| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.1 L+₹1.6 L (8.49%)Rejected-AOC 0 VILLAGE AND POST BAMROLI AHEER THANA MALPURA AGRA UTTAR PRADESH 282009 | AGRA | UTTAR PRADESH | 282009 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical 0 | - | Rejected-Technical DISQUALIFY |
| Sl No | Description | Qty | Unit | BHOOPENDRA SINGH CONTRACTOR L2 | AASHTA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning Thick Bushes & Throny Jungle without uprooting jhunds including all cost of labour and T&P etc.Complete. | 1,806.2 | Sqm | 4 ₹7,224.8 | 3.3 ₹5,960.46 Lowest |
| 2.00 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 75 | Nos | 32 ₹2,400 | 30 ₹2,250 Lowest |
| 3.00 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. | 175.75 | Cum | 95 ₹16,696.25 | 90 ₹15,817.5 Lowest |
| 4.00 | Providing and Laying C.C M-10 (1:3:6) including cost of all material, labour and T&P etc. | 33.15 | Cum | 5,020 ₹1,66,413 | 4,800 ₹1,59,120 Lowest |
| 5.00 | Providing and Laying R.C.C 1:1.5:3 (M-25) including all cost of material, labour and T&P etc. | 47.14 | Cum | 6,800 ₹3,20,552 | 5,800 ₹2,73,412 Lowest |
| 6.00 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material labour and T&P etc. | 422.7 | Sqm | 790 ₹3,33,933 | 600 ₹2,53,620 Lowest |
| 7.00 | Supplying & fixing Steel Rainforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding cutting and placing in position including all cost of material, labour and T&P etc. | 4.17 | MT | 73,000 ₹3,04,410 Lowest | 73,165 ₹3,05,098.05 |
| 8.00 | Providing and Laying Ist Class Brick Work in 1:4 C:M i/c. all cost of matrial, labour and T&P etc. | 55.33 | Cum | 5,540 ₹3,06,528.2 | 5,000 ₹2,76,650 Lowest |
| 9.00 | 12 mm thick Cement Plaster 1:4 C:M including all cost of material, labour and T&P etc. | 921.95 | Sqm | 187 ₹1,72,404.65 | 162 ₹1,49,355.9 Lowest |
| 10.00 | Ready made coloured cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. | 935.55 | Sqm | 74 ₹69,230.7 Lowest | 76 ₹71,101.8 |
Tender Value
₹20.5 L
EMD Value
₹42,000
Closing Date
4 Jul 2026, 2:00 pmClosed
EE N.D.G.C, Roorkee
Office of the E.E, N.D.G.C, Roorkee
Construction of boundary walls near Kaliyar Stand and Meena Bazar Vegetable Market undertaken as part of a project to build boundary walls for the protection of valuable State Gov.assets at various locations within the jurisdiction of the NDGC,RKE
2026_UPIDC_1164238_6
01/EE/2026-27
Open Tender
Civil Works
Item Rate
120 days
ROORKEE HARIDWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹42,000
23 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
4 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Thick Bushes & Throny Jungle without uprooting jhunds including all cost of labour and T&P etc.Complete. | 1,806.2 | Sqm | - | - |
| 2 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 75 | Nos | - | - |
| 3 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. | 175.75 | Cum | - | - |
| 4 | Providing and Laying C.C M-10 (1:3:6) including cost of all material, labour and T&P etc. | 33.15 | Cum | - | - |
| 5 | Providing and Laying R.C.C 1:1.5:3 (M-25) including all cost of material, labour and T&P etc. | 47.14 | Cum | - | - |
| 6 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material labour and T&P etc. | 422.7 | Sqm | - | - |
| 7 | Supplying & fixing Steel Rainforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding cutting and placing in position including all cost of material, labour and T&P etc. | 4.17 | MT | - | - |
| 8 | Providing and Laying Ist Class Brick Work in 1:4 C:M i/c. all cost of matrial, labour and T&P etc. | 55.33 | Cum | - | - |
| 9 | 12 mm thick Cement Plaster 1:4 C:M including all cost of material, labour and T&P etc. | 921.95 | Sqm | - | - |
| 10 | Ready made coloured cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. | 935.55 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.60 MB
FinalBOOKLATE.pdf
Tender Documents • 16.63 MB
BOQ_2182904.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .