Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 CrAccepted-Finance DADRA AND NAGAR HAVELI DN | ₹5.5 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹5.9 Cr+₹37.7 L (6.87%)Accepted-Finance DADRA AND NAGAR HAVELI DN | ₹5.9 Cr+₹37.7 L (6.87%) | L2 | Accepted-Finance ok |
Tender Value
₹6.0 Cr
EMD Value
₹12.0 L
Closing Date
6 Jan 2025, 2:00 pmClosed
Executive Engineer PWD.II Road DNH.
Executive Engineer PWD.II Road DNH.
Providing and Laying Precast RCC drain from Athal bridge to Athal T junction Silvassa.
2024_UTDNH_7398_1
E-Tender Notice No. 20 of 2024-25
Open Tender
Civil Works
Item Rate
75 days
Executive Engineer PWD.II Road DNH.
Documents as per NIT
3 documents required · 3 mandatory
₹3,000
Executive Engineer PWD.II Road DNH.
₹12.0 L
Executive Engineer PWD.II Road DNH.
23 Apr 2025
21 Dec 2024
6 Jan 2025
21 Dec 2024
6 Jan 2025
21 Dec 2024
26 Dec 2024
Amount
Excavation in Soil for foundation of Drain- Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring, strutting dewatering as necessary and disposing of the excavated stuff as directed.(A) Depth upto 3.0 M. and lead upto 100m for 10 cum
Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 With Batching Plant, Transit Mixer and Concrete Pump including all
Providing & Laying factory made precast U shape surface storm water drain with Lid DUSD 1200 (T-25) having size of into in dimension from top 1200 mm X 1200 mm long and 120 mm thick having T-25 load bearing capacity- 10T axle load- 5T wheel load confirming to JIS and meeting IS requirements having high performance self-compacting concrete of M 40 cylinder strength/M-50 cube strength and Fe500 D shall be used for reinforcement. The product shall have tie shape groove 10-20 mm width, 25 mm depth as per JIS on both sides of each for jointing two precast units using cement mortar or suitable non shrink grout. The Product should have Flange Coupling jointing arrangements, one each at bottom and both the side walls, at appropriate location for connection between two products. The precast SWD must consist special in built inlets at appropriate location for safer and faster installation. The hole for lifting arrangement must be filled with cement mortar after installation. including supply ,transportation on specific location at site in line ,level , gradient and plumb with necessary testing commissioning etc complete as per instruction of engineer in charge. In no case the casting shall be allowed to be prepared at site. It should be casted in the stringent atmospheric & pre-defined condition, as per approved QAP as by Engineer incharge including Loading-Unloading and laying including all at site of work as directed by Engineer-in-charge. (Make : FUJI Silvertech or equivalent as approved by Engineer-in-charge.)
Filling available excavated earth (Excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming and watering, including all.
Chetan Construction Co (BID ID -20842)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .