Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
5 Jun 2026, 12:00 pmClosed
SE/VEDC/Villupuram
No 10 power house road villupuram
Demolishing the existing damaged gets toilet and construction of new toilet at central office villupuram
2026_EB_677957_1
ET02/2026-27 dt.21.05.2026
Open Tender
Civil Works - Others
Works
villupuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
₹8,000
Yes
21 May 2026
21 May 2026
6 Jun 2026
21 May 2026
5 Jun 2026
21 May 2026
21 May 2026 - 5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material and Labour Charges | |||||
| 1.01 | Dismantling of Brick /Stone masondry in cement mortar wall under 3 m height the cost of labour ,lead charges etc and removal of debries 10 km lead including the cost of including Loading unloading and transportation charges. | 12.5 | cum | - | - |
| 1.02 | Dismantling RCC by manual / by using deploying as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps, etc., | 1.15 | cum | - | - |
| 1.03 | Earth work excavation for foundation and depositing on bank with initial lead of 10m & initial lift of 2m as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps, etc., complete. | 14.2 | cum | - | - |
| 1.04 | Supplying and filling of M sand well watered and consolidated in foundation and basement in layers complying with standard specification and as directed by the Engineer in charge including cost of all materials, all labour charges, lead, lift, T&Ps, etc., complete. | 2.5 | cum | - | - |
| 1.05 | Providing P.C.C 1:3:6 using 40mm HBG metal for foundation and Basement as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&Ps, etc., complete. | 2.85 | cum | - | - |
| 1.06 | RCC 1:1.5:3 using 12-20mm (machine crushed) metal for raft foundation without formwork as directed by the Engineer in charge including cost of all materials, labour charges, curing, lead, lift, T&Ps, etc., complete. | 2.4 | cum | - | - |
| 1.07 | RCC 1:1.5:3 using 12-20mm HBS metal (machine crushed) metal for concrete works with centering, shuttering form work as directed by the Engineer in charge including cost of form work, centering and shuttering, cost of all materials, labour charges, vibrating the concrete, curing, lead, lift, T&Ps, etc., but excluding cost of steel reinforcement. Column up to Basement | 0.35 | cum | - | - |
| 1.08 | Grade beam | 1.5 | cum | - | - |
| 1.09 | Column above Basement, up to Ground floor Roof level parapet wall | 1.15 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_814509.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .