Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC | L1 | Accepted-AOC satisfactory | |
| 2 | L2₹21.3 L+₹1.7 L (8.67%)Rejected-AOC NOCHIPALAYAM AUTHUR PO KARUR 2 | L2 | Rejected-AOC satisfactory | |
| 3 | L3₹21.6 L+₹2.1 L (10.5%)Rejected-AOC 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | L3 | Rejected-AOC satisfactory | |
| 4 | Not Admitted-Fee/PreQual/Technical 223 4TH STREET SIVANANDHAPURAM SARAVANAMPATTI PO COIMBATORE 641 035 | COIMBATORE | TAMIL NADU | 641035 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Vidhyut Nirman Corporation L3 | S RATHIKA CONSTRUCTIONS L1 | K.SELVARAJ L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing light juncle clearance and dispose away etc complete | 200 | M2 | 1 ₹200 Lowest | 6 ₹1,200 | 3 ₹600 |
| 2.00 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders including cost of all materials, all labour, lead, lift, etc complete | 73 | M3 | 200 ₹14,600 | 200 ₹14,600 | 140 ₹10,220 Lowest |
| 3.00 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in SDR not requring not requiring blasting including cost of all materials, all labour, lead, lift, etc complete | 30 | M3 | 250 ₹7,500 | 300 ₹9,000 | 240 ₹7,200 Lowest |
| 4.00 | MR-&-DMR (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting including cost of all materials, all labour, lead, lift, etc complete | 30 | M3 | 250 ₹7,500 Lowest | 300 ₹9,000 | 300 ₹9,000 |
| 5.00 | Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited including cost of all materials, all labour, lead, lift, etc complete | 15 | M3 | 350 ₹5,250 Lowest | 1,000 ₹15,000 | 800 ₹12,000 |
| 6.00 | Dismantling PCC and clearing away and carefully ncluding cost of all materials, all labour, lead, lift, etc complete | 40 | M3 | 350 ₹14,000 Lowest | 450 ₹18,000 | 400 ₹16,000 |
| 7.00 | Supply and filling of M Sand in foudation with well water and consolidation as per specn. Including cost of all materials labour, lead, lift, etc., complete | 9 | M3 | 750 ₹6,750 Lowest | 1,000 ₹9,000 | 2,000 ₹18,000 |
| 8.00 | PCC 1:3:6 using 20mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, water charges, lead, lift, curing,etc., complete | 18 | M3 | 5,500 ₹99,000 | 4,600 ₹82,800 Lowest | 6,000 ₹1,08,000 |
| 9.00 | RCC 1:1.5:3 using 12 to 20mm machine curshed metal for Raft foundation without form work including cost of all materials, water charges, labour, lead, lift,etc., complete. | 38 | M3 | 8,300 ₹3,15,400 | 7,300 ₹2,77,400 Lowest | 7,500 ₹2,85,000 |
| 10.00 | PCC 1:2:4 using 12 to 20mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, water charges, lead, lift, curing,etc., complete | 65 | M3 | 6,500 ₹4,22,500 | 5,220 ₹3,39,300 Lowest | 6,500 ₹4,22,500 |
Tender Value
Refer Docs
EMD Value
₹22,600
Closing Date
12 Jun 2025, 2:00 pmClosed
SE GCC CBE
OFFICE OF THE SUPERINTENDING ENGINEER GENERAL CONSTRUCTION CIRCLE 182 Dr SUBBARAYAN STREET TATABAD COIMBATORE 641 012
Providing Various Plinths for enhancement of the existing 110 33 KV Power Transformer capacity from 1 16 MVA to 2 16 MVA of 110 33 ratio at Bhavanisagar 110 33 11 KV SS in Salem Operation Circle
2025_EB_561869_1
TS No. 06/25-26 of SE GCC Cbe
Open Tender
Civil Works
Works
Bhavanisagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,600
Yes
30 Aug 2025
27 May 2025
12 Jun 2025
27 May 2025
12 Jun 2025
27 May 2025
Amount
Clearing light juncle clearance and dispose away etc complete
HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders including cost of all materials, all labour, lead, lift, etc complete
HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in SDR not requring not requiring blasting including cost of all materials, all labour, lead, lift, etc complete
MR-&-DMR (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium rock and dense medium rock not requiring blasting including cost of all materials, all labour, lead, lift, etc complete
Removing hard rock by wedging, chiseling and trimming to proper shape where blasting is prohibited including cost of all materials, all labour, lead, lift, etc complete
Dismantling PCC and clearing away and carefully ncluding cost of all materials, all labour, lead, lift, etc complete
Supply and filling of M Sand in foudation with well water and consolidation as per specn. Including cost of all materials labour, lead, lift, etc., complete
PCC 1:3:6 using 20mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, water charges, lead, lift, curing,etc., complete
RCC 1:1.5:3 using 12 to 20mm machine curshed metal for Raft foundation without form work including cost of all materials, water charges, labour, lead, lift,etc., complete.
PCC 1:2:4 using 12 to 20mm HBS machine crushed metal for foundation with out form work including cost of all labour, materials, water charges, lead, lift, curing,etc., complete
RCC 1:1.5:3 using 12 to 20mm machine curshed metal for cable duct wall concreat foundation with form work including cost of all materials, water charges, labour, lead, lift,etc., complete.
RCC 1:1.5:3 using 12 to 20mm machine curshed metal for Retaing wall concreat foundation with form work including cost of all materials, water charges, labour, lead, lift,etc., complete.
RCC 1:1.5:3 using 12 to 20mm machine curshed metal for cable duct cover slab with form work including cost of all materials, water charges, labour, lead, lift,etc., complete.
B W in C M 1;5 using chamber burnt ii class brick including cost of all materials, water charges, labour, lead, lift,etc., complete.
Providing Steel form box including cost of all materials, water charges, labour, lead, lift,etc., complete. Above G L
Supply and fixing Gi angle required lengt keeping in required alignment and level in yard cable duct fixing at 600 mm c/c including labour, lead, lift etc. complete (45x45x6mm)
Providing steel reinforcement MS/RTS rods and upto 16mm dia for reinforced concrete work including cost of steel MS/RTS rods, binding wire, labour charges for cutting, stringing, pending as per type design drawing, placing aligning, and typing properly with all leads and lift as per standard specification etc., complete
Labour charges for Transporting of Cable Duct cover slab from curing to duct keeping them alignment and fixing them in position including lead, lift, labour etc., complete
Labour charges for fixing template in correct level and alignment etc as per standard specification complete.
Supplying and fabrication of grouting bolt of 20mm / 25mm / dia of 1.20m length with bottom pending of 20cm and top galvanaised threaded protion 15cm including cost of all materials, 2 no GI nut, washers with all lead, lift labour charges, as per specificaiton etc., complete.
Plastering with CM 1:5 mix using 12 mm thick for inside & outside walls, including cost of all materials, water charges, labour, lift,etc., complete.
Painting the Plinth with two coats of "ULTIMA" paint over a white cement primer coat of aproved colour and quality including cost of all materials, lead and lift etc., complete.
Providing and laying PVC high density pipe including cost of all materials viz. bend, labour for cutting threading fixing and tightening necessary excavation etc., complete 40mm dia.
Providing and laying PVC high density pipe including cost of all materials viz. bend, labour for cutting threading fixing and tightening necessary excavation etc., complete 20mm dia.
Supplying & fixing of PVC Gate Valve 40mm with ISI make for PVC water Supply arrangements including cost of Pipe, Bend, Tee, l - Bow, reducer etc., as required of all mateials, lead, lift , Labour charges ete. Complete.
Supplying and fixing RCC colour 0.60m dia 0.3mx 0.05m including cost of all materials, labour, lead, lift, etc., complete., as per standard specification.,
Labour charges for spreading available Earth and consolidationas per standard ncluding cost of all materials, labour, lead, lift, etc., complete., as per standard specification.,
Suppling and filling Graval and consolidationas per standard ncluding cost of all materials, labour, lead, lift, etc., complete., as per standard specification.,
Supplying & Spreading 20 mm metal 100 mm tk over Stone dust 100 mm tk including spreding and levalling including cost of all materials, labour, lead, lift,etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
K.SELVARAJ (BID ID -1363145)
Vidhyut Nirman Corporation (BID ID -1362114)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .