| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 CrAccepted-AOC 2 M S CHIDAMBARAM 608001 | CUDDALORE | TAMIL NADU | 608001 | ₹15.7 Cr Quoted ₹16.2 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹16.7 CrRejected-Finance COIMBATORE TAMIL NADU 18 | 18 | ₹16.7 Cr | L2 | Rejected-Finance higher than lowest |
| 3 | L3₹16.8 CrRejected-Finance 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | ₹16.8 Cr | L3 | Rejected-Finance higher than lowest |
| 4 | L4₹17.4 CrRejected-Finance | ₹17.4 Cr | L4 | Rejected-Finance higher than lowest |
Updated dates
Tender Value
₹15.7 Cr
EMD Value
₹8 L
Closing Date
2 Mar 2026, 11:00 amClosed
Superintending Engineer-H-CandM Circle Villupuram
Office of the Superintending Engineer-H-C and M- Circle Ellis Chatram Road-Vazhudareddy-Villupuram
ormation of link road from km 110/2 of Villupuram - Pondy - Nagapattinam road SHU215 to km 0/8 of Chidambaram - Thandavarayansozhaganpettai road along the bund of Thillai Amman odai km 0/0-2/500 VPM-129
2026_HWAY_661830_1
TN58/2025-26/HDO Dt.17.02.2026
Open Tender
Civil Works - Highways
300 days
Cuddalore
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8 L
Yes
Villupuram
13 Mar 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
2 Mar 2026
23 Feb 2026
20 Feb 2026
Clearing light jungle including uprooting wild vegetation, grass, bushes, shurbs, sapling and disposal of unserviceable materials and stacking of serviceable material as per Clause 201 of MORT&H-V Revision
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of seigniorage charge all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For embankment / sub grade using Carted Earth with CBR 10 with a lead of 10km
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5- for GSB grading- V Material
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc.,including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5
Box culvert (3 CELLS OF 5.00m x 3.00m, SKEW 40 DEGREES) AT KM 2/2
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT& CUT OFF WALL
Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for Toe wall as per Section 1500,1700 & 2100 of MORT&H Specficaton (Fifth Revision-2013) for Toe wall & Rigid Apron
Vibrated Reinforced Cement Concrete M-30 Grade Design Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for CUTOFF WALL
M-Sand filling with good dry river sand from approved quarry including cost and conveyance to site including all labour charges for filling watering and consolidation etc. complete for foundation as per the drawing and standard specification as per MORTH No. 111,112,900 for Filling Below the Box culvert
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BOX CULVERT BOTTOM SLAB, WALLS & TOP SLAB
Supplying and fixing GI DRAINAGE SPOUTS 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised iron pipes and flats and fixing them in position, etc., complete as per cl 2705 of MORT&H specification. (V Revision)
Vibrated Reinforced Cement Concrete M-40, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc.,, complete for RCC CRASH BARRIERS OVER DECK SLAB as per Section 811,1700 & 2703.3 of MORT&H Specficaton (Fifth Revision-2013)
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013)
Vibrated reinforced cement concrete grade of M30 design mix using 20 mm ISS hard granite graded broken metal including cost and conveyance of all materials to site & cement at site excluding cost and fabrication of steel but including formwork and centering softwater labour charges for mixing, transporting,placing in, position vibrating andcompacting finishing & curing concrete, working at heights, hire charges fortools and plants, including all otherincidental charges etc., complete as .per standard specification for Wing wall and Retaining wall
Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for PCC parapet over APPROACH SLAB.
Vibrated Cement Concrete M15 grade, Nominal Mix 1:2:4, using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS size graded HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including all labour charges for mixing concrete, laying, vibrating, and hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, formwork, cost of remolded expansion joints and fixing the same in position etc, complete for APPROACH SLAB. as per Section 1500,1700 & 2704 of MORT&H Specficaton (Fifth Revision-2013)
Vibrated Reinforced Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton (Fifth Revision-2013)
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between deck and approach slab as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete(In Deck slab)
Providing and fixing P.V.C pipes of 160 mm dia of approved make with all Bends ,Elbows, Tee's..etc including all specials and adhesive for required lengths for drainage arrangement from the superstructure, including cost and conveyance of all materials to worksite, as per MORT&H specifications 2706 for Service Duct Pipe in Safety Kerb
Providing FILTER MEDIA behind Abutment and Returns for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-Rev.5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite including labour charges and all other incidental charges, etc complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014
Filling behind the End Side wall of Box Culvert and Retaining wall with clean gritty gravel to including cost and conveyance of gravel to worksite, laying,handling,charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc complete
Construction of Flexible apron comprising of loose stone boulders weighing not less than 40 Kg beyond curtain wall. as per drawing and Technical Specifications - for Flexible apron
Providing and fixing PVC seepage pipes of 110mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings
Box culvert (2 CELLS OF 3.00m x 3.00m, ) AT KM 0/2
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BOX CULVERT BASE SLAB, WALL & TOP SLAB
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specficaton (Fifth Revision-2013)
Vibrated reinforced cement concrete grade of M30 design mix using 20 mm ISS hard granite graded broken metal including cost and conveyance of all materials to site & cement at site excluding cost and fabrication of steel but including formwork and centering softwater labour charges for mixing, transporting,placing in, position vibrating andcompacting finishing & curing concrete, working at heights, hire charges fortools and plants, including all otherincidental charges etc., complete as .per standard specification for Wing wall
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for - FOR PARAPET
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete
Vibrated Reinforced cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges formwork cost of remolded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab. as per Section 2702.2 of MORT&H Specficaton (Fifth Revision-2013)
Providing FILTER MEDIA behind Abutment and Returns for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-Rev.5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite including labour charges and all other incidental charges, etc complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014
Filling behind Abutments and return wall with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014
Providing and fixing PVC seepage pipes of 110mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings
Box Culvert (1.50 x 1.50m)
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation
Plain Cement concrete M15 Grade using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, Hire charges for Tools and plants and all incidental charges such as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for Base course
Vibrated Reinforced Cement Concrete M25 (Design Mix) using ISS graded metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed etc., complete as per relevant standard specifications as directed by the Engineer for Box Culvert , Bottom Slab, Side wall & Top Slab
Supply and fabrication of Fe 500 Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for below sill & above sill level for Wing wall
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm and below hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.2 of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete as per MORTH No. 309
Filling behind as per Appendix 6 of IRC : 78-2014 with clean gritty gravel including cost and draining gravel having PHI value more than 35 conveyance of gravel to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete.
Providing and fixing 110 mm dia PVC seepage pipes of requied length for abutments and wngs including cost and conveyance of all materials to work site, cost and labour semi sperical backfill arrangements with 100mm size graniet stone at the periphery and labour charges for fixing etc., complete to drain the backfil as per standard specification as per MORTH No.2706
Pipe Culvert
Earth Work excavation in all classes of soils such as hard stiff clay, stiff black cotton,hard red Earth shales,murram, gravel stony,earth etc., and depositing on bank with all leads and lifts and all other incidental charges such as bailing out water etc., complete as per standard specification for FOUNDATION OF PIPE CULVERT
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF PIPE CULVERT
Vibrated Cement Concrete M20 (Nomimal mix 1:2:4) using 40mm ISS size HBG metal including cost and convecyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications.- FOR BODY WALL
Supply of NP3 Class RCC, 1000 mm dia Hume pipes of 2.50m length confirming to IS 458/1989 cost of pipe as a finished work including all other incidental charges testing charges including loading and unloading transporting and delivery in good condition at work site as directed by the departmental officer etc., complete.
Hoisting and fixing of 1000 mm dia pipes and collars to proper gradient including all labour charges and all other incidental charges etc., complete.
Refilling with clean gritty gravel including cost and convenveyance to site including labour charges for filling inlayers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc complete
Widening culvert at km.2/4
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. (Existing Structure PCC)
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BOX CULVERT BASE SLAB, SIDE WALL & TOP SLAB
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges , etc., complete. as per Section 2706 of MORT&H Specfication (Fifth Revision-2013)
Vibrated Cement Concrete of Grade M-20, Nominal Mix 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for WING WALLS
Vibrated Reinforced cement concrete of grade M30 (Design mix) using ISS hard broken granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.2 of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete as per MORTH No. 309
Refilling with clean gritty gravel including cost and convenveyance to site including labour charges for filling inlayers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc complete
Providing and fixing 110 mm dia PVC seepage pipes of requied length for abutments and wngs including cost and conveyance of all materials to work site, cost and labour semi sperical backfill arrangements with 100mm size graniet stone at the periphery and labour charges for fixing etc., complete to drain the backfil as per standard specification as per MORTH No.2706
Retaining Wall
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE
Vibrated reinforced cement concrete grade of M30 design mix using ISS hard granite graded broken metal including cost and conveyance of all materials to site & cement at site excluding cost and fabrication of steel but including formwork and centering softwater labour charges for mixing, transporting,placing in, position vibrating andcompacting finishing & curing concrete, working at heights, hire charges fortools and plants, including all otherincidental charges etc., complete as .per standard specification for Retaining wall below sill
Vibrated reinforced cement concrete grade of M30 design mix using 20 mm ISS hard granite graded broken metal including cost and conveyance of all materials to site & cement at site excluding cost and fabrication of steel but including formwork and centering softwater labour charges for mixing, transporting,placing in, position vibrating andcompacting finishing & curing concrete, working at heights, hire charges fortools and plants, including all otherincidental charges etc., complete as .per standard specification for Retaining wall Above sill
Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for PCC parapet over Retaining wall
Supply and fabrication of Fe- 500 grade steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods strengthening, cutting,bending,tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire,provision of spacer bars, cover blocks and all other incidental charges etc complete, -1 MT
Providing and fixing PVC seepage pipes of 110mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings
Providing FILTER MEDIA behind Abutment and Returns for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-Rev.5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite including labour charges and all other incidental charges, etc complete. as per CI.710.1.4 & Appendix 6 of IRC :78-2014
Drain
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 Base Course for Drain
Vibrated Reinforced Cement Concrete M25 (Design Mix) using ISS graded metal including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete as per relevent standard specification for Drain as per MORTH No. 111,112,900,1000, 1500,1700,2200 for Drain
Supply and fabrication of Fe 500 Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000
Providing and fixing of M.S Gratings of 300x200mm size with M.S flats of 25x10 mm for inner braces with mild steel grating and fixing them in position.
Parapet
Vibrated Cement Concrete of Grade M-20, Nomional Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for PCC parapet over Retaining wall
Easing
Picking 5cm to 10cm old metalled surface and sectioning and clearing away from the site and depositing the debris including labour charges for picking etc., complete as directed by the Engineer as per standard specification and also as per MORTH No.111,112,202
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For embankment / sub grade
Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5- for GSB grading- V Material
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc.,including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete which Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing RCC Centre Median height of 0.250m at bottom 0.250m at middle 0.400 at top and to a total height of 0.900m from the road level including cost and conveyance of all materials including cost & fabrication of steel to work site including providing form work for shuttering on both sides and chamfered edges at top, including cost of steel reinforcement as per the Bar bending schedule appended here with, fabrication and placing in position of steel grills including cost of binding wire, laying of R.C.C M25 concrete using ISS HBG graded metal including cost and conveyance of all materials to work site from the approved sources including labour charges for mixing laying curing etc middle of the median as directed by the departmental officers, Rendering Smoothness over the CC surface with 10 kg of cement for 10 Sq.m area and painting two coats over the CC surfaces with best approved quality of synthetic enamel paint including primer etc., including all labour charges, hire and fuel charges for the Hire charges for Tools and plants employed and as per the standard specification and in accordance with the drawings appended here with and as directed by the departmental officers etc., complete.
Calculation of SubTotal, GST and Total Amount carried out by system automatically
Basic cost of value put to tender as per estimate
Add GST at 18%
Total Value put to Tender
Difference in Value
Bidder quoted value
Add GST at 18% of Final quoted Value
Total Value of Contract Including 18% of GST
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
129PQ202526.pdf
Tender Documents • 0.52 MB
129PriceBid.pdf
Tender Documents • 0.50 MB
BOQ_794429.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid