Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical HARDAHA BALUWA VARANASI CHANDAULE | Admitted-Fee/PreQual/Technical |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹25.3 L
EMD Value
₹2.5 L
Closing Date
21 Sept 2026, 3:00 pmClosed
chief engineer
Nirman Vibhag Nagar Nigam Saharanpur
Construction of cc road from nathiram tent house shop to nirankari boutiqe for shivendra vihar at ward no. 46
2026_NNSAH_1183537_1
6234 B
Open Tender
Civil Works
Percentage
45 days
Saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹2.5 L
22 Sept 2026
9 Sept 2026
22 Sept 2026
9 Sept 2026
21 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old brick work including labour T&P etc all complete (S.I. no 692) | 87.98 | m3 | 400 | ₹35,192 |
| 2 | Deduction cost of old brick bat | 79.18 | cum | 800 | ₹63,344 |
| 3 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 8:4:1 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 128.1 | cum | 4,850 | ₹6,21,285 |
| 4 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 15.87 | cum | 4,690 | ₹74,430.3 |
| 5 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 69 | sqm | 165 | ₹11,385 |
| 6 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work | 3.18 | m3 | 7,400 | ₹23,532 |
| 7 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 249.63 | kg | 85.29 | ₹21,290.94 |
| 8 | Cement Concrete with 2 cm gauge approved graded stoneee grit, coarse sand and cement in the proportion of 4:2:1, including supply of all materials, labour, tools & plants etc required for proper completion of the work As per direction of E/I. | 3.45 | cum | 5,750 | ₹19,837.5 |
| 9 | C.C. 1:1.5:3 cement course sand and 20 mm gauge stone grit with micron polythene (without dovel bar) all work complete | 192.15 | cum | 7,300 | ₹14,02,695 |
| 10 | Add 18%GST | 1 | No | 3,86,334.26 | ₹3,86,334.26 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.23 MB
BOQ_2225944.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .