Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC | ₹1.5 Cr | 1 | Accepted-AOC Value Quoted by the bidder is less than put to tender value |
| 2 | 2₹1.5 Cr+₹4.1 L (2.70%)Rejected-AOC | ₹1.5 Cr+₹4.1 L (2.70%) | 2 | Rejected-AOC Value Quoted by the bidder is higher than put to tender value |
Tender Value
₹1.5 Cr
EMD Value
₹95,980
Closing Date
9 Aug 2023, 11:00 amClosed
executive officer
arulmigu ekambaranathar temple kanchipuram
conservation works in roof top of first praharam,second praharam and rishi mandapam
2023_HRCE_348101_1
7807/2023/G1
Open Tender
Civil Works - Others
Lump-sum
270 days
arulmigu ekambaranathar temple premises
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹95,980
Yes
5 Oct 2023
24 Jul 2023
9 Aug 2023
24 Jul 2023
9 Aug 2023
24 Jul 2023
Amount
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work. Vimanam ht upto 15'0"
Dismantling ,clearing away and carefully stacking materials usefil for reuse for any thickness of walls . Brick work in cement mortar
Dismantling the existing damaged weathering course and pressed tiles over the first praharam and seccond prahram roof top to the thickness of 38cm including removing all debris from site of work.
Scraping the decayed plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds Vimanams / Gopurams up to 50' 0" height (excluding Kalkaram
Brick masonry lime mortar 1:2 (one lime and two sand) using Special Bricks 8” x 4” x 2” for Heritage Works including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram Kalkaram Upto 15'0" for Sannathi
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortar 1:1.5 (one lime and one and half sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram a)For kalkaram of vimanam / gopuram shaping in vargams
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortar 1:1.5 (one lime and one and half sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram b)Vimanam / gopuram of ht. Up to 15'0" excluding Kalkaram
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1.5 (one lime and one and hald sand) finishing the same with LM 1:1.5 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) Sudhai size above 2' 6" up to 3' 6"
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area. Vimanam / gopuram of ht. Up to 15'0" excluding Kalkaram
Repainting the old wood work two coats in all floors with best Synthetic enamel paint of approved quality, colour and brand including thorugh scrapping, sand papering and preparation of surface including cost of bruses, high scaffolding charges neat finishing etc complete complying with standard specification and as directed by the departmental officers at site of work.
Cleaning the stone surfaces by water washing the stone elements like wall, piller, uthiram, pothiyal, pavukal and etc., including cost of material and labour charges etc,.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
plastering lime mortar 1:1.5 for the 20mm thickness using the fine river sand including hacking the surfaces and providing necessary nosing, beeding as per size specified wherever necessary using the same mix etc., complete inlcuding curing and finishing neatly complying with standard specification and as directed by the departmental officers
Providing flat bricks on the terrace top using two layer of specially manufactured superior quality chamber moulded terrace brick of size 150x75x25mm for heritage works laid with lime mortar 1:1.5 (one lime and one half sand) and the joints of bricks raked up to receive lime mortar plastering to be done over the roof surface. The flat bricks should be laid in such a manner with proper slope and gradient that the rain water gets discharged easily through rain water outlet pipes freely. The quality of lime to be procured from Pollachi shall be of best and high calcium oxide content quality. This flat bricks shallbe subjected to curing for a period of 7 to 10 days and after which loose lime particles will be removed and the joints raked up to take up lime mortar plastering (two layers)
Pointing the Cut stone masonary work with Lime mortar 1:1.5 (one lime, one and half sand) 20mm deep excluding cost and conveyance of cut stone but including all labour charges scaffolding etc complete with standard specifications. The lime used should be highly iron fortified and suitable for structural and masonry works.
providing polymer coating(water proof coating) with following specification and the surface shall be cleaned to remove all dust,foreign,matters lose materials or any other deposits of contamination by rubbing withwire brush,slurry,dry blend and polymer liquid blend shall be mixed into the desired ratio as per recommendation of the supplier.the mix shall be stirred thoroughly until no bubbles remain in the mix. any lumps found in mix shall be removed. apply first coat of polymer modified cementitious slurry by brush on wet cleaned surface. after drying ,second coat shall be applied on the first coat as diected by the departmental officers ect.the rate inclusive of coat of materials and labour,etc.,complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Sub Total
P K SUDARVEL PANDIAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_414882.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .