| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹4.2 L (2.64%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.7 Cr+₹4.2 L (2.64%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
2 Sept 2023, 3:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works Agra
Construction of VRB at Km 5.041 of Bata Scape
2023_UPIDC_831728_3
07/SE/2023-24
Open Tender
Civil Works
Item Rate
180 days
Palwal Haryana State
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹3.3 L
11 Oct 2023
24 Aug 2023
2 Sept 2023
24 Aug 2023
2 Sept 2023
24 Aug 2023
Amount
Earth work in foundation including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to the distance of 70 m from the foundation trenches etc.
Earth work in cutting or in embankment in ordinary soil, for construction of approach road, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
Fabrication of cutting edge including cost of steel all material , labour , T&p, required for welding, placing in position as per drawing or direction of site incharge complete.
Providing and Fixing steel centering & shuttering for well staining, well cap , well curb, including all labour and T&P etc. required for proper completion of work.
Providing and Fixing steel centering & shuttering for piers, abutment, Cap ,T- Beam & Slab of bridge etc. including all labour & T&P etc. required for proper completion of work.
C.C. M-15 (1:2:4)with 10% extra cement and stone grit 5mm to 20 mm size for bottom plugging including cost of all material , labour , T&p etc. required for proper completion of work.
C.C. M-15 (1:2:4) with cement and stone grit 5mm to 20 mm size for top plugging including cost of all material , labour , T&P etc. required for proper completion of work.
R.C.C. M-25 in well curb, well cap,all super structure & return wall including cost of all material , labour , T&p etc. required for proper completion of work.
R.C.C. M-20 (1:1.5:3) for circular well steining & false steining including cost of all material, labour , T&P etc. required for proper completion of work.
R.C.C. M-30 in pedestal & crash barrier of bridge including cost of all material, labour, T&p etc. required for proper completion of work.(MORTH-21.09)
S/placing steel reinforcement for R.C.C. works including cost of steel all labour and material, cutting, bending, binding wire, welding etc. and T&P required for proper completion of work .
Sinking of well for abutment & pier 5.00 m external dia, in average type containing sand , medium clay, mixed with kankar, chharri, including cost of all material, labour , T&p etc complete.with disposal of mud with lead of 60m.(i) From 0 to 3.00m
Sinking of well for abutment & pier 5.00 m external dia, in average type containing sand , medium clay, mixed with kankar, chharri, including cost of all material, labour , T&p etc complete.with disposal of mud with lead of 60m. (ii) From 3.00 to 6.00m
Sinking of well for abutment & pier 5.00 m external dia, in average type containing sand , medium clay, mixed with kankar, chharri, including cost of all material, labour , T&p etc complete.with disposal of mud with lead of 60m. (iii) From 6.00 to 9.00m
Sinking of well for abutment & pier 5.00 m external dia, in average type containing sand , medium clay, mixed with kankar, chharri, including cost of all material, labour , T&p etc complete.with disposal of mud with lead of 60m. (iv) From 9.00 to 12.00m
S/Filling local sand in wells including cost of all material, labour , T&P etc. required for proper completion of work.
S/F Drainage spout including cost of all material, labour , T&p etc complete.
Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with pre-moulded joint filler board including cost of all material, labour T&P all lifts and leads etc .compete as per direction of Engineer-in-charge.
S/Fixing elastometric bearing of 180mt capacity including cost of bearing, aproxy paint, all taxes, inspection charges etc. complete.
S/fixing 75mm dia 600mm long PVC pipe in weepholes including cost of all material, labour , T&P etc. complete.0.60 m length
S/F railing plate including cost of all material, labour , T&P etc. complete.
P/F 65mm dia G.I. Pipe including cost of all material, labour , T&P etc. complete.
P/F Sign board (1.2x0.9m)
Earth work in Lip cutting in main canal in all types of soil and disposal of excavated earth to be deposited as spoil bank as per approved drawing and as directed by Engineer incharge.
Shuttering including all cost of labour, materials, T&P etc. required for proper completion of work.
Cement concreet M-15 grade (1:2:4) including all cost of material, labour & T&P etc. complete.
Painting anticorrosive/bituminous paint two coats /Sqm Ist coat 0.50 Ltr/Sqm & IInd coat 0.25 Ltr/Sqm As per IS code 3873-1978 and all material, labour and T&P etc. complete.
P/Laying C. C. compressed double Tiles lining (300x300x40mm) of C.C. (M-15) as per approved drawing including all cost of material, labour and T&P etc. complete.
Supplying and filling Sealing compound including making and filling of groove joints in lining with bitumen (80/100), fine sand and asbestos powder including all cost of material, labour and T&P etc. complete
Making Porous Concrete (1:0:8) window including all cost of material, labour T&P etc. required for proper completion of work.
Providing & laying 100mm thick CC interlocking tiles over approach road.
Earth work in embankment in ordinary soil with lift 2.4 m and lead upto 200 m including excavation , loading, unloading, manual compaction and dressing and all lifts and also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
SHIVAM ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .