Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC Low Value |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
13 Feb 2024, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE SEDC Salem
SE SEDC Salem
Works Contract in respect of North Valapady Sub division Of Valapady Division
2024_EB_417978_1
SE/SEDC/WC.NO.042/2023-24, Dt.30.01.2024
Open Tender
Electrical and Maintenance Works
Works
365 days
Valapady
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
1 Aug 2024
3 Feb 2024
14 Feb 2024
3 Feb 2024
13 Feb 2024
4 Feb 2024
Amount
Excavation of Pole/Stay pits
Excavation of pole pit up to 27”(8.0m) pole
Stay pit 4.5” to 5” depth
Excavation of pole pit up to 9.14 Mtr pole
Hard rock without Blasting
Erection of Poles
RCC poles/Metal pole up to 8.00m (27’)
RCC poles/Metal pole up to 9.14.m(30’)
Erection of stay set complete
Fixing of line materials
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT /LT TI Fitting
Fixing of HT Pin Insulators (11/22/33KV)
Fixing of HT 11KV stain disc
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of knob
Earthing of Pole with pit including burying looping and binding
Paving and Stringing of conductor
Paving of conductor ,Stringing , binding, Jumpering etc..7/4.09mm ACSR(per Km)
7/3.35mm ACSR 7/3.15mmAAAC(per Km)
7/2.59mm ACSR & 7/2.50mm AAAC(per Km)
Structure Erection
Erection of Transformer structure complete in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel,belting angle Including Concreting ( Except erection of transformer)
Erection of Single Pole Structure
Erection of D.P Structure with AB Switch , top channel , cross bracing , erathing , painting, providing stay including concreting .
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading & Un loading of poles
Loading of poles upto 27"
Loading of poles upto 30"
Loading of metal poles (All sizes)
Un Loading of poles upto 27"
Un Loading of poles upto 30"
Unloading of metal poles (All sizes)
Guarding Arrangements
Flat Guarding including fixing of 2 Nos. Cross arms
HT Guarding
Service Connections
Releasing of Single Phase service wire and refixing
Releasing of Three Phase service wire and refixing
Agricultural Service Fixing
Erection of street light including Fixure fitting
Erection of Street light Service
Mass Conreting including Materials (Cement + River Sand / M. Sand and Blue Metals and Watering )
Sleeve Concreting including Materials (Cement + River Sand / M. Sand and Blue Metals and Watering )
Dismandling of Line Materials
Dismandling of pole (9.0m and above)
Dismandling of pole (7.5mtr & 8mtr)
Dismandling of pole from pole pit (9.0m and above)
Dismandling of pole from pole pit (7.5mtr & 8mtr)
Dismandling of HT Pin Insulator
Dismandling of HT TI Fitting
Dismandling of11 KV disc
Dismandling of 3 PH X arm
Dismandling of Tapping X arm, V X arm & Guarding X arm
Dismandling of 1 PH X arm
Dismandling of Alu Knob
Dismandling of LT pin Insulator
Dismandling of LT Shackle Insulator
Stay set complete dismandling
Dismandling of 7/4.09 mm ACSR conductor (km)
Dismandling of 7/3.35 mm ACSR conductor (Km)
Dismandling of 7/2.59 & 7/2.11 mmACSR conductor (Km)
Erection of New Transformer all capacities (with jumpering)
Loading and unloading of Transformer upto 100 KVA
Loading and unloading of Transformer above 100 KVA upto 200 KVA
Replacement of failed Transformers all capacities
Re-stringing of HT/LT line ACSR 7/4.09 sqmm(for all sizes of conductors in Km)
Re-stringing of HT/LT line ACSR 7/3.35 sqmm & AAAC 7/3.15 sqmm (for all sizes of conductors in Km)
Re-stringing of HT/LT line ACSR 7/2.59 sqmm & AAAC 7/2.50 sqmm (for all sizes of conductors in Km)
Dismantling of street light
Releasing of grill from poles
Tree cutting
channel cutting
Description of Hills work
Excavation of Pole/Stay pits
Excavation of pole pit up to 27”(8.0m) pole
Stay pit 4.5” to 5” depth
Excavation of pole pit up to 9.14 Mtr pole
Hard rock without Blasting
Erection of Poles
RCC poles/Metal pole up to 8.00m (27’)
RCC poles/Metal pole up to 9.14.m(30’)
Erection of stay set complete
Fixing of line materials
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT /LT TI Fitting
Fixing of HT Pin Insulators (11/22/33KV)
Fixing of HT 11KV stain disc
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of knob
Earthing of Pole with pit including burying looping and binding
Paving and Stringing of conductor
Paving of conductor ,Stringing , binding, Jumpering etc..7/4.09mm ACSR(per Km)
7/3.35mm ACSR 7/3.15mmAAAC(per Km)
7/2.59mm ACSR & 7/2.50mm AAAC(per Km)
Structure Erection
Erection of Transformer structure complete in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel,belting angle Including Concreting ( Except erection of transformer)
Erection of Single Pole Structure
Erection of D.P Structure with AB Switch , top channel , cross bracing , erathing , painting, providing stay including concreting .
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading & Un loading of poles
Loading of poles upto 27"
Loading of poles upto 30"
Loading of metal poles (All sizes)
Un Loading of poles upto 27"
Un Loading of poles upto 30"
Unloading of metal poles (All sizes)
Guarding Arrangements
Flat Guarding including fixing of 2 Nos. Cross arms
HT Guarding
Service Connections
Releasing of Single Phase service wire and refixing
Releasing of Three Phase service wire and refixing
Agricultural Service Fixing
Erection of street light including Fixure fitting
Erection of Street light Service
Mass Conreting including Materials (Cement + River Sand / M. Sand and Blue Metals and Watering )
Sleeve Concreting including Materials (Cement + River Sand / M. Sand and Blue Metals and Watering )
Dismandling of Line Materials
Dismandling of pole (9.0m and above)
Dismandling of pole (7.5mtr & 8mtr)
Dismandling of pole from pole pit (9.0m and above)
Dismandling of pole from pole pit (7.5mtr & 8mtr)
Dismandling of HT Pin Insulator
Dismandling of HT TI Fitting
Dismandling of11 KV disc
Dismandling of 3 PH X arm
Dismandling of Tapping X arm, V X arm & Guarding X arm
Dismandling of 1 PH X arm
Dismandling of Alu Knob
Dismandling of LT pin Insulator
Dismandling of LT Shackle Insulator
Stay set complete dismandling
Dismandling of 7/4.09 mm ACSR conductor (km)
Dismandling of 7/3.35 mm ACSR conductor (Km)
Dismandling of 7/2.59 & 7/2.11 mmACSR conductor (Km)
Erection of New Transformer ( 63 to 200 KVA)
Loading and unloading of Transformer upto 100 KVA
Loading and unloading of Transformer above 100 KVA upto 200 KVA
Replacement of failed Transformers all capacities
Re-stringing of HT/LT line ACSR 7/4.09 sqmm(for all sizes of conductors in Km)
Re-stringing of HT/LT line ACSR 7/3.35 sqmm & AAAC 7/3.15 sqmm (for all sizes of conductors in Km)
Re-stringing of HT/LT line ACSR 7/2.59 sqmm & AAAC 7/2.50 sqmm (for all sizes of conductors in Km)
Dismantling of street light
Releasing of grill from poles
Tree cutting
channel cutting
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .