| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAdmitted-Finance 4 109 PALLIPATTY VILLAGE PALLIPATTY PO METTUR TK SALEM DISTRICT METTUR 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | ₹4.6 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| Sl No | Description | Qty | Unit | AMMASI.P L1 |
|---|---|---|---|---|
| 1.00 | Check surveying and pit marking including hire charges for T & P all labour charges, lead, lift, etc., complete. | 9 | LOC | 2,000 ₹18,000 Lowest |
| 2.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(In Hard gravelly soil) | 2,284 | M3 | 120 ₹2,74,080 Lowest |
| 3.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Soft disintegrated rock not requiring blasting) | 305 | M3 | 200 ₹61,000 Lowest |
| 4.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock requiring and blasting) | 305 | M3 | 800 ₹2,44,000 Lowest |
| 5.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock wedging and chiselling ) | 152 | M3 | 1,000 ₹1,52,000 Lowest |
| 6.00 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete | 70 | Hrs | 500 ₹35,000 Lowest |
| 7.00 | Providing shoring and shuttering with CW scantlings and planks including cost of all materials, labour etc., complete. | 362 | M2 | 500 ₹1,81,000 Lowest |
| 8.00 | Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KCR type tower | 1 | LOC | 25,000 ₹25,000 Lowest |
| 9.00 | Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KCO type tower | 1 | LOC | 30,000 ₹30,000 Lowest |
| 10.00 | Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For CZ type tower | 2 | LOC | 20,000 ₹40,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
16 May 2022, 2:30 pmClosed
CE/TP-I/CHN
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Earthwork excavation, stub setting, concreting, supply and erection of towers and stringing of 6 Nos. of panther conductor and 1 No. of GI earth wire for erection of 110 KV DC line on DC tower with panther conductor for making LILO of the existing Ho
2022_EB_230837_1
TP1-013/2022-23
Open Tender
Civil Works
Works
120 days
KRISHNAGIRI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.2 L
Yes
26 May 2022
30 Apr 2022
17 May 2022
30 Apr 2022
16 May 2022
30 Apr 2022
Amount
Check surveying and pit marking including hire charges for T & P all labour charges, lead, lift, etc., complete.
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(In Hard gravelly soil)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Soft disintegrated rock not requiring blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock requiring and blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock wedging and chiselling )
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete
Providing shoring and shuttering with CW scantlings and planks including cost of all materials, labour etc., complete.
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KCR type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KCO type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For CZ type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For DD wet
PCC 1:3:6, using 20mm HBG metal for tower foundation without formwork but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete.
PCC 1:3:6, using 20mm HBG metal for tower foundation with formwork but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete.
RCC 1:1.5:3 using 12 to 20mm HB Stone for tower foundation with form work but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete. (Excluding RTS steel)
PCC 1:2:4, using 12-20mm HBG metal for tower foundation, chimney, muffing and copping with form work including cost of cement all materials, labour, lead, lift, etc., complete.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Back filling of excavated pits of tower and other equipment foundation after completion of concreting, including watering and consolidation, labour etc., complete.
Removal of excess excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Supply and labour charges for providing pipe type earthing of tower with G.I earth pipe 40mm dia and earth strips lead, lift, etc, complete.
Plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour etc., complete.
Labour charges for Erection of normal tower including sorting out of tower parts at Site,unloading at site, erection of towers, tightening and punching of bolts &nuts if neccessary for final checking, including all lead, lift, labour etc. Complete including charges & rectification of tower parts if any including Tools & Plants all labour lead, lift, adhering to all safety norms, etc complete.
Labour charges for Tack welding of bolts and nuts in towers up to bottom cross arm using diesel generator sets and applying cold galvanizing paint including cost of all materials, lead and hire charges etc., complete.
Labour charges for transporting and Hoisting of single units of Disc 7 nos of 110 KV 90 KN insulator with single suspension fittingsincluding cost of all labour, lead, lift, adhering to all safety norms etc.,complete. (Insulators will be supplied by board)
Labour charges for transporting and Hoisting of single units of Disc 8nos of 110 KV 120 KN insulator with single tension fittings including cost of all labour, lead, lift, adhering to all safety norms etc.,complete. (Insulators will be supplied by board)
Paying out, Rough sagging, Tensioning of 6 Nos of ACSR PANTHER conductor ensuring the conductor do not touch ground during the entire activity for Clipping, providing trussels at required intervals for paying out the conductor, Providing Vibration dampers at tension location, giving jumper connection including cost of lead, lift, labour, major & minor T&P,s maintaing ground clearance as per profile and adharing to all safety norms etc.Complete.
Paying out, Rough sagging, Tensioning of 3 Nos of ACSR PANTHER conductor ensuring the conductor do not touch ground during the entire activity for Clipping, providing trussels at required intervals for paying out the conductor, Providing Vibration dampers at tension location, giving jumper connection including cost of lead, lift, labour, major & minor T&P,s maintaing ground clearance as per profile and adharing to all safety norms etc.Complete.
Paying out,Sagging and tensioning of 1 No .of GI earth wire (7/3.55mm) to the required clearance, clipping using necessary clamp, tools with cost of required tension and suspension fittings and all materials lead lift ect completeadharing to all safety norms etc.Complete.
Arranging and availing line clear in HT/LT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT/ LT, lines earthing lead, lift, T&P etc., complete.
Providing temporary stays during rough sagging and tensioning including excavation, refilling and dismantling the stays after tensioning etc., complete.
Providing well supported upto 5 m trussels for Highways, Telepohone lines crossings during paying out,rough sagging and tensioning of power conductors and earth wire including cost of bamboo, coir and labour for excavation etc., complete.
Painting with best quality of anti-corrosive black paint for a height of 45cm from the top level of coping including cost of paint all labor etc., complete.
Clearing heavy Juliflora jungle without uprooting for carrying out the stringing works
Fabrication, supply and fixing in position of the Name Board made of steel sheet 18 Gauge (1.25mm)thick and Letter painting over the board as directed by the Engineer in charge of the work.
Supply and Labour charges for fixing number plate as directed by the Engineer in charge of the work including all labour etc., complete
Supply and Labour charges for fixing Danger boards as directed by the Engineer in charge of the work including all labour etc., complete
Supply and Labour charges for fixing Phase plates as directed by the Engineer in charge of the work including all labour etc., complete
Supply and fixing of Aluminium earth bond for earthwire
Supply and fixing of 16mm dia U bolt and nuts/Hanger/eye bolts for panther
Supply and fixing of D Shackle for panther
Supply and fixing of Vibration Damper for panther
Supply and fixing of Repair sleeve for panther
Supply and fixing of MID span joint for panther
Supply and fixing of Single Suspension fittings for panther
Supply and fixing of Single tension fittings for panther
Supply and fixing of single tension fittings for earth wire
Cutting and felling of Big size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Cutting and felling of Small size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Fabrication, galvanisation and supply of standard MS tower parts as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745(Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to avarage for inspection of towers at purachase factory at his own cost)
Fabrication, galvanisation and supply of standard HTS tower parts as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745(Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to avarage for inspection of towers at purachase factory at his own cost)
Fabrication, galvanisation and supply of Bolts & Nuts to site including all taxes and duties, fright charges etc, complete. The governing standards for Bolts & Nuts should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to avarage for inspection of towers at purachase factory at his own cost)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .