| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.8 LAdmitted-Finance | -12.99% | ₹34.8 L | L1 | Admitted-Finance |
| 2 | L2₹35.3 L+₹48,160.39 (1.38%)Admitted-Finance | -11.79% | ₹35.3 L+₹48,160.39 (1.38%) | L2 | Admitted-Finance |
| 3 | L3₹37.7 L+₹2.9 L (8.28%)Admitted-Finance | -5.79% | ₹37.7 L+₹2.9 L (8.28%) | L3 | Admitted-Finance |
| 4 | L4₹38.0 L+₹3.2 L (9.06%)Admitted-Finance | -5.11% | ₹38.0 L+₹3.2 L (9.06%) | L4 | Admitted-Finance |
| 5 | L5₹39.6 L+₹4.8 L (13.8%)Admitted-Finance | -1.00% | ₹39.6 L+₹4.8 L (13.8%) | L5 | Admitted-Finance |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
28 Jul 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIV SURANKOTE
Please Refer to BOQ.
2026_PWDJK_315087_1
e-NIT No.43 of 2026-27 Dated 08-07-2026
Open Tender
Civil Works
Percentage
30 days
SURANKOTE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹80,000
20 Aug 2026
8 Jul 2026
29 Jul 2026
8 Jul 2026
28 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 204.5 | Cum | 256.85 | ₹52,525.83 |
| 2 | Providing and laying non-pressure of specified class R.C.C. pipes
including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-4 class (Heavy duty) R.C.C. pipes 900 mm dia. R.C.C. pipe | 22.5 | Rmt | 6,081.65 | ₹1,36,837.13 |
| 3 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 1,800 | Sqm | 153 | ₹2,75,400 |
| 4 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | 270 | Cum | 1,883.3 | ₹5,08,491 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 135 | Cum | 1,885.95 | ₹2,54,603.25 |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade – VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm | 3,150 | Sqm | 74.35 | ₹2,34,202.5 |
| 7 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 157.5 | Cum | 8,596.8 | ₹13,53,996 |
| 8 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-10 heated and then mixed withsolvent at the rate of 70 grams per kg of asphalt | 3,150 | Sqm | 269.85 | ₹8,50,027.5 |
| 9 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. | 3,150 | Sqm | 101.4 | ₹3,19,410 |
| 10 | Carraig of Materials by Mechanical transport including loading unloading and Stacking Complete Job. Carriage of Non-pressure NP-4 class (Heavy duty) R.C.C. pipes 900 mm dia. R.C.C. pipe by an average distance of average lead 90 Km by M.T. | 22.5 | Rmt | 646.18 | ₹14,539.05 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_1021043.xls
BOQ • 0.24 MB
EXTENSIONOFDATE.pdf
PDF • 0.71 MB
CORRIGENDUM.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .