| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.8 L+₹7,894 (1.17%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev.) / Project Director
DRDA, Salem
Salem District - Konganapuram Block - Creating Infrastructure facilities to the burial ground which are Proposed as samathuva Burial Ground in 02 No of Work of - AGAMT - II - 2021-22 Package No.122 /2022-23.
2022_RDTN_239537_182
Roc.No.5182/2021/A16
Open Tender
Civil Works - Others
Item Wise
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹7,000
DRDA, Salem
23 Feb 2023
16 Jul 2022
22 Jul 2022
16 Jul 2022
22 Jul 2022
16 Jul 2022
18 Jul 2022
90 days
Amount
1.Construction of Waiting Shed at Chinnappampatti Common Burial Ground H/o Vellalapuram
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay Foundation per SS 20 A.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete -10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
below ground level
above ground level
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
2.Construction of GLR With Pipeline at Chinnappampatti Samaththuva Mayanam H/o Vellalapuram
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay Foundation per SS 20 A.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"and conveyance of all materials to site and all labour charges etc complete -10 cum
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Distempering two coats with approved distemper over one coat of priming coat of cement paint cement plastered wall surface , celling and other new surface including cleaning,preparing the surface , curing scaffolding charges etc.. Complete
Earth work excavation and deposting on bank with an initial lead of 10m & lift of 2m for pipe laying works with standard trench width and depth etc., complete (other than loose soil)
Supply & delivey of PVC/GI pipes as per BIS standards 63mm OD 4 KSC PVC Pipe
Labour charges for laying and jointing of PVC/GI pipes as per BIS standards 63mm OD 6 KSC PVC Pipe
Refilling the excavated earth as per the standard specifications (PVC Pipe 63 mm OD)
Towards the cost of GI / PVC specials, solvent cement and inter connection works and Labour Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M Rajasekar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .