Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.6 LAccepted-Finance | ₹7.6 L | L-1 | Accepted-Finance As evaluated by committee |
| 2 | L-2₹7.7 LAccepted-Finance | ₹7.7 L | L-2 | Accepted-Finance As evaluated by committee |
| 3 | Rejected-Technical D TYPE COLONY OD 46 SAMI 460447 | BETUL | MADHYA PRADESH | 460447 | - | - | Rejected-Technical The firm has not fulfilled the criteria of tender documents i.e. Clause no. 1 (e). |
| Sl No | Description | Qty | Unit | MD Construction & Civil Work L1 | VEDANSHI CONSTRUCTION AND SUPPLIERS L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation, transportation and spreading of Average 25mm thick layer of excavated spoil material like earth, Earth mixed with kanker, excavated spoil etc. over the dry ash surface of lagoon-I at 2x660MW SSTPP Stage-II, including cost of excavation, transportation upto the ash bund/dyke pond area, stacking of materials for measurement and spreading of it all over the dry ash surface of ash, making suitable approaches over the filled up ash ( For which required earth/spoil material will not be measured/paid) for shifting of material inside the pond area cutting , spreading and levelling of ash heap and making a plane surface and all over head expenses, all labour, taxes, T&P etc. complete as per direction of Engineer of In charge. | 4,920 | Cum | 154 ₹7.6 L | 156.99 ₹7.7 L |
Tender Value
₹9.7 L
EMD Value
₹19,400
Closing Date
29 Apr 2025, 3:30 pmClosed
SE PURCHASE AND WORK SSTPP DONGALIA
THIRD FLOOR ADMIN BUILDING SE PURCHASE AND WORK SSTPP DONGALIA
Excavation, transportation and spreading of excavated spoil on the dry surface of ash of Lagoon-I of Ash dyke Phase-II to prevent air pollution at SSTPP, MPPGCL, Dongalia Distt. Khandwa.
2025_MPPGC_402502_1
WT-2612
Open Tender
Civil Works - Others
120 days
SE PURCHASE AND WORK SSTPP DONGALIA
As per NIT
12 documents required · 12 mandatory
₹500
Yes
₹19,400
Yes
6 Feb 2026
21 Mar 2025
5 May 2025
21 Mar 2025
29 Apr 2025
21 Mar 2025
Amount
Excavation, transportation and spreading of Average 25mm thick layer of excavated spoil material like earth, Earth mixed with kanker, excavated spoil etc. over the dry ash surface of lagoon-I at 2x660MW SSTPP Stage-II, including cost of excavation, transportation upto the ash bund/dyke pond area, stacking of materials for measurement and spreading of it all over the dry ash surface of ash, making suitable approaches over the filled up ash ( For which required earth/spoil material will not be measured/paid) for shifting of material inside the pond area cutting , spreading and levelling of ash heap and making a plane surface and all over head expenses, all labour, taxes, T&P etc. complete as per direction of Engineer of In charge.
VEDANSHI CONSTRUCTION AND SUPPLIERS (BID ID -1245246)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid