Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | 1 | Accepted-AOC ok | |
| 2 | 2₹8.0 L+₹2.3 L (41.0%)Rejected-AOC 1 VILLAGE JYOTISAR DISTT KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | 2 | Rejected-AOC not ok |
Tender Value
₹5.8 L
EMD Value
₹11,540
Closing Date
11 Apr 2022, 12:00 pmClosed
Executive Engineer Karnal W/S Divsion, Karnal
Executive Engineer Karnal W/S Divsion, The Mall Road Karnal
Construction of Syphon 20 Cs. Discharge under Kurlan Minor at RD 27570 to Safeguard 80 Acre Agricultural Land area of Village Khaktor and Ballah against flood water.
2022_HRY_214318_2
No.2488-2503/53M dated 22/03/2022
Open Tender
Civil Works
Item-rate/Agreement basic
310 days
KARNAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹11,540
Yes
24 Jun 2022
25 Mar 2022
11 Apr 2022
25 Mar 2022
11 Apr 2022
25 Mar 2022
Amount
Works Details
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item no. 5.7.4
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORT&H specifications Ordinary soil, Depth up to 3 m. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR 15.1.2.1
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item no. 6.29.1
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work,including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering,shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. M-15 grade plain cement concrete (cement content considered including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item no 6.22.2.2 @ 240 kg/cum (Note :- Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix).
Centering and shuttering including strutting, propping etc. and removal of form Suspended floors, roofs, landings, balconies including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item no. 6.30.3
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. All works up to plinth level including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item no. 6.25.1 (Note :- Cement content considered in this item is @ 330 kg/cum. Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix).
Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: Cement mortar 1:3 (1 cement: 3 coarse sand) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications.
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item no. 6.33.6
Credit of Brick.
ENVIRO CONSTRUCTIONS SERVISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .