Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
5 Oct 2026, 1:00 pm7d left
SUPERINTENDING ENGINEER
RAPTI NAHAR NIRMAN MANDAL 1 BALRAMPUR
As per Tender Notice
2026_UPIDC_1189182_1
05/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Siddharthnagar
As per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹2.5 L
Yes
24 Sept 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF CANAL CROSSING | |||||
| 1.01 | Earth work in digging foundation for structures in all type of soil, including lead upto 30.00m, lift upto 1.5m. and its proper disposal as per direction given by engineer in charge required for proper completion of work including cost of all T.& P., labour etc. | 2,967.34 | Cum | - | - |
| 1.02 | Earth work in back filling and filling embankment in all type of soil including lead upto 30 m and lift upto 1.5 m, with manual compaction & dressing to profile required for proper completion of work including cost of all T.& P. | 3,005 | Cum | - | - |
| 1.03 | Laying CC A20-M15 in foundation of structures with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (20-40 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & mechanical vibration including cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc. | 54.49 | Cum | - | - |
| 1.04 | Laying CC A10-M30 with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (4.75-10 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & machanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc. | 8.32 | Cum | - | - |
| 1.05 | Laying RCC A20-M-25 with cement (OPC 43 grade) corse sand of F.M. not less than 2.5 and crushed stone grit 4.75mm to 20mm including lead upto 60.00m, lift upto 3.0m. machanical mixing & machanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc. | 368.98 | Cum | - | - |
| 1.06 | Laying CC A20-M20 in foundation of structures with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (4.75-20 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & machanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc. | 9.6 | Cum | - | - |
| 1.07 | Centering and shuttering for R.C.C work in different parts of structures with all leads and lift required for proper completion of work including cost of all T.& P., labour etc. | 1,281.08 | Sqm | - | - |
| 1.08 | Cutting ,bending, binding & placing TMT steel for reinforcement with cost of binding wire. in all structures required for proper completion of work including cost of all materials, labour carriage, rehandling and T&P etc. | 26.79 | MT | - | - |
| 1.09 | Providing & laying PVC rubber seal 225 mm wide and 10 mm thick for proper completion of work including cost of all materials, labour, T&P etc. | 9.6 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_2240478.xls
BOQ • 0.26 MB
lot1.pdf
PDF • 3.04 MB
5cori.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .