Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45,663Admitted-Finance | ₹45,663 | L1 | Admitted-Finance |
| 2 | L2₹49,000Admitted-Finance 0 SUBHASH MARG HANUMAN MANDIR ROAD WARD NO 9 MANDSAUR MADHYA PRADESH 458883 UDYAM MP 30 0041486 | MANDSAUR | MADHYA PRADESH | 458883 | ₹49,000 | L2 | Admitted-Finance |
| 3 | L3₹51,000Admitted-Finance | ₹51,000 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.S. TRANSMISSION AND CONSTRUCTION COMPANY L3 | SHREE BALAJI ENTERPRISES L2 | VASU ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Loading of 132 KV Control Panel with the help of crane at 132 KV S/S Shamshabad, Agra. | 1 | Job | 2,500 ₹2,500 | 2,000 ₹2,000 | 3,499 ₹3,499 |
| 2.00 | Safely carriage of 01 nos. 33 KV Triple Feeder Control/Relay Panel from 132 KV S/S Shamshabad to 132 KV S/S Bah (approx distance 85km) on private vehicle including work shifting control panel from store to loading place with the help of special T&P and skilled labour etc, operator and private vehicle provided by the conractor and also paying the toll tax by the contractor. | 1 | Job | 5,000 ₹5,000 | 2,000 ₹2,000 | 11,990 ₹11,990 |
| 3.00 | Unloading of 132 KV Control Panel with the help of crane at 132 KV S/S Bah, Agra. | 1 | Job | 3,500 ₹3,500 | 2,000 ₹2,000 | 3,490 ₹3,490 |
| 4.00 | Dismantling of old relays & providing the DC to this relays from VCB. Then doing the protection connection from Relay to VCB & CT, so that it can provide protection to the feeder & panel can be shifted online. | 1 | Job | 2,500 ₹2,500 | 2,000 ₹2,000 | 4,990 ₹4,990 |
| 5.00 | Dismantling of old static Control/Relay Panel after opening all internal control wiring CT, PT, Circuit Breaker etc with all indication and note down in note book wth ferruling than opening/cutting earthing strip etc and safely shifted to control room to pen store with special T&P and skilled labour without hinderence the other running feeder. | 1 | Job | 2,500 ₹2,500 | 3,000 ₹3,000 | 4,995 ₹4,995 |
| 6.00 | Erection of 33 KV Triple Feeder Control/Relay Panel at control room at 132 KV S/S Bah in place of outdated control panel including work of shifting control panel from open store to control room with the help of skilled labour and special T&P etc and fixing the panel in place of removing panel through grouting anchor boult in floor with proper arrangement to fill the open space by providing extra MS angle/strip/MS sheet and earthed at two point and connect each other throught earthing strip for safety purpose. | 1 | Job | 25,000 ₹25,000 | 4,000 ₹4,000 | 6,460 ₹6,460 |
| 7.00 | Removing the old cables if required, than laying of new cables as per requirement of CT/PT/CB/OC etc. this work including cable glanding & fitting of legs with all associated works. | 1 | Job. | 1,000 ₹1,000 | 2,000 ₹2,000 | 4,999 ₹4,999 |
| 8.00 | Termination of cable wiring. | 50 | Nos. | 7,500 ₹7,500 | 30,000 ₹30,000 | 3,250 ₹3,250 |
| 9.00 | Shifting of old control panel from control room to JE Store with the help of special T&P and skilled labour. | 1 | Job. | 1,500 ₹1,500 | 2,000 ₹2,000 | 1,990 ₹1,990 |
Tender Value
₹46,000
EMD Value
₹1,000
Closing Date
17 Apr 2025, 12:00 pmClosed
EE ETD-III AGRA
EE ETD-III AGRA
Maintenance work as per BOQ
2025_UPTCL_1026936_1
03/ETD-III(A)/2025-26
Open Tender
Electrical Works
90 days
Maintenance work as per BOQ
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
EE ETD-III AGRA
₹1,000
Yes
30 Mar 2026
9 Apr 2025
17 Apr 2025
9 Apr 2025
17 Apr 2025
9 Apr 2025
stage.html
html • 0.03 MB
technical_1855683.pdf
techsummary_1855683.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
03TECHNICAL.pdf
Tender Documents • 0.81 MB
BOQ_1855683.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid