| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-Finance | L1 | Accepted-Finance as per boq | |
| 2 | L2₹21.1 L+₹4.1 L (24.1%)Accepted-Finance | L2 | Accepted-Finance as per boq | |
| 3 | L3₹21.5 L+₹4.5 L (26.6%)Accepted-Finance | L3 | Accepted-Finance as per boq | |
| 4 | L4₹21.7 L+₹4.7 L (27.8%)Accepted-Finance | L4 | Accepted-Finance as per boq |
Tender Value
₹21.5 L
EMD Value
₹43,020
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer
JKPHC JAMMU
Balance work of Pre-fabricated structure at GDC Marwah by way of Construction of 02 No Septic tanks,3kva solar power plant and allied works( C. No.12)
2026_DGPJK_324912_1
12 of PHC JAMMU DIV/2026-27 Dated16-09-2026
Open Tender
Civil Works
Percentage
60 days
MARWAH KISHTWAR
REFER PQ TERMS AND CONDITIONS
3 documents required · 3 mandatory
₹1,000
Managing Director JKPHC Jammu
₹43,020
Yes
Executive Engineer, JKPHC NARWAL JAMMU
12 Oct 2026
16 Sept 2026
26 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
16 Sept 2026 - 18 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 483.93 | cum | 187.3 | ₹90,639.73 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 41.87 | cum | 5,202.9 | ₹2,17,840.22 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.39 | cum | 6,591.25 | ₹48,715.93 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 110.79 | cum | 5,733.6 | ₹6,35,225.54 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiralstair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.67 | cum | 9,821.85 | ₹45,887.68 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 373.6 | kg | 123.2 | ₹46,027.52 |
| 7Centering and Shuttering including strutting,propping etc | |||||
| 7.01 | Footing , Foundation Etc | 200.09 | sqm | 286.35 | ₹57,296.34 |
| 7.02 | suspended floor | 30.67 | sqm | 718.2 | ₹22,026.48 |
| 7.03 | edges of slab | 32.32 | rmt | 262 | ₹8,467.05 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_1096442.xls
BOQ • 0.30 MB
CORRIGENDUM.pdf
PDF • 0.46 MB
CORRIGENDUM.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .