Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.5 LAdmitted-Finance | ₹90.5 L | L1 | Admitted-Finance |
| 2 | L2₹91.4 LAdmitted-Finance | ₹91.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MR.K.VIGNESH,CONTRACTOR L2 | MR.M.KALIMUTHU,CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Widening the RJPM -SNKL - TVL Road to Araichipatti (Via) Ayalpatti Road 1/500 -2/600 in MN Nallur Panchayat union in Tenkasi DistrictUnder MGSMT Additional 2025-26 Package No:7 | |||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 687.6 | Sqm | 6.42 ₹4,414.39 | 6.36 ₹4,373.14 |
| 3.00 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 921.3 | Cum | 141.85 ₹1.3 L | 140.42 ₹1.3 L |
| 4.00Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | |||||
| 5.00 | For side Berms ( 1500m - 2000m) | 21.3 | Cum | 617.23 ₹13,147 | 611 ₹13,014.30 |
| 6.00 | For side Berms ( 2000m - 2600m) | 36 | Cum | 627.39 ₹22,586.04 | 621.06 ₹22,358.16 |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 288.75 | Cum | 2,558.93 ₹7.4 L | 2,533.08 ₹7.3 L |
| 8.00Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | |||||
| 9.00 | For Formation ( 1500m - 2000m ) | 175 | Cum | 2,469.06 ₹4.3 L | 2,444.12 ₹4.3 L |
| 10.00 | For Formation ( 2000m - 2600m ) | 210 | Cum | 2,325.04 ₹4.9 L | 2,301.56 ₹4.8 L |
Tender Value
₹95.2 L
EMD Value
₹96,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Project Director
DRDA,Tenkasi
Widening the RJPM -SNKL - TVL Road to Araichipatti (Via) Ayalpatti Road 1/500 -2/600 in MN Nallur Panchayat union in Tenkasi District MGSMT 2025-26 Additional. Package No.07
2026_RDTN_664471_7
DIPR/1299/Tender/2026 MGSMT Additional Tsi
Open Tender
Civil Works - Roads
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹96,000
DRDA,Tenkasi
18 May 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
27 Feb 2026
Widening the RJPM -SNKL - TVL Road to Araichipatti (Via) Ayalpatti Road 1/500 -2/600 in MN Nallur Panchayat union in Tenkasi DistrictUnder MGSMT Additional 2025-26 Package No:7
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
For side Berms ( 1500m - 2000m)
For side Berms ( 2000m - 2600m)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
For Formation ( 1500m - 2000m )
For Formation ( 2000m - 2600m )
Premeasurement for Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Premeasurement for Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I . Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
Provision for Kilometre stone of size 1.65mx0.45mx0.15m
Construction of Retaining Wall at CH 2163m -2270m
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.(For Shuttering - Below Sill Level)
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
Supllying and fixing Bitumenpad 12mm thick for expansion joints at every 10m intervals inculding cost of material conveyance to site,cutting finishing etc., complete.
Providing 100mm PVC pipe for veep holes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tech.pdf
Tender Documents • 1.05 MB
BOQ_798139.xls
BOQ • 0.29 MB
Price.pdf
Additional Documents • 0.86 MB
Download all tender documents and submit your bid