Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Akgarpur to Lakkho Thakur ke makan to Nagla Bohhara road Murlidhar Dham Colony Satoha road in District Mathura
2026_CEAGR_1125548_8
1240/14M-AC/2025-26 dated 28-02-2026
Open Tender
Civil Works
Percentage
180 days
Mathura
New Construction work
2 documents required · 2 mandatory
₹2,360
₹6.6 L
Yes
Agra
1 Apr 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
18 Mar 2026
Group-A Construction of embankment with Material Obtained from Availble Land Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1. with all lifts and leads,1000M spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5
Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site. spreading, grading to required slope and compacted to meet requirement of Table 300.2 as per Technical Specification Clause 303.1.
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete as per MORD clause 401.1 & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work.
Providing, laying, spreading and compacting machine crushed stone ballast of approved quarry of 53~22.4mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work as per MORD specifications no 405.
Construction of plain cement concrete pavement thickness as per drawing over a prepared sub base with 43 grade cement as per claus 1501.2.2 M 30 (grade) coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixture of not less then 0.20cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed site form work (steel channel laying and fixing of 125 micorn thick polythine film wedges steel plates including leveling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate viobrators and finished in countinous operations including provision of contraction and expansion, construction joints applying primer sealent and construction joint, admixtures as approved curing of concrete slab for 14 days curing compound (where specified) and water finishing to ines and grade as per drawing and technical specification clause 1501.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1
PCC 1:3:6 in Foundation Plain Cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed plsced in foundation and compcted by vibration including curring.
Reinforced Cement Concrete (M-20) in super-structure complete as per Drawing and Technical Specifications Clause 1500, 1600 & 1700
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses as per MoRTH Item No : 11.8
Supply and laying of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Part-A Maintainance Charge including @ All Items total work amount etc as per Direction of E/I for the period of Five Years from the actual completion of work. (Total Amount for CC Work Sl No. 1 to 10 = 8414171.91)
Maintainance of First Year (@ 0.00% of Total Work Amount of item 01 to 10)
Maintainance of Second Year (@ 0.25% of Total Work Amount of item 01 to 10)
Maintainance of Third Year (@ 0.50% of Total Work Amount of item 01 to 10)
Maintainance of Fourth Year (@ 0.75% of Total Work Amount of item 01 to 10)
Maintainance of Fifth Year (@ 1% of Total Work Amount of item 01 to 10)
Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable 2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment 3- Maintenance will be calculated on value of actual work done.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.08 MB
BOQ_2098264.xls
BOQ • 0.29 MB
T2_08Lakkho.pdf
Tender Documents • 2.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .