| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC | ₹19.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.4 L+₹2.9 L (14.9%)Rejected-Finance | ₹22.4 L+₹2.9 L (14.9%) | L2 | Rejected-Finance L2 |
| 3 | L3₹23.0 L+₹3.5 L (18.0%)Rejected-Finance SIDDHARTH ENCLAVE NEAR JINDAL FACTORY RAMNAGAR ROORKEE 247667 | HARIDWAR | UTTARAKHAND | 247667 | ₹23.0 L+₹3.5 L (18.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹23.8 L+₹4.3 L (22.2%)Rejected-Finance B XI 746 STREET NO 6 BHARAT NAGAR BARNALA 148101 | BARNALA | BARNALA | PUNJAB | 148101 | ₹23.8 L+₹4.3 L (22.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹23.9 L+₹4.4 L (22.6%)Rejected-Finance A 102 GOLDEN SAND APARTMENTS GAZIPUR DHAKOLI ZIRAKPUR PB 160104 | ZIRAKPUR | S A S NAGAR | PUNJAB | 160104 | ₹23.9 L+₹4.4 L (22.6%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S RAJ KUMAR GUPTA L4 | M/s VISHAL ELECTRIC STORE L2 | AP BUILDERS L5 | ANANT ENTERPRISES L3 | Rasvinderpalandco L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for charging SF-6 breaker with SF-6 gas topping up with required level / pressure complete all as specified and directed by Engineer-in- Charge. | 5 | Kg | 2,550 ₹12,750 | 2,400 ₹12,000 | 2,450 ₹12,250 | 2,500 ₹12,500 | 2,150 ₹10,750 Lowest |
| 2.00 | Material and labour for perodical inspection of 66/11 KV MRS testing of power transformer and Testing & caliberation of relays of C&R panel and 11 KV incomer by Senior Executive Engineer of PSPCL Division Bathinda complete all as specified and directed by Engineer-in- Charge.
Note :-1. The caliberation of the relay shall be carried out in the presence of Engineer-in-Charge.
2. The required amount for execution of this item is required to be deposited by the contractor at the office of SE of PSPCL Bathinda. The receipt of the amount deposit should be submitted by the contractor at the office of GE(AF) Bhisiana for claming RAR payment
3. Rewinding of the unserviceable transformer shall be carried out at workshop within week time after getting direction from GE excluding transit period otherwise penalty shall be imposed for Rs.2000 per day. | 2 | Each Job | 1,57,000 ₹3,14,000 | 1,55,000 ₹3,10,000 | 1,45,000 ₹2,90,000 | 1,47,000 ₹2,94,000 | 1,32,000 ₹2,64,000 Lowest |
| 3.00 | Material and labour for testing of oil including collection of final sample of transformer oil for testing of power Transformer (before and after dehydration ) in borosil container of capacity of 5 Ltrs and sending the transformer oil sample to PSPCL oil testing lab patiala by the contractor. Due care for following tests and submission test report of OLTC & main body complete all as specified and directed by Engr-in-Charge :-
(i) Tan Delta Test
(ii) Specific Resistance Test
(iii) Brake Down Voltage Test
(iv) Water Content Test
(v) Total acidity
(vi) Interfacial tension
(vii) Flash point
(viii) Sediment or sludge
(ix) Dissolved Gas analysis
Note:- 1. The required amount for execution of this item is required to be deposited by the contractor at the office of SE of PSPCL. The receipt of the amount deposit should be submitted by the contractor at the office of GE(AF) Bhisiana for claming RAR payment. | 2 | Each Sample | 46,500 ₹93,000 | 47,000 ₹94,000 | 60,000 ₹1,20,000 | 55,000 ₹1,10,000 | 41,800 ₹83,600 Lowest |
| 4.00 | Material and labour for Prepration of old aluminium painted surface of all steel structures of 66 KV line inside the grid , CTs, PTs, isolators (03 Nos ) and lightening arrestores complete including scratching down the old painted surface by emery papper or thinner and finishing the surface smooth and applying two coats of aluminium paint complete all as specified and directed by Engineer-in- Charge. | 1 | Each Job | 24,000 ₹24,000 Lowest | 25,000 ₹25,000 | 25,500 ₹25,500 | 25,000 ₹25,000 | 31,000 ₹31,000 |
| 5.00 | Material and labour for attending breakdown /inspection of HT 11KV VCB by authorised service engineer to check and replace any minor spare parts related breakdown complete all as specified and directed by Engineer-in- Charge.
Note:-
(i) Maintenance/repair shall be carried out by authorised service engineer.
(ii) All Measuring equipments and T&P required shall be arranged by the contractor without any additional payment.
(iii) Any other activity/ minor items not listed/covered here above and required during /completing the work for smooth functiong of system will have to be arranged by Contractor himself and for this purpose no extra cost will be paid.
(iv) Major Spare parts shall be paid separately under relevant item of BOQ as supply only. However fixing charges shall deemed to be included in this item
(v) A sum of Rs. 5000/- will be recovered from the contractor for non rectification of breakdown/fault or replacement of any unserviceable spares after 12 hours from lodging of complaint telephonically or verbaly.
(vi) Thereafter Rs. 1000/- will be added every day till rectification of fault or replacement of unserviceable spares as directed by the Engr-in-Charge. | 3 | Each Job | 11,000 ₹33,000 | 10,000 ₹30,000 Lowest | 16,500 ₹49,500 | 17,000 ₹51,000 | 12,000 ₹36,000 |
| 6.00 | Material and labour for Minor servicing, calibration and testing of 11KV HT relay provided with VCBs HT panel of any make and type such as instantaneous earth fault, auxiliary relay, earth fault, under voltage, over current relay and adjustment the time for proper tripping with respect of MES/State Electricity Board incoming tripping with the relay testing equipment by the authorized service engineer and shall submit necessary certificate for the same complete all as specified and directed by Engineer-in- Charge. | 4 | Each Job | 8,000 ₹32,000 | 7,500 ₹30,000 | 6,000 ₹24,000 | 5,000 ₹20,000 Lowest | 7,500 ₹30,000 |
| 7.00 | Comprehensive preventive maintenance of PLC based AMF control panel including any relay/PLC setting , servicing and replacement of minor spare parts, Checking complete wiring , replacing damaged or burnt thimbles ensuring tightness of each connection, cleaning from inside and surface replacing gaskets etc including testing in presence of Engineer-in-Charge for each sequence of operation on every mode of operation after obtaining proper shutdown complete all as specified and directed by Engineer-in- Charge. | 1 | Each Job | 37,000 ₹37,000 | 35,000 ₹35,000 | 32,500 ₹32,500 | 32,000 ₹32,000 Lowest | 34,800 ₹34,800 |
| 8.00 | Material and labour for attending faults in PLC based AMF control panel and re-starting the same with testing of operation to be done in presence of Engineer-in-Charge.
Note:-1. Report of each fault, rectification and testing status shall be recorded in a register maintained by the contractor with signature of Engineer-in-charge. RAR payment shall be made only after submission of report to Engr-in-Charge. | 2 | Each Job | 7,000 ₹14,000 | 6,500 ₹13,000 | 5,500 ₹11,000 | 5,000 ₹10,000 Lowest | 7,000 ₹14,000 |
| 9.00 | Supply only in replacement of digital type AC Ammeter 3 phase, CT ratio 150/5, HT meter flush mounted type with suitable selector switch of size 96 mm x 96 mm, accuracy class 1.0, C T type complete all as specified & directed by Engineer-in-Charge | 1 | Each | 1,900 ₹1,900 | 1,750 ₹1,750 | 1,550 ₹1,550 | 1,500 ₹1,500 Lowest | 1,850 ₹1,850 |
| 10.00 | Supply only in replacement of digital type AC Voltmeter, flush mounted type 3 phase, HT meter, 50Hz, Voltage range 0- 12 KV Volt of size 96mmx96mm accuracy class 1.0 with suitable selector switch complete all as specified & directed by Engineer-in-Charge | 1 | Each | 1,800 ₹1,800 | 1,750 ₹1,750 | 1,600 ₹1,600 | 1,500 ₹1,500 Lowest | 1,850 ₹1,850 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
11 Aug 2026, 6:00 pmClosed
CWE (AF) BHISIANA
HQ CWE (AF) BHISIANA
REPAIR/ REPLACEMENT/ MAINTENANCE OF VCB, SF6/ SERVO STABLIZED/ ISOLATION, DISTRIBUTION, POWER TRANSFORMER ALONGWITH CONNECTED ITEMS AT AF STATION BHISIANA UNDER GE (AF) BHISIANA
2026_MES_780443_1
CWE(BHI)/BHI-51/2026-27
Open Tender
Civil Works
Works
180 days
Bhisiana
As per tender documents
8 documents required · 8 mandatory
₹500
GE (AF) BHISIANA
₹40,000
Yes
3 Sept 2026
23 Jul 2026
13 Aug 2026
23 Jul 2026
11 Aug 2026
6 Aug 2026
23 Jul 2026 - 30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for charging SF-6 breaker with SF-6 gas topping up with required level / pressure complete all as specified and directed by Engineer-in- Charge. | 5 | Kg | - | - |
| 2 | Material and labour for perodical inspection of 66/11 KV MRS testing of power transformer and Testing & caliberation of relays of C&R panel and 11 KV incomer by Senior Executive Engineer of PSPCL Division Bathinda complete all as specified and directed by Engineer-in- Charge.
Note :-1. The caliberation of the relay shall be carried out in the presence of Engineer-in-Charge.
2. The required amount for execution of this item is required to be deposited by the contractor at the office of SE of PSPCL Bathinda. The receipt of the amount deposit should be submitted by the contractor at the office of GE(AF) Bhisiana for claming RAR payment
3. Rewinding of the unserviceable transformer shall be carried out at workshop within week time after getting direction from GE excluding transit period otherwise penalty shall be imposed for Rs.2000 per day. | 2 | Each Job | - | - |
| 3 | Material and labour for testing of oil including collection of final sample of transformer oil for testing of power Transformer (before and after dehydration ) in borosil container of capacity of 5 Ltrs and sending the transformer oil sample to PSPCL oil testing lab patiala by the contractor. Due care for following tests and submission test report of OLTC & main body complete all as specified and directed by Engr-in-Charge :-
(i) Tan Delta Test
(ii) Specific Resistance Test
(iii) Brake Down Voltage Test
(iv) Water Content Test
(v) Total acidity
(vi) Interfacial tension
(vii) Flash point
(viii) Sediment or sludge
(ix) Dissolved Gas analysis
Note:- 1. The required amount for execution of this item is required to be deposited by the contractor at the office of SE of PSPCL. The receipt of the amount deposit should be submitted by the contractor at the office of GE(AF) Bhisiana for claming RAR payment. | 2 | Each Sample | - | - |
| 4 | Material and labour for Prepration of old aluminium painted surface of all steel structures of 66 KV line inside the grid , CTs, PTs, isolators (03 Nos ) and lightening arrestores complete including scratching down the old painted surface by emery papper or thinner and finishing the surface smooth and applying two coats of aluminium paint complete all as specified and directed by Engineer-in- Charge. | 1 | Each Job | - | - |
| 5 | Material and labour for attending breakdown /inspection of HT 11KV VCB by authorised service engineer to check and replace any minor spare parts related breakdown complete all as specified and directed by Engineer-in- Charge.
Note:-
(i) Maintenance/repair shall be carried out by authorised service engineer.
(ii) All Measuring equipments and T&P required shall be arranged by the contractor without any additional payment.
(iii) Any other activity/ minor items not listed/covered here above and required during /completing the work for smooth functiong of system will have to be arranged by Contractor himself and for this purpose no extra cost will be paid.
(iv) Major Spare parts shall be paid separately under relevant item of BOQ as supply only. However fixing charges shall deemed to be included in this item
(v) A sum of Rs. 5000/- will be recovered from the contractor for non rectification of breakdown/fault or replacement of any unserviceable spares after 12 hours from lodging of complaint telephonically or verbaly.
(vi) Thereafter Rs. 1000/- will be added every day till rectification of fault or replacement of unserviceable spares as directed by the Engr-in-Charge. | 3 | Each Job | - | - |
| 6 | Material and labour for Minor servicing, calibration and testing of 11KV HT relay provided with VCBs HT panel of any make and type such as instantaneous earth fault, auxiliary relay, earth fault, under voltage, over current relay and adjustment the time for proper tripping with respect of MES/State Electricity Board incoming tripping with the relay testing equipment by the authorized service engineer and shall submit necessary certificate for the same complete all as specified and directed by Engineer-in- Charge. | 4 | Each Job | - | - |
| 7 | Comprehensive preventive maintenance of PLC based AMF control panel including any relay/PLC setting , servicing and replacement of minor spare parts, Checking complete wiring , replacing damaged or burnt thimbles ensuring tightness of each connection, cleaning from inside and surface replacing gaskets etc including testing in presence of Engineer-in-Charge for each sequence of operation on every mode of operation after obtaining proper shutdown complete all as specified and directed by Engineer-in- Charge. | 1 | Each Job | - | - |
| 8 | Material and labour for attending faults in PLC based AMF control panel and re-starting the same with testing of operation to be done in presence of Engineer-in-Charge.
Note:-1. Report of each fault, rectification and testing status shall be recorded in a register maintained by the contractor with signature of Engineer-in-charge. RAR payment shall be made only after submission of report to Engr-in-Charge. | 2 | Each Job | - | - |
| 9 | Supply only in replacement of digital type AC Ammeter 3 phase, CT ratio 150/5, HT meter flush mounted type with suitable selector switch of size 96 mm x 96 mm, accuracy class 1.0, C T type complete all as specified & directed by Engineer-in-Charge | 1 | Each | - | - |
| 10 | Supply only in replacement of digital type AC Voltmeter, flush mounted type 3 phase, HT meter, 50Hz, Voltage range 0- 12 KV Volt of size 96mmx96mm accuracy class 1.0 with suitable selector switch complete all as specified & directed by Engineer-in-Charge | 1 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_874209.xls
BOQ • 5.04 MB
TENDER51PRINT.pdf
Tender Documents • 3.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .