Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹15.2 L
EMD Value
₹15,210
Closing Date
15 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO
Melmalaiyanur
Melmalayanur/AGAMTII2022-23/22
2022_RDTN_270284_1
Melmalayanur/AGAMTII2022-23/22
Open Tender
Civil Works
Works
60 days
Melmalaiyanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,210
Yes
15 Dec 2022
6 Dec 2022
15 Dec 2022
6 Dec 2022
15 Dec 2022
6 Dec 2022
Amount
CONSTRUCTION OF GIRLS TOILET @ PUM School Kadapanandhal Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc.,
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc.,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Paving the floor with scratch proof design ceramic tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly completed.
Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard sepcification and as directed by the departmental officers size 150x150x6mm
Supply and delivery of following size of PVC pipes and specials as per IS 4985 with ISI mark and manufacturar brand
20mm PVC tap
20mm PVC Bend
20mm PVC pipes 10Ksc
500Lit HDPE tank
Distembering Two Coats with best approved Oil Bound Distember including cost of Painting with Primer Coat over new plastered surface and conveyance of all materils to site and all labour charges etc complete
Painting Two Coats with approved Exterior Emulsion over the Plastered surface over one coat of cement paint including cost of all materials and labour charges etc complete
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supply and fixing of Doors of size 1.10x2.10 m
Supply and fixing of Doors of size0.75x1.80 m
Supply of RCC jolly
Provision for Water Closet
Provision for EWC
Provision for Name board charges
Provision for Photographic charges
Fencing Arrangements and Water Supply Arrangements @ Additional Nursery Elanthakulam Survey No: 21 in Kadapanandhal Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc complete.
Cost an d Spply of Concrete Moulded Post incluing all Labour charges
Cost an d Spply of Supplying and fixing Boundary GI Net (2 x 2) for under construction of high rise building
Towards of Labour Charges for Welding , Rods and welding Machine Charges including all Labour charges
Towards of Cost and Supply of Doors including Cost and conveyance
Providing New Bore Well , Motor and Syntax
Geophysical Investication charges etc complete
Supply and delivery of 165 mm dia PVC plain casing pipe including all charges etc. complete.
Drilling of Bore well in Hard Rock 150 mm dia using DTH Rig including cost of Drilling and conveyance charges .
Towards cost and supply of Single phase Submersible Pump set with ISI mark IS 8034 with out Pannel board15lpm X 60 m head including conveyance
Towards cost and supply of Single PHASE PANEL BOARD- D.O.L WITH TWO LEVEL GUARD AND AUTO START (2 HP)
Supply, delivery of M S Kisok of size 0.75 x 0.45 x 0.75 m for fixing of Meter board and switch board with M S door with lock and key arrengements ,painting two coats with ready mix paint over a priming coat of red oxide and fixing charges etc,complete.
Construction of Pedestal for MS KISOK BOX as per TWAD BOARD type design
Towards cost and supply of pvc insulated and sheathed 3 core 2.5 sqmm flat type copper cable confirming to IS 694/1990 with out heavy duty including conveyance
Hdpe Hose 32mm dia
32 mm dia GI Flange set
32 mm dia Flange rubber
32 mm dia GI Pipe
32 mm dia GI Elbow
32mm GI gate valve
Supply and delivery of PVC Insulated Single Core Multi Strend Fire Retardant Flexable Copper Cable With ISI Mark Conforming to IS 694/1990 A Run of 1X2 Nos. of size 56/0.3 101/0.45 ( 16 sq.mm )
Teak wood board for fixing meter and pannel board (40cmx30cm)
32 AMPS fuse carrier 440V etc
Bulb (60w)with holder
Swich (15amps)
Aerial Board (20x15 cm)
16Amain swith
15mm Nylon Rope
Bore cap using M.S. Flat of size 1 cm x 3 mm and M.S. sheet on top with bolting arrangements for securing the cap in position (Bore caps with M.S. Couplings need not be made)
ERECTION OF POWER PUMPSET IN BORE/OPENWELL Erection of power pumps in borewell labour charges for erection of twin packer duplex type jet pumps in borewells upto 150 mm dia including fixing of Suction pipe regulating valves with jet assembly upto a maximum depth of 30 m and delivery pipe valves pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three indicator lamps capacitor and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumps and trail run for 10 days including signing of completion of reports as required by EB authorities and finishing the pipe holes including the foundation bolts, nuts and earth pits.
Provision for Eletricity Charges
Provision for Name Board etc., complete.
Construction of Threasing floor @ Near Kaliamman koil in Kadapanandhal
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Supplying and filling in foundation and basement with good Gravel in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Provision for Name Board
Provision for Photo Graohic Charges
Provision for Bitumens Pad
Construction of Threasing floor @ Near Elanthakulam in Kadapanandhal
Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation.
Supplying and filling in foundation and basement with good Gravel in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification
Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:2:4 mix using 20 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed.
Provision for Name Board
Provision for Photo Graohic Charges
Provision for Bitumens Pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P Sampath
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .