Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
20 Jul 2026, 6:00 pm
CWE Patiala
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact - 01712200082
SMART PERIODICALS TO CERTAIN BLDG, OTM AND MD ACCN AT DAPPAR UNDER AGE (I) DAPPAR
2026_MES_775182_1
CWE/PAT/T-26/2026-27
Open Tender
Civil Works
180 days
AGE (I) Dappar
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
AGE (I) Dappar
₹60,000
Yes
29 Jun 2026
29 Jun 2026
22 Jul 2026
29 Jun 2026
20 Jul 2026
13 Jul 2026
29 Jun 2026 - 9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean,free from dust, loose paint etc by skilled labour complete all as specified and as directedv by Engineer-in-charge. | 10,000 | Sqm | 1.25 | ₹12,500 |
| 2 | Material and labour for preparation of new plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Note : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 800 | Sqm | 11 | ₹8,800 |
| 3 | Material and labour for preparation of old plastered surfaces and applying one or more coat of wall care putty on plastered surface to achieve smooth surface and applying two coat of acrylic Smooth exterior paint of required shade applied @ 1.67 ltr/10 sqm over and including a priming coat of exterior primer applied @ 2.20 kg/10 sqm) as per manufacturer instruction complete all as specified and directed by Engr-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 10,000 | Sqm | 100 | ₹10,00,000 |
| 4 | Material and labour for preparation of old plastered surfaces and applying one coats of cement base paint complete all as specified and as directed by Engineer-in-charge. Notes : (i) The work shall be execute from 8 to 9 meter height. (ii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iii) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(iv) The pattern and colour shall be as decided by Engineer -in- charge. | 19,000 | Sqm | 53 | ₹10,07,000 |
| 5 | Material and labour preparation of plastered surface and applying one coat of wall care putty to achieve the surface even and smooth for painting complete all as specified and as directed by Engineer-in-charge. | 4,000 | Sqm | 10 | ₹40,000 |
| 6 | Material and labour for preparation of New/ old plastered surfaces of finished walls and applying two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete all as specified and as directed by Engineer-n-charge.
Notes:- (i) Primer and emulsion Shall be carried out through air less spray machine ( Mechanical means) (ii) The work shall be execute from 8 to 9 meter height. (iii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iv) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(v) The pattern and colour shall be as decided by Engineer -in- charge. | 600 | Sqm | 10 | ₹6,000 |
| 7 | Material and labour for preparation of new plastered surfaces of walls and applying two or more coats of distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete as per manufacturer's specification. Notes- (i) Distempering with 1st quality acrylic distemper shall be carried out through air less spray machine (Mechanical means) (ii) The work shall be execute from 8 to 9 meter height. (iii) contactor has to make all arranagenent to execute the work at 8-9 m height.(iv) The quoted rate shall be inclusive to make arrangement and execute the work from 8-9 m height. Nothing extra shall be addmissible on this account.(v) The pattern and colour shall be as decided by Engineer -in- charge. | 900 | Sqm | 22 | ₹19,800 |
| 7.02 | (k) All priming /painting work will be done by mechnical sprayer only. (l) The rates quoted will be inclusive of all scaffolding as and when required. (m) The contractors shall submit manufacturer genereated 05 years warranty card for each building during submission of RAR and finial bill . (n) Any defect noticed during the warranty period will be rectified by the contactor/manufacturer without any financial effect . (o) A Gurranty amount @10% will be kept as rserve till completion of warrantly period and will be released thereafter. (p) The work shall be executed in bldg No P-75,76,P-79,P-83,P-84 | - | - | - | - |
| 8 | Demolition of brick work built in cement mortar including all quoins, arches, pillars etc excluding ashlar facings, dressed stone work and precast concrete articles complete all as specified and directed and as directed by Engineer-in-charge. | 12 | Cum | 10 | ₹120 |
| 9 | Material and labour for brick work with sub class 'B' bricks, old size, straight or curved on plan exceeding 6 m mean radius and built in cement mortar 1:6 complete all as specified and directed by Engineer-in-charge. | 12 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TENDERT26.pdf
Tender Documents • 0.68 MB
BOQ_868045.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid