Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAccepted-AOC | ₹8.0 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹8.1 Cr+₹14.4 L (1.80%)Rejected-Finance K 99 LGF KALKAJI NEW DELHI 110 019 | NEW DELHI | NEW DELHI | DELHI | 110019 | ₹8.1 Cr+₹14.4 L (1.80%) | L2 | Rejected-Finance BOQ in order |
| 3 | L3₹8.4 Cr+₹47.3 L (5.94%)Rejected-Finance | ₹8.4 Cr+₹47.3 L (5.94%) | L3 | Rejected-Finance BOQ in order |
| 4 | L4₹8.6 Cr+₹65.5 L (8.21%)Rejected-Finance SRIKONA POTAPOLA CHHAKA CHANDIPUR ROAD BALASORE ODISHA 756025 | BALASORE | BALESHWAR | ODISHA | 756025 | ₹8.6 Cr+₹65.5 L (8.21%) | L4 | Rejected-Finance BOQ in order |
| 5 | L5₹8.9 Cr+₹92.2 L (11.6%)Rejected-Finance | ₹8.9 Cr+₹92.2 L (11.6%) | L5 | Rejected-Finance BOQ in order |
| Sl No | Description | Qty | Unit | M/s S N Atiwadkar L7 | SOOD ASSOCIATES PVT LTD L2 | D R CONSTRUCTION L6 | B5BUILDING SOLUTIONS L3 | ASHIRWAD ELECTRICALS L5 | bholanath bera L4 | M Mohan Babu L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00GENERAL SUMMARY NOTE: Schedule ‘A’ Part I to XII are prepriced by MES under Ser Nos. 2.00 to 13.00. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | ||||||||||
| 2.00 | Lumpsum price worked out by the contractor for “Building or works” as listed in Schedule ‘A’ Part - I inserted by MES . | 1 | Lumpsum | 8,33,00,000 ₹8,33,00,000 | 6,09,68,250 ₹6,09,68,250 | 7,02,10,425 ₹7,02,10,425 | 6,28,00,000 ₹6,28,00,000 | 6,94,34,229 ₹6,94,34,229 | 5,80,68,250 ₹5,80,68,250 Lowest | 5,92,67,235 ₹5,92,67,235 |
| 3.00 | Lumpsum price worked out by the contractor for “Internal Water Supply” as listed in Schedule ‘A’ Part - II inserted by MES . | 1 | Lumpsum | 9,70,000 ₹9,70,000 | 6,35,992.36 ₹6,35,992.36 | 10,23,967 ₹10,23,967 | 5,85,000 ₹5,85,000 Lowest | 7,08,849 ₹7,08,849 | 6,53,823.92 ₹6,53,823.92 | 6,00,000 ₹6,00,000 |
| 4.00 | Lumpsum price worked out by the contractor for “Internal Electric Supply” as listed in Schedule ‘A’ Part - III inserted by MES . | 1 | Lumpsum | 20,60,000 ₹20,60,000 | 19,76,543.97 ₹19,76,543.97 | 29,51,985 ₹29,51,985 | 25,00,000 ₹25,00,000 | 15,23,490 ₹15,23,490 Lowest | 25,72,214.76 ₹25,72,214.76 | 20,50,000 ₹20,50,000 |
| 5.00 | Lumpsum price worked out by the contractor for “PVC water tank with staging” as listed in Schedule ‘A’ Part - IV inserted by MES . | 1 | Lumpsum | 2,02,500 ₹2,02,500 | 2,10,269.4 ₹2,10,269.4 | 2,34,186.26 ₹2,34,186.26 | 2,55,000 ₹2,55,000 | 2,00,677 ₹2,00,677 Lowest | 2,37,400.94 ₹2,37,400.94 | 2,26,000 ₹2,26,000 |
| 6.00 | Lumpsum price worked out by the contractor for “Path” as listed in Schedule ‘A’ Part - V inserted by MES . | 1 | Lumpsum | 18,00,000 ₹18,00,000 | 15,31,114.48 ₹15,31,114.48 Lowest | 18,81,527 ₹18,81,527 | 17,00,000 ₹17,00,000 | 18,34,965 ₹18,34,965 | 19,36,952.05 ₹19,36,952.05 | 18,00,000 ₹18,00,000 |
| 7.00 | Lumpsum price worked out by the contractor for “Sewage Disposal” as listed in Schedule ‘A’ Part - VI inserted by MES . | 1 | Lumpsum | 4,00,000 ₹4,00,000 Lowest | 4,71,921.03 ₹4,71,921.03 | 4,65,002.6 ₹4,65,002.6 | 4,50,000 ₹4,50,000 | 5,68,904 ₹5,68,904 | 4,63,100.07 ₹4,63,100.07 | 4,00,000 ₹4,00,000 Lowest |
| 8.00 | Lumpsum price worked out by the contractor for “Obstacles” as listed in Schedule ‘A’ Part -VII inserted by MES . | 1 | Lumpsum | 33,00,000 ₹33,00,000 | 35,17,650.9 ₹35,17,650.9 | 32,55,030.15 ₹32,55,030.15 Lowest | 35,00,000 ₹35,00,000 | 36,72,282 ₹36,72,282 | 41,60,662.35 ₹41,60,662.35 | 35,00,000 ₹35,00,000 |
| 9.00 | Lumpsum price worked out by the contractor for “Fencing and Gate” as listed in Schedule ‘A’ Part -VIII inserted by MES . | 1 | Lumpsum | 14,75,000 ₹14,75,000 | 13,76,914.07 ₹13,76,914.07 | 14,10,856 ₹14,10,856 | 12,00,000 ₹12,00,000 | 16,15,396 ₹16,15,396 | 11,58,152.02 ₹11,58,152.02 Lowest | 12,00,000 ₹12,00,000 |
| 10.00 | Lumpsum price worked out by the contractor for “Retaining wall and Compound wall” as listed in Schedule ‘A’ Part -IX inserted by MES . | 1 | Lumpsum | 41,75,000 ₹41,75,000 | 52,05,913.54 ₹52,05,913.54 | 40,32,061.1 ₹40,32,061.1 | 52,50,000 ₹52,50,000 | 36,06,464 ₹36,06,464 Lowest | 52,61,891.11 ₹52,61,891.11 | 50,00,000 ₹50,00,000 |
Tender Value
₹7.4 Cr
EMD Value
₹6.0 L
Closing Date
3 Nov 2025, 6:00 pmClosed
CE AF BANGALORE
Chief Engineer AF Bangalore No. 2 DC Area MES Road Yeshwantpur Post Bangalore 560022
801594 PROVISION OF MINI ARMOURY, BOREWELL, TRAINING SHED, OBSTACLE TRAINING AND MISC INFRASTRUCTURE AND TOILETS FOR AGNIVEER (MALE and FEMALE) AT TILAKWADI ATS BELAGAVI
2025_MES_733121_1
801594
Open Tender
Civil Works
Lump-sum
540 days
SAMBRA
A class Cat ai
8 documents required · 8 mandatory
₹3,000
GE (AF) SAMBRA
₹6.0 L
Yes
16 Jan 2026
29 Sept 2025
10 Nov 2025
29 Sept 2025
3 Nov 2025
27 Oct 2025
29 Sept 2025 - 10 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1GENERAL SUMMARY NOTE: Schedule ‘A’ Part I to XII are prepriced by MES under Ser Nos. 2.00 to 13.00. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | |||||
| 2 | Lumpsum price worked out by the contractor for “Building or works” as listed in Schedule ‘A’ Part - I inserted by MES . | 1 | Lumpsum | 4,74,25,050 | ₹4,74,25,050 |
| 3 | Lumpsum price worked out by the contractor for “Internal Water Supply” as listed in Schedule ‘A’ Part - II inserted by MES . | 1 | Lumpsum | 6,79,420.38 | ₹6,79,420.38 |
| 4 | Lumpsum price worked out by the contractor for “Internal Electric Supply” as listed in Schedule ‘A’ Part - III inserted by MES . | 1 | Lumpsum | 26,89,359.48 | ₹26,89,359.48 |
| 5 | Lumpsum price worked out by the contractor for “PVC water tank with staging” as listed in Schedule ‘A’ Part - IV inserted by MES . | 1 | Lumpsum | 2,26,096.13 | ₹2,26,096.13 |
| 6 | Lumpsum price worked out by the contractor for “Path” as listed in Schedule ‘A’ Part - V inserted by MES . | 1 | Lumpsum | 18,44,716.24 | ₹18,44,716.24 |
| 7 | Lumpsum price worked out by the contractor for “Sewage Disposal” as listed in Schedule ‘A’ Part - VI inserted by MES . | 1 | Lumpsum | 4,41,047.69 | ₹4,41,047.69 |
| 8 | Lumpsum price worked out by the contractor for “Obstacles” as listed in Schedule ‘A’ Part -VII inserted by MES . | 1 | Lumpsum | 37,82,420.32 | ₹37,82,420.32 |
| 9 | Lumpsum price worked out by the contractor for “Fencing and Gate” as listed in Schedule ‘A’ Part -VIII inserted by MES . | 1 | Lumpsum | 12,86,835.58 | ₹12,86,835.58 |
| 10 | Lumpsum price worked out by the contractor for “Retaining wall and Compound wall” as listed in Schedule ‘A’ Part -IX inserted by MES . | 1 | Lumpsum | 55,97,756.5 | ₹55,97,756.5 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_820854.xls
BOQ • 0.32 MB
801594Tender.pdf
Tender Documents • 1.58 MB
801594Drawings.pdf
Tender Documents • 8.60 MB
801594TD.pdf
Tender Documents • 10.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .