site.
Provinding the control room floor with rectified vitrified core endura grey coated floor tiles of size 600mmX600mmX12mm. Embedded in CM 1:3, 20 mm thick & pointed with same motor mixed with crude oil at 10% by weight of cement used over a bed of brick jelly lime concret of 80mm thick with ratio of 32:12.5 cft (no sand) with required slope and beaten with wooden bearers including cost of lime, brick jelly, cement, all materials, curing, labour, lead and lift etc., and including cost of material and labour for applying water proof component over the terrace as base coating ect., complete.
Dismantling of existing PCC plinth including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling of existing RCC transfomer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
Dismantling of the existing brick work transformer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site.
supply, fabrication, cutting and fixing in position of MS Channel , Angle & chequared plate with lifting hooks / holes and placing over cable duct inside control room building, painting with one coat red oxide, two coats enamul paint, labour for laying, transport, T & P including cost of all materials, labour, leads, lift, cutting, grinding, painting, placing in position etc., complete as directed by the department engineer at site.
Supply and filling with stone dust inside the yard area including cost of all materials, labour, lead, lift, T&P, etc., complete and as directed by the department engieer at site
Supply and filling with 20mm B.G.Metal inside the yard area including cost of all materials, labour, lead, lift, T&P, etc., complete and as directed by the department engieer at site
Supplying and erection of hardware fittings as directed by the engineers at site incluidng cost of all materials, labour, cutting, bending, threading, welding and galvanising, transport, lead and lift etc., complete in all respects as per standard specifiction. Single Suspension fittings for ACSR Panther
Labour charges for transporting and paying through head load and hoisting of B units 120 KN ordinary Tension Insulators with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
Labour charges for transporting and paying out of 6 nos Panther conductor with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete. (Measurement will be made at actuals for Jumber Span)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
S P YOGARAJAN (BID ID -1291778)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .