Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.5 LAccepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | ₹95.5 L Quoted ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-Finance 1 21 B8 KHADAR MEERAN NAGAR THERMAL NAGAR TUTICORIN | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical KOLKATA | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Matching |
| Sl No | Description | Qty | Unit | A.K.B RAJA ENTERPRISES L2 | CKEE ENGINEERING PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.01 | Supply of 300 NB M.S. seamless pipe (Pipe Size; OD : 323.8 mm, Thickness:12.7 mm, Standard Length - 4 to 6 mtr) for furnace oil pumping line from IOC terminal to Fuel oil Pump House of Unit I to V (Reach –II, Junction Tower - IV to First Watch Tower).
Material : ASTMA 106 Grade 'B' Seamless | 320 | Meters | 67,93,600 ₹80.2 L | 61,76,000 ₹72.9 L |
| 1.02 | Erection and Commissioning of 300 NB M.S seamless pipes and providing cement pedestal for furnace oil pumping line from IOC terminal to Fuel Oil Pump House of Unit - I to V (Reach-II, Junction Tower – IV to First Watch Tower). | 1 | LS | 29,60,100 ₹34.9 L | 26,91,000 ₹31.8 L |
Tender Value
Refer Docs
EMD Value
₹71,600
Closing Date
27 Nov 2025, 2:00 pmClosed
CE/TTPS
CE/TTPS/THOOTHUKUDI
SUPPLY ERECTION AND COMMISSIONING OF 300 NB M S SEAMLESS PIPE WITH SUPPORTING PEDESTAL FOR FURNACE OIL PUMPING LINE FROM IOC TERMINAL TO UNIT I TO V OF FUEL OIL PUMP HOUSE FOR A LENGTH OF 320 MTRS REACH II JUNCTION TOWER IV TO FIRST WATCH TOWER
2025_EB_621044_1
CE/TTPS/4404M
Open Tender
Miscellaneous Works
90 days
TTPS
As per NIT
4 documents required · 4 mandatory
₹0
₹71,600
Yes
11 Feb 2026
7 Nov 2025
28 Nov 2025
7 Nov 2025
27 Nov 2025
7 Nov 2025
Supply of 300 NB M.S. seamless pipe (Pipe Size; OD : 323.8 mm, Thickness:12.7 mm, Standard Length - 4 to 6 mtr) for furnace oil pumping line from IOC terminal to Fuel oil Pump House of Unit I to V (Reach –II, Junction Tower - IV to First Watch Tower). Material : ASTMA 106 Grade 'B' Seamless
Erection and Commissioning of 300 NB M.S seamless pipes and providing cement pedestal for furnace oil pumping line from IOC terminal to Fuel Oil Pump House of Unit - I to V (Reach-II, Junction Tower – IV to First Watch Tower).
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_742618.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid