Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC A |
| 2 | L2₹4.0 L+₹6,752.54 (1.70%)Rejected-AOC | ₹4.0 L+₹6,752.54 (1.70%) | L2 | Rejected-AOC A |
| 3 | Rejected-Technical VILLAGE DHABKI GUJJAR DISTT SAHARANPUR UTTAR PRADESH | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Rejected-Technical R |
| 4 | Rejected-Technical | - | - | Rejected-Technical R |
| Sl No | Description | Qty | Unit | M/S SURENDRA KUMAR KAUSHIK L2 | Adesh Kumar L1 |
|---|---|---|---|---|---|
| 1.00 | Silt clearance/trench digging including lift upto 1.5 M and lead upto 6 M , including cost of driver/assistant driver , pol , maintenance of machine , contractor profit , taxes etc but excluding leveling , dressing & compaction . By hydraulic excavator/JCB/equivalent capacity 25cum/hour ie . 1000/25 (Rs. 1000 per hour) | 860.68 | m3 | 32 ₹27,541.76 Lowest | 36 ₹30,984.48 |
| 2.00 | Earth work in Slush And Lahel clearance including with initial Lead Up to 1.0 KM & Lift uo 1.50 m ,etc compleate. | 3,398.42 | m3 | 111 ₹3,77,224.62 | 108 ₹3,67,029.36 Lowest |
Tender Value
Refer Docs
EMD Value
₹51,000
Closing Date
2 Jun 2026, 2:00 pmClosed
EE LOWER DIVISION YAMUNA CANAL SHAMLI
EE LOWER DIVISION YAMUNA CANAL OFFICE SHAMLI.
Internal cleaning work of Khandravali drain from Km 0.000 to Km 5.028
2026_UPIDC_1153055_8
C-17/03/EE/2026-27 DT 13.05.2026
Open Tender
Civil Works - Canal
Item Rate
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹51,000
20 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
2 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance/trench digging including lift upto 1.5 M and lead upto 6 M , including cost of driver/assistant driver , pol , maintenance of machine , contractor profit , taxes etc but excluding leveling , dressing & compaction . By hydraulic excavator/JCB/equivalent capacity 25cum/hour ie . 1000/25 (Rs. 1000 per hour) | 860.68 | m3 | - | - |
| 2 | Earth work in Slush And Lahel clearance including with initial Lead Up to 1.0 KM & Lift uo 1.50 m ,etc compleate. | 3,398.42 | m3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_2160098.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .