Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC 129 STREET NO 3 3 GREEN AVENUE BIBI WALA ROAD BATHINDA 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹19.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.9 L+₹3.7 L (19.2%)Rejected-Finance | ₹22.9 L+₹3.7 L (19.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹24.0 L+₹4.8 L (24.8%)Rejected-Finance | ₹24.0 L+₹4.8 L (24.8%) | L3 | Rejected-Finance L3 |
| 4 | L4₹27.2 L+₹8.0 L (41.8%)Rejected-Finance | ₹27.2 L+₹8.0 L (41.8%) | L4 | Rejected-Finance L4 |
| 5 | L5₹27.6 L+₹8.4 L (43.8%)Rejected-Finance | ₹27.6 L+₹8.4 L (43.8%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Guddu Builders L5 | SUDESH ENTREPRISES L4 | Paper Powers L3 | KULWANT RAI L1 | MS FUTEC ENGINEERS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and as directedv by Engineer-in-charge. | 10,000 | Sqm | 20 ₹2,00,000 | 30 ₹3,00,000 | 25 ₹2,50,000 | 17 ₹1,70,000 Lowest | 20 ₹2,00,000 |
| 2.00 | Material and labour for preparation of new plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Note : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 800 | Sqm | 145 ₹1,16,000 | 120 ₹96,000 | 90 ₹72,000 | 70 ₹56,000 Lowest | 100 ₹80,000 |
| 3.00 | Material and labour for preparation of old plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 10,000 | Sqm | 135 ₹13,50,000 | 100 ₹10,00,000 | 94 ₹9,40,000 | 60 ₹6,00,000 Lowest | 95 ₹9,50,000 |
| 4.00 | Material and labour for preparation of old plastered surfaces and applying one coats of cement base paint complete all as specified and as directed by Engineer-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 19,000 | Sqm | 15 ₹2,85,000 Lowest | 20 ₹3,80,000 | 20 ₹3,80,000 | 17 ₹3,23,000 | 17 ₹3,23,000 |
| 5.00 | Material and labour preparation of plastered surface and applying one coat of wall care putty to achieve the surface even and smooth for painting complete all as specified and as directed by Engineer-in-charge. | 4,000 | Sqm | 28 ₹1,12,000 | 15 ₹60,000 Lowest | 30 ₹1,20,000 | 17 ₹68,000 | 15 ₹60,000 Lowest |
| 6.00 | Material and labour for preparation of New/ old plastered surfaces of finished walls and applying two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and as directed by Engineer-n-charge.
Notes:- (i) Primer and emulsion Shall be carried out through air less spray machine ( Mechanical means) (ii) The work shall be execute from 8 to 9 meter height. (iii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iv) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(v) The pattern and colour shall be as decided by Engineer -in- charge. | 600 | Sqm | 128 ₹76,800 | 80 ₹48,000 | 130 ₹78,000 | 70 ₹42,000 Lowest | 100 ₹60,000 |
| 7.00 | Material and labour for preparation of new plastered surfaces of walls and applying two or more coats of distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete as per manufacturer's specification. Notes- (i) Distempering with 1st quality acrylic distemper shall be carried out through air less spray machine (Mechanical means) (ii) The work shall be execute from 8 to 9 meter height. (iii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iv) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(v) The pattern and colour shall be as decided by Engineer -in- charge. | 900 | Sqm | 68 ₹61,200 | 50 ₹45,000 | 100 ₹90,000 | 40 ₹36,000 Lowest | 100 ₹90,000 |
| 7.01Notes for Ser item No 1 to 7: The work for periodical services shall include the following and the rates quoted by the bidders shall include the same:- (a) All external surface finishing &painting work shall be done as per MoU between tenderer and manfacturer of paints and their authorised applicator (b) Contractor shall upload MoU between tenderer and Manufacturer of paints and their authorised applicator before quoting the bids or else the contractor will be disqualified in the technical bid. (c) Authorised applicator of the company with trained painters will only be allowed to excute the work and the applicator will submit the experience certificate from the company. (d) The entire qty of material will be calculated and brought in maximum 3 phases and will be accepted only on post verification of Pvs and challan from the company through mail. (e) Material will be kept in the custody of MES rep and will be issued to the authorised applicator as per reqiurement. (f) Packing of material/empty Buckets will not be handed over to the contractor and will be destroyed after completion of work through BOQ. (g) Building will be handed over to the contractors in a phased manner and subsequently to be authorised applicator only after completion of civil works the plastering / repairs etc. (h) Entire work will be divided into three stages as under and will be certified by a company technical rep wheather the stages completed are as per manufacture's instruction and passed by Engineer-in- Charge/AGE(I). (i) Stage passing register will be properly maintained (j) Preparation of plastered or unplastered surfaces or removal of existing treatement by scrapping of walls, chajjas ,cilings ,fins facias etc shall be done using mechnical sander with internal dust extraction system for clean environment. | ||||||||
| 7.02(k) All priming /painting work will be done by mechnical sprayer only. (l) The rates quoted will be inclusive of all scaffolding as and when required. (m) The contractors shall submit manufacturer genereated 05 years warranty card for each building during submission of RAR and finial bill . (n) Any defect noticed during the warranty period will be rectified by the contactor/manufacturer without any financial effect . (o) A Gurranty amount @10% will be kept as rserve till completion of warrantly period and will be released thereafter. (p) The work shall be executed in bldg No P-75,76,P-79,P-83,P-84 | ||||||||
| 8.00 | Demolition of brick work built in cement mortar including all quoins, arches, pillars etc excluding ashlar facings, dressed stone work and precast concrete articles complete all as specified and directed and as directed by Engineer-in-charge. | 12 | Cum | 200 ₹2,400 | 500 ₹6,000 | 100 ₹1,200 Lowest | 200 ₹2,400 | 400 ₹4,800 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
27 Jul 2026, 6:00 pmClosed
CWE Patiala
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact - 01712200082
SMART PERIODICALS TO CERTAIN BLDG, OTM AND MD ACCN AT DAPPAR UNDER AGE (I) DAPPAR
2026_MES_775182_1
CWE/PAT/T-26/2026-27
Open Tender
Civil Works
Item Rate
180 days
AGE (I) Dappar
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
AGE (I) Dappar
₹60,000
Yes
18 Sept 2026
29 Jun 2026
29 Jul 2026
29 Jun 2026
27 Jul 2026
13 Jul 2026
29 Jun 2026 - 9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and as directedv by Engineer-in-charge. | 10,000 | Sqm | 1.25 | ₹12,500 |
| 2 | Material and labour for preparation of new plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Note : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 800 | Sqm | 11 | ₹8,800 |
| 3 | Material and labour for preparation of old plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 10,000 | Sqm | 100 | ₹10,00,000 |
| 4 | Material and labour for preparation of old plastered surfaces and applying one coats of cement base paint complete all as specified and as directed by Engineer-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 19,000 | Sqm | 53 | ₹10,07,000 |
| 5 | Material and labour preparation of plastered surface and applying one coat of wall care putty to achieve the surface even and smooth for painting complete all as specified and as directed by Engineer-in-charge. | 4,000 | Sqm | 10 | ₹40,000 |
| 6 | Material and labour for preparation of New/ old plastered surfaces of finished walls and applying two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and as directed by Engineer-n-charge.
Notes:- (i) Primer and emulsion Shall be carried out through air less spray machine ( Mechanical means) (ii) The work shall be execute from 8 to 9 meter height. (iii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iv) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(v) The pattern and colour shall be as decided by Engineer -in- charge. | 600 | Sqm | 10 | ₹6,000 |
| 7 | Material and labour for preparation of new plastered surfaces of walls and applying two or more coats of distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete as per manufacturer's specification. Notes- (i) Distempering with 1st quality acrylic distemper shall be carried out through air less spray machine (Mechanical means) (ii) The work shall be execute from 8 to 9 meter height. (iii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iv) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(v) The pattern and colour shall be as decided by Engineer -in- charge. | 900 | Sqm | 22 | ₹19,800 |
| 7.02 | (k) All priming /painting work will be done by mechnical sprayer only. (l) The rates quoted will be inclusive of all scaffolding as and when required. (m) The contractors shall submit manufacturer genereated 05 years warranty card for each building during submission of RAR and finial bill . (n) Any defect noticed during the warranty period will be rectified by the contactor/manufacturer without any financial effect . (o) A Gurranty amount @10% will be kept as rserve till completion of warrantly period and will be released thereafter. (p) The work shall be executed in bldg No P-75,76,P-79,P-83,P-84 | - | - | - | - |
| 8 | Demolition of brick work built in cement mortar including all quoins, arches, pillars etc excluding ashlar facings, dressed stone work and precast concrete articles complete all as specified and directed and as directed by Engineer-in-charge. | 12 | Cum | 10 | ₹120 |
| 9 | Material and labour for brick work with sub class 'B' bricks, old size, straight or curved on plan exceeding 6 m mean radius and built in cement mortar 1:6 complete all as specified and directed by Engineer-in-charge. | 12 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TENDERT26.pdf
Tender Documents • 0.68 MB
BOQ_868045.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .