Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-Finance | L1 | Accepted-Finance LOWEST | |
| 2 | L2₹13.5 L+₹1.3 L (10.3%)Rejected-Finance 104 105 SUNEJA TOWER 1 DISTRICT CENTRE JANAK PURI NEW DELHI 110058 | NEW DELHI | NEW DELHI | DELHI | 110058 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical 0 BETTER POWER SERVICES PVT LTD A K AZAD ROAD REHABARI KAMRUP ASSAM 781008 | KAMRUP METRO | ASSAM | 781008 | - | Rejected-Technical TECHNICALLY DISQUALIFIED | |
| 4 | Not Admitted-Fee/PreQual/Technical 4 R G BARUAH ROAD SUNDARPUR GUWAHATI KAMRUP ASSAM 781005 | KAMRUP METRO | ASSAM | 781005 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Rejected-Technical J 1249 RIICO INDUSTRIAL AREA SITAPURA PHASE III JAIPUR RAJASTHAN 302022 INDIA | JAIPUR | RAJASTHAN | 302022 | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
₹14.8 L
EMD Value
₹29,661
Closing Date
27 Jul 2020, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Jt GM CNS
O/o Jt GM CNS Maharana Pratap Airport Udaipur
Supply, Installation, Testing and Commissioning SITC OF UPS FOR CNS EQUIPMENTS AT UDAIPUR AIRPORT
2020_AAI_52841_1
AAI/VAUD/CNS/2020/P180/UPS
Open Tender
Miscellaneous Works
Works
45 days
Maharana Pratap Airport Udaipur
As per NIT
4 documents required · 4 mandatory
₹1,680
Yes
Airports Authority of India
₹29,661
Yes
8 Sept 2020
13 Jul 2020
4 Aug 2020
13 Jul 2020
27 Jul 2020
13 Jul 2020
13 Jul 2020 - 17 Jul 2020
180 days
Amount
Supply of Items
10 KVA 3 phase online UPS in Main & Hot Standby Configuration with Battery Bank : battery back-up time of 30 minutes using 12V,42AH(Min.) VRLA Sealed Maintenance Free Batteries on full load. Battery make : preferably EXIDE/QUANTA/AMARON.Battery Cabinet/Battery Rack for Battery Housing with cover and interconnectors.
5 KVA online UPS in Main & Hot Standby Configuration with Battery Bank : battery back-up time of 30 minutes using 12V,26AH (min) VRLA Sealed Maintenance Free Batteries on full load. Battery must be proBattery make : preferably EXIDE/QUANTA/AMARON. Battery Cabinet/Battery Rack for Battery Housing with cover and interconnectors.
3 KVA online UPS in Main & Hot Standby Configuration with with Battery Bank : battery back-up time of 30 minutes using 12V,26AH (min) VRLA Sealed Maintenance Free Batteries on full load. Battery must be proBattery make : preferably EXIDE/QUANTA/AMARON. Battery Cabinet/Battery Rack for Battery Housing with cover and interconnectors.
2 KVA online UPS in Main & Hot Standby Configuration with with Battery Bank : battery back-up time of 30 minutes using 12V,26AH (min) VRLA Sealed Maintenance Free Batteries on full load. Battery must be proBattery make : preferably EXIDE/QUANTA/AMARON. Battery Cabinet/Battery Rack for Battery Housing with cover and interconnectors.
Installation, testing and Commissioning
CAMC cost for first year
CAMC cost for second year
CAMC cost for Third year
INFOSOFT DIGITAL DESIGN AND SERVICES PVT. LTD.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .