Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹15,000
Closing Date
20 Jun 2026, 10:00 am6d left
SP BIJNOR
SP OFFICE BIJNOR
THANA KOTWALI DEHAT BIJNOR ME JAL NIKASI HETU NALI CHINAI WA MRAMMAT WORK
2026_UPPOL_1159974_1
BH-55/2026 THANA KOTWALI DEHAT BIJNOR ME JAL NIKASI HETU NALI CHINAI WA MRAMMAT WORK
Open Tender
Repair and Maintenance Works
30 days
SP OFFICE BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SP BIJNOR
₹15,000
13 Jun 2026
13 Jun 2026
22 Jun 2026
13 Jun 2026
20 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in oridinary soil, excavation to be in the form of regular pits not exceeding 0.5 M in depth and earth work in embankment to be in 20 cm layers, including ramming and dressing the surface to required levels and slopes and also including 1.50 M lifts and 30 M lead, watering upto required O.M.C. compacted to 95% proctor density including roayalty, the cost of water, roller charges, its loading, unloading, carriage and all labour and T&P etc. required for proper completion of work. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 M distance as directed by E-in-Charge. Rates include Rs. 6 per cum royalty which shall be deducted from contractor bill. S.No. 251 | 21.16 | Cum | 200 | ₹4,232 |
| 2 | Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 8:4:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. S.No. 281 | 5.29 | Qtl. | 6,820 | ₹36,077.8 |
| 3 | M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.No. 307 | 11.45 | Sqm | 5,310 | ₹60,799.5 |
| 4 | Cement concrete with 2 cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of work. S.No. 279a | 2.19 | Sqm | 7,100 | ₹15,549 |
| 5 | 12 mm thick plaster with 1 part of cement and 3 part ofcoarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. S.No. 583 | 49.8 | Sqm | 215 | ₹10,707 |
| 6 | Add GST 18% | 1 | Job | 22,925.74 | ₹22,925.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2173952.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid