Loading…
Loading…
Updated dates
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
6 Jun 2026, 4:00 pmDue tomorrow
Executive Engineer RnB Division Kupwara
Executive Engineer RnB Division Sulkote Kupwara
Construction of Science Lab at Boys High School Gulgam
2026_PWDJK_310251_3
NIT No. 07 of 2026-27 of RnB Division Kupwara
Open Tender
Civil Works
30 days
Boys High School
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer RnB Division Kupwara
₹36,000
19 May 2026
19 May 2026
6 Jun 2026
19 May 2026
6 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 34.37 | Cum | 256.85 | ₹8,827.93 |
| 2 | Providing and laying Stone solling Hand packed including compacting, watering including all carriages of material complete. | 8.15 | Cum | 1,000 | ₹8,150 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level (1:4:8) (1Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size) | 8.15 | Cum | 5,202.9 | ₹42,403.64 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)incl all carriages 20mm nominal size) Crushed. (All Works up to Plinth level) raft | 9.13 | Cum | 7,788.4 | ₹71,108.09 |
| 5 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:2:4 coarse sand 20mm nominal size crushed stone agg.) | 23.39 | Cum | 6,591.25 | ₹1,54,169.34 |
| 6 | Centering and shuttering including strutting propping etc. removal of form work in Raft,foundation and plinth (All works upto Plinth level) | 95.63 | sqm | 286.35 | ₹27,383.65 |
| 7 | Filling with nallah muck in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited Layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 24.17 | Cum | 900 | ₹21,753 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 1:4 (1 cement and 4 coarse Sand ) including curing incl Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto first floor level | 17.02 | Cum | 9,027.2 | ₹1,53,642.94 |
| 9 | Providing and fixing of wood work in frames of door/ window /arch windows /ventilator wrought frames (chowkats) imported Kd Wood. | 0.92 | Cum | 60,000 | ₹55,200 |
| 10 | Providing and fixing 40 x5mm flat iron hold fast including fixing of frames with nuts and bolts. | 30 | No | 70 | ₹2,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
BOQ_1003863.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid