| 1 | ₹6.9 LAWARDED | AWARDED |
Tender Value
₹8.4 L
EMD Value
₹12,500
Closing Date
4 Jul 2025, 10:00 pmClosed
Directorate of Municipal Administration
Construction of Compound Wall at CMC WTP in Sindhanur Municipal Limit
DMA/2025-26/BD/WORK_INDENT40411
DMA/2025-26/BD/WORK_INDENT40411
Reserved
Buildings
Electronic Documents, First(One Cover)
DMA City Municipal Council Sindhanuru
₹500
₹12,500
18 Jun 2025
18 Jun 2025
3 Jul 2025
Construction of Compound Wall at CMC WTP in Sindhanur Municipal Limit
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, inc...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. For Cement Concrete Drain Walls 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/ welding joints, tyi...
Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of m...
Distempering with dry distemper of approved brand and manufacture (two coats) of required shade on new work, over and including water thinnable priming coat to give an even shade after thoroughly broo...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .