| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.7 LAccepted-AOC | ₹94.7 L | L1 | Accepted-AOC LER |
| 2 | L2₹94.8 LRejected-Finance | ₹94.8 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | SAI SURYAA CONSTRUCTION L1 | OVIYA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Part I : Pathiyavadi Aniyalai Road To MGR Nagar Road KM 0/0-1/0 R141 | |||||
| 1.01 | Clearing the Scrub jungle including cutting the scrubs and removing away from site etc., | 1,200 | Sqm | 6.36 ₹7,632 | 6.36 ₹7,632 |
| 1.02 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B | 405 | Cum | 140 ₹56,700 | 140 ₹56,700 |
| 1.03 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, | 54 | Cum | 339.5 ₹18,333 | 339.81 ₹18,349.74 |
| 1.04 | Picking up existing BT surface upto 5 to 10cm of old mettalled surface, cambering, sectioning of carriage way etc., complete | 1,000 | Cum | 23.36 ₹23,360 | 23.36 ₹23,360 |
| 1.05 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 448.52 | Cum | 2,481.15 ₹11.1 L | 2,487.05 ₹11.2 L |
| 1.06 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST 5 specification. | 3,007.5 | Sqm | 87.18 ₹2.6 L | 87.18 ₹2.6 L |
| 1.07 | Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 3,007.5 | Sqm | 20.48 ₹61,593.60 | 20.48 ₹61,593.60 |
| 1.08 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 75.19 | Cum | 11,407 ₹8.6 L | 11,415 ₹8.6 L |
| 1.09 | Provision for Hectometer Stone | 4 | No. | 574.65 ₹2,298.60 | 574.65 ₹2,298.60 |
Updated dates
Tender Value
₹96.1 L
EMD Value
₹96,200
Closing Date
24 Feb 2026, 3:00 pmClosed
The Project Director, DRDA, Tiiruvannamalai
DRDA, Tiruvannamalai
Improvement of Rural Roads 2 Nos with 5 Years Routine maintenance in Kalasapakkam Block TVM/2025-26/266 under NABARD RIDF 2026-2027
2026_RDTN_656694_1
A11/0456/2026 Dt.12.02.2026 266
Open Tender
Civil Works - Roads
180 days
Kalasapakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹96,200
13 Mar 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
Part I : Pathiyavadi Aniyalai Road To MGR Nagar Road KM 0/0-1/0 R141
Clearing the Scrub jungle including cutting the scrubs and removing away from site etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Picking up existing BT surface upto 5 to 10cm of old mettalled surface, cambering, sectioning of carriage way etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST 5 specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Hectometer Stone
Provision for Name Board
Towards the charges for routline maintenance of the road work executed under NABARD Fund including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II : Improvement of the Road Pathiyavadi Pachiyammapuram Road Km 0/0-1/560 R142
Clearing the Scrub jungle including cutting the scrubs and removing away from site etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Picking up existing BT surface upto 5 to 10cm of old mettalled surface, cambering, sectioning of carriage way etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST 5 specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Hectometer Stone
Provision for Kilometer Stone
Provision for Sign Board
Metal Beam Crash Barrier Type - A, "W" Double Guard Providing and erecting Single sided Double Guard Metal Beam Crash Barrier System 1.70m high, comprising of 3mm thick wall "W" beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/sqm, 9 minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS: 1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge
Provision for Name Board
Provision for 1 Nos. of 3.00m RCC Culvert @ Ch.: 0/132
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm 155 metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 3 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete
Below Ground Level
Above Ground Lelvel
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specification clauses 1002, 1010 and 1202
Providing and fixing Tar paper for bearing b/n bed black & deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification clause 1204.3.8
Towards the charges for routline maintenance of the road work executed under NABARD Fund including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_787513.xls
BOQ • 0.37 MB
Technical_Bid_266.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid