Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.4 LAccepted-AOC H NO 417 LALURAM COLONY T P NAGAR KORBA DIST KORBA CG 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | L-1 | Accepted-AOC Accepted as the bidder L-1 status | |
| 2 | Rejected-Technical HARDI BAZAR DIST KORBA CG 495446 | HARDI BAZAR | KORBA | CHHATTISGARH | 495446 | - | Rejected-Technical Rejected as the bidder attains L-6 status | |
| 3 | Rejected-Technical JYOTI NAGAR SAHID BHAGAT SINGH DIPKA DISTT KORBA 495452 C G | DIPKA | KORBA | CHHATTISGARH | 495452 | - | Rejected-Technical Rejected as the bidder attains L-3 status | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected as the bidder attains L-5 status | |
| 5 | Rejected-Technical BARDHAMAN BARDHAMAN WEST BENGAL INDIA 713378 | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | - | Rejected-Technical Rejected as the bidder attains L-4 status |
Tender Value
₹12.3 L
EMD Value
₹15,500
Closing Date
18 Aug 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff officer (EnM)
Office of the General Manager, Dipka Area, Ph. No. 9424141353/9424141302
Assistance in day to day running maintenance/repairing of pipelines and valves of different coal stocks at Dipka Expansion Project for a period of 180 days.
2022_SECL_252397_1
SECL/GM/DA/SO(EnM)/ e-tender/22-23/28 dtd-04/08/22
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Dipka Expansion Project, Dipka Area
Please refer to tender documents
3 documents required · 3 mandatory
₹15,500
19 Sept 2022
5 Aug 2022
20 Aug 2022
5 Aug 2022
18 Aug 2022
6 Aug 2022
5 Aug 2022 - 12 Aug 2022
120 days
Amount
Assistance in day to day running maintenance/ repair (i.e. to repair pipeline leakages, replacement of valves, flanges rubber packing and other works as required) of 04” and 06” dia MS pipelines and valves of different coal stocks at Dipka Expansion Project. Scope of Work: (Please refer to page no. 21 of NIT or Annexure-A in the uploaded tender documents for scope of work) Note:i). Rates are inclusive of CMPF, Pension, Contractor's Profit & other overhead expenses etc. excluding GST. ii). One manshift means one person deployed for this work for 8 hours.
Welder/Cutter (Skilled) One Manshift per day in general shift
Labour (Unskilled) Three Manshift per day in general shift
Contingent charges against welding machine & electrodes, gas charges etc.
Total impact of GST for the purpose of CTC
RISHABH KUMAR SAHU
KHUSHI TRADERS
M/S RAJENDRA SINGH
KRISHN DUTT GROUP
DINESH KUMAR
RAMESH PRASAD SINGH
SUHAGAN ENTERPRISES
stage.html
html • 0.05 MB
techsummary_260940.pdf
PDF • 2.20 MB
finsummary_260940.pdf
PDF • 2.20 MB
LOA28.pdf
PDF • 1.54 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .