Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹2.2 L+₹22,204 (11.1%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹2.2 L+₹24,573 (12.3%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
21 Jul 2022, 11:00 amClosed
SE EDC III BULANDSHAHR
EDC III BULANDSHAHR
RESAGGING OF LOOSE AND BED SAG CONDUCTOR AND INSULATION OF ELECTRIC POLE ON KANWAR MARK UNDER EDD DIBAI.
2022_PVVNL_714332_1
T-37/EDC-III/B/2022-2023
Open Tender
Electrical Works
Lump-sum
30 days
BULANDSHAHR
RESAGGING OF LOOSE AND BED SAG CONDUCTOR AND INSULATION OF ELECTRIC POLE ON KANWAR MARK UNDER EDD DIBAI.
2 documents required · 2 mandatory
₹1,180
ICICI BANK
₹2,000
27 Jul 2022
12 Jul 2022
21 Jul 2022
12 Jul 2022
21 Jul 2022
12 Jul 2022
Amount
fo|qr forj.k [k.M&fMckbZ ds {ks= esa dkaoM+ ;k=k çkjEHk gksus ds n`f"Vxr ftyk ç'kklu ,oa mPpkf/kdkfj;ksa ds }kjk fn;s x;s fn'kk funsZ'kksZa ds vuqikyu esa dkWoM+ ;kf=;ksa dh fo|qr ls lqj{kk ds n`f"Vxr [k.M ds dk;Z{ks= esa eq[; dkaoM+ ekxZ esa fo|qr ,l-Vh- iksyksa dks Hkwfexr ls 07 QhV Åij rd bUlwys'ku lhV yxkus] ,y-Vh-@,p-Vh- dh <+hyh ykbZuksa dks fjlSx djkuk] dkoM+ ekxZ esa iM+us okyh leLr jksM Økflax ij xkfM+ax djuk] {kfrxzLr QSflax dh ejEer dk dk;ZA
Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms.
STP/PCC from E.S.C Bulandshahr to Site.
Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Carriage of All line Material from store to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Laying, sagging. Stringing and binding and jumpering of ACSR Weasel conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
Laying, sagging. Stringing and binding and jumpering of ABC Cable on the newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
fixing of Stay rod with Stay wire in proper way with Nozelling.
Grouting of Stay rods .
Guarding of 33 K V line at road crossing by laying 3 Nos. Gl wire of size 6/10 SWG parallel and fixing of lacings (Tilli) at a distance at 1.5 mlrs as per direction of supervising engineer/RESPO mannual it. Includes the cost of labour,T&P carrier etc. required lor proper completing of work.
Resagging of loose and bad sag of L.T./H.T. line.
Chopping of Tree branches..
Tightening of Stay
Grouting of PCC/STP Pole Old
Grouting of 11KV line at road crossin & crowded area.
Eraction of Pole on long span.
Change of broken/Damaged/Missing following Items :-
Disc Insulator
Nut & Bolt off size
Bended X-Arm/Angle/Channel
Ailment of PCC/STP Pole
Re-Straightening of Tilted D/PPCC/ST Pole.
Stay Clamps
D.P. Clamp
Stay Insulator
Fixing Plastic Panni for Kawad STP Pole/Iran Pole/PCC Pole including other Material.
Wrapping of Plastic sheet on STP/Iron Pole including plastic steet material.
Fixingof Bamboo Spacer for L.T. Line for Kawad Road
Making of Plinth of the Damaged/Broken STP of the welded 03 Nos. Angle Iron piece with the Pole.
Pin Insulator
The folloing material is required to be The folloing material is required to be supplied by the contractor.
Wrapping of plastic sheet on Stay set wires.
Fixing of Bamboo spaces in LT line at about 2-3 meter gap.
Making of Jumpering Base seting by bamboo places around TF plinth/Double Pole for safety of public in crowded area.
Stay clamp.
Stay insulator.
F clamp 33 kv
LT clamp
LT Insulator
Double pole clamp.
Holding clamp for 33 KV cross arm.
Rapairing Plinth and Fencing
Above supply shall be done as per UPPCL/RESPO rules.
A K ELECTRICAL ENG WORKS
NEHA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .