| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SREEKRISHNA POWER ENGINEERING AND CONSULTANCY PVT LTD L1 |
|---|---|---|---|---|
| 1.00Line works | ||||
| 1.10 | Supply of OPGW 48 fibre cable as per technical specification including cost of all required suitable tension/suspension clamp, vibration damper,joint/junction boxes suitable for OPGW and all necessary accessories, transport charges, loading unloading, lead lift etc complete. | 41 | KM | 3,00,682 ₹1,23,27,962 Lowest |
| 2.00 | Installation and Stringing of OPGW 48 fibre cableas including fixing of all hardware fittings and accessories etc complete as per standard specification and as ditected by the engineer incharge for the line (Stringing of OPGW is to be done using tension stringing equipment) . | 41 | KM | 1,02,951 ₹42,20,991 Lowest |
| 3.00 | SGST & CGST (If applicable quote the value, if not enter '0') | 1 | Percentage | 9 ₹14,89,405.77 Lowest |
| 4.00 | IGST (If applicable quote the value, if not enter '0') | 1 | Percentage | 9 ₹14,89,405.77 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
5 Sept 2022, 2:00 pmClosed
The Chief Engineer,
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Supply,stringing,testing and commissioning of 48fibre OPGW (1) to make LILO of the existing 230KV Abishekapatti - Udayathur feeder toNanguneri 230 KV SS (2) Samugarengapuram 400KV SS to the Nanguneri 230 KV SS
2022_EB_245944_1
CE/TP-II/TRY/C-18/22-23
Open Tender
Civil Works
Works
90 days
Nanguneri
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹1.2 L
Yes
17 Dec 2022
6 Aug 2022
6 Sept 2022
6 Aug 2022
5 Sept 2022
6 Aug 2022
Amount
Line works
Supply of OPGW 48 fibre cable as per technical specification including cost of all required suitable tension/suspension clamp, vibration damper,joint/junction boxes suitable for OPGW and all necessary accessories, transport charges, loading unloading, lead lift etc complete.
Installation and Stringing of OPGW 48 fibre cableas including fixing of all hardware fittings and accessories etc complete as per standard specification and as ditected by the engineer incharge for the line (Stringing of OPGW is to be done using tension stringing equipment) .
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_290984.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .