Tender Value
₹6.4 Cr
EMD Value
₹12.7 L
Closing Date
31 Jul 2026, 5:00 pmDue today
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
CONTRACTS
19 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, ; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. ( Click here to download Format)
Tenderer shall carefully read clause No. 10 including clause no. 10.1 to10.5 of IRGCC April 2022.
The total value of similar nature of work completed during the qualifying period and not the payments received within qualifying period alone, shall be considered. In case, final Bill of similar nature of work has not been passed and final measurements have not been recorded, the paid amount including statutory deductions will be considered. If final measurements have been recorded and work has been completed with negative variation, then also the paid amount including statutory deductions will be considered. However, if final measurements have been recorded and work has been completed with positive variation but variation has not been sanctioned, original agreement value or last sanctioned agreement value whichever is lower shall be considered for judging eligibility.
In case JV firms are allowed to participate, Technical Eligibility of the JVFirm shall be adjudged based on satisfactory fulfillment of the ParaNo.17.15.1 of J.V. guide lines of IRSGCC April-2022 [read with up to datecorrection slip].
The work experience certificate shall be in the name and style of the tenderer participating or as per provisions under Clause 17.15 of GCCApril-2022 for JV Firm, if eligible
The work experience certificate shall be issued by an officer not below the rank of JA Grade or Bill passing Officer in Railways and Bill passing Officer/Executive In-charge of work in other Govt. / Govt. bodies / PSUs. The certificate should bear the signature and seal of the issuing officer, name of the department etc. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Definition of Similar Nature of work: Repair, rehabilitation, or overhauling of bogies for BG electric/diesel locomotives in Indian Railways. OR The firm should be an approved source of RDSO/CLW/BLW/PLW for the supply, repair, or rehabilitation of bogies for BG electric/diesel locomotives.
105 conditions · 27 needing a document upload
Inclusion of 'Letter of Credit' as Mode of Payment in Works Tenders or Service Tenders as per Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.2018 remarks from Tenderer required
(i) The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (ii)documents shall be submitted according to clause 14 of IRGCC 2022:
List of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract [IRSGCC] as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the attached documents to the tender for reference. Hard copy of IRSGCC (with up-to-date correction slip) may be perused in the office of the Principal Chief Engineer Officer/ South Western Railway / Hubballi - 580020. The tenderer/sis/are deemed to have kept himself/themselves fully Informed of the provisions of the IRS General conditions of Contract including all corrections and Amendments issued up to date while submission of offer and any claim that he/they is/are not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
Manual tenders, supporting documents etc., sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
All requisite documents are to be properly submitted online only and the bidders should ensure that the content of the documents uploaded is distinctly legible /readable.
CORRIGENDUM NOTICE ON IREPS: Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing oftender, during which tenderers can submit their offer.
No Technical and Financial credentials are required for tenders having value up to Rs 50 lakh. For tenders valuing more than Rs. 50.00 lakh: The offer of Tenderer(s) who do not enclose Experience Certificate & Turnover Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted /received after the tender opening shall not be given any credit and shall not be considered.
Attestation of documents may be self attested or attested by a Gazetted Officer.
Railway reserves the right to verify the authenticity of the documents/information furnished.
IRSGCC para 6.0 of part-I (a)(ii) Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act,2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST)also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input
Increase/decrease of TAXES: if rates of existing GST or cess on GST for Works Contract is increased or any new tax /cess on Works Contract is imposed by Statute after the date of opening of tender but within the original date of completion/date of completion extended under clause 17 & 17A and the Contractor thereupon properly pays such taxes/cess, the Contractor shall be reimbursed the amount so paid. Further, if rates of existing GST or cess on GST for Works Contract is decreased or any tax/cess on Works Contract is decreased / removed by Statute after the date of opening of tender, the reduction in tax amount shall be recovered from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India.
This tender complies with PUBLIC PROCUREMENT POLICY ORDER-2017 dated15.06.2017.Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions. Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time totime, shall be followed for consideration of tenders.
Fixed Deposit Receipts (FDRs) submitted after award of tender towards Security Deposit/Performance Guarantee should be with automatic renewal facility only.
CONSORTIUM AGREEMENTS AND MOUS SHALL NOT BE CONSIDERED FOR PARTICIPATING IN THIS TENDER.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Shramik kalyan While processing payment of any 'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramik kalyan portal at'www.shramikkalyan.indianrailways.gov.in' till ____Month, ____Year.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
In case of any wrong information submitted by the tenderer, the contract shall be terminated, earnest money deposit (EMD). performance guarantee (PG) and Security deposit (SD) of the contract forfeited and agency barred for doing business on entire Indian Railways for five years.
Please submit your bank details i.e Name of Bank along with Bank Branch Code, Accounts number as appearing in the cheque book, IFSC code and PAN number, duly certified by the authorized official of the bank, to facilitate payment through ECS/NEFT/RTGS. In lieu of the Bank certificate photocopy/scanned copy of a cancelled cheque and Pan card may be attached for verification of the above particulars. Otherwise, the tender will be summarily rejected.
The tenderer has to upload the supportive documents against the 'Type of Firms' as mentioned below: 'Sole Proprietorship Firm: Notarized affidavit claiming the firm to be a sole proprietor firm 'Company: MOA, AOA, Power of attorney' Partnership Firm: Deed of Partnership, Power of attorney and an Undertaking for not being Blacklisted/Debarred as per Annexure-A: otherwise the offer of the tenderer will be summarily rejected.
Eligibility criteria for works tender in respect of partnership firms:-
in case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
JOINT VENTURE will not be permitted for the tenders.
Any Conditional offer will be summarily rejected.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Rates are inclusive of all taxes/GST, license fee, royalty charges etc. legally leviable by State, Central Govt. and/or any other local authority.
Earnest Money and Tender Document Cost: -All the tenderers / Contractors have to deposit full earnest money and tender document cost as stipulated in the tender document through online modes as permitted in IREPS application.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract [IRSGCC] as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the attached documents to the tender for reference. Hard copy of IRSGCC (with up-to-date correction slip) may be perused in the office of the Principal Chief Engineer Officer/ South Western Railway / Hubballi - 580020. The tenderer/sis/are deemed to have kept himself/themselves fully Informed of the provisions of the IRS General conditions of Contract including all corrections and Amendments issued up to date while submission of offer and any claim that he/they is/are not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
Manual tenders, supporting documents etc., sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
All requisite documents are to be properly submitted online only and the bidders should ensure that the content of the documents uploaded is distinctly legible /readable.
CORRIGENDUM NOTICE ON IREPS: Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing oftender, during which tenderers can submit their offer.
No Technical and Financial credentials are required for tenders having value up to Rs 50 lakh. For tenders valuing more than Rs. 50.00 lakh: The offer of Tenderer(s) who do not enclose Experience Certificate & Turnover Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted /received after the tender opening shall not be given any credit and shall not be considered.
Attestation of documents may be self attested or attested by a Gazetted Officer.
Railway reserves the right to verify the authenticity of the documents/information furnished.
IRSGCC para 6.0 of part-I (a)(ii) Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act,2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST)also, as notified by Central/State Govt.& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input
Increase/decrease of TAXES: if rates of existing GST or cess on GST for Works Contract is increased or any new tax /cess on Works Contract is imposed by Statute after the date of opening of tender but within the original date of completion/date of completion extended under clause 17 & 17A and the Contractor thereupon properly pays such taxes/cess, the Contractor shall be reimbursed the amount so paid. Further, if rates of existing GST or cess on GST for Works Contract is decreased or any tax/cess on Works Contract is decreased / removed by Statute after the date of opening of tender, the reduction in tax amount shall be recovered from Contractor's bills/Security Deposit or any other dues of Contractor with the Government of India.
This tender complies with PUBLIC PROCUREMENT POLICY ORDER-2017 dated15.06.2017.Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions. Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time totime, shall be followed for consideration of tenders.
Fixed Deposit Receipts (FDRs) submitted after award of tender towards Security Deposit/Performance Guarantee should be with automatic renewal facility only.
CONSORTIUM AGREEMENTS AND MOUS SHALL NOT BE CONSIDERED FOR PARTICIPATING IN THIS TENDER.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Eligibility criteria for works tender in respect of partnership firms:-
in case the tenderer is a partnership firm s , the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
During the currency of the contract, no partner of the firm shall be permitted to withdraw from partnership business and in such and event it shall be treated as breach of trust and abandonment of the contract.
JOINT VENTURE will not be permitted for the tenders.
Any Conditional offer will be summarily rejected.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in these standard formats.
Overhauling of Co-Co Flexi-Coil Mark IV High Adhesion Bogies of WAP7/WAG9-HC Locomotives for a period of two (02) years at Loco Shed Hubli
296HMDslOHLofBogies
296HMDslOHLofBogies
Open
Works - General
730 Days
Dharwad, Karnataka
₹0
₹12.7 L
10 Jul 2026
10 Jul 2026
17 Jul 2026
15 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,65,76,992 | ||
| — | — | — | 90,68,782.56 | ||
| . Brake Hanger Pins (Must change items) as per Table-I. (232 Nos. for TOH/IOH Schedule) | — | 232.00 | — | — | |
| — | — | — | 1,12,56,781.52 | ||
| . Bushes (Must change items) as per Table-II. (232 Nos. for TOH/IOH Schedule) | — | 232.00 | — | — | |
| — | — | — | 62,51,427.92 | ||
| . Split Pins, Flat Split cotters and Hardware items (must change items) as per Table-III. (232 Nos. for TOH/IOH Schedule) | — | 232.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
FinalTenderdocumentofBogieoverhauling.pdf Tender document
ATTACHMENT
GCC WORKS 2022
ATTACHMENT
AdvanceCorrectionSlipNo.1.pdf
ATTACHMENT
AdvanceCorrectionSlipNo.2.pdf
ATTACHMENT
AdvanceCorrectiottSlipNo.3.pdf
ATTACHMENT
AdvanceCotectionSlipNo.4.pdf
ATTACHMENT
AdvanceCorrectionSlipNo.5.pdf
ATTACHMENT
AdvanceCoruectionSliPNo.6.pdf
ATTACHMENT
AdvanceCoruectionSliPNo.7.pdf
ATTACHMENT
AdvanceCoruectionSliPNo.8.pdf
ATTACHMENT
AdvanceCoruectionSliPNo.9.pdf
ATTACHMENT
AdvanceCoruectionSliPNo.10.pdf
ATTACHMENT
ADVANCECORRECTIONSLIP11.pdf
ATTACHMENT
FinalTenderdocumentofBogieoverhauling.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].