Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC AT MAIN ROAD KATHARA PO KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC Evaluated as found as L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Not evaluated as not found as L1 Bidder | |
| 3 | Rejected-Technical AT PO JARANGDIH BOKARO | JARANGDIH | BOKARO | JHARKHAND | - | Rejected-Technical Not evaluated as not found as L1 Bidder |
Tender Value
₹2.8 L
EMD Value
₹3,600
Closing Date
19 Mar 2025, 6:00 pmClosed
Project Engineer (E and M), GVP Ph-II OCP
Office of the Project Engineer (E and M), GVP Ph-II OCP, PO Sawang Colliery, Dist Bokaro 829128
(A) Providing and fixing of L.T Control panel 440V, 800A as secondary controlling of 250KVA, 3.3KV/440V Transformer installed at main sub-station at GVP Phase-II OCP (B) Repairing and re-winding of 55KW, 440V make-WNP for washing station and water s
2025_CCL_331464_1
PE(E and M)/GVP Ph-II/E-Tender/2024-25/38 , Dt-06.03.2025
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Office of the Project Engineer (E and M), GVP Ph-I
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,600
23 Mar 2025
6 Mar 2025
21 Mar 2025
7 Mar 2025
19 Mar 2025
7 Mar 2025
7 Mar 2025 - 17 Mar 2025
Amount
(A)Providing & fixing of L.T Control panel 440V, 800A as secondary controlling of 250KVA, 3.3KV/440V Transformer installed at main sub-station at GVP Phase-II OCP. Providing of MCCB (DTH) 3 Ph + N 630 Amp.
Providing of 4" sq. Ampere meter
Providing of 4" sq. Volt meter
Providing of CT, 300/5 Amp.
Providing of open connector 12 point 16 Ampere
Providing of IDMT type E/F relay
Providing of auxiliary contactor 110V
Providing of potential transformer 440V to 110V
Providing of indicator lamp with holder
Providing of CBT with base
Providing of Earth leakage relay
Providing of wiring cable lugs, ferrule, PVC tape etc
Labour cost
(B) Repairing and re-winding of 55KW, 440V make-WNP for washing station and water sprinkler at GVP Phase-II OCP. Cost of enamelled copper winding wire
Insulation cost
Labour cost
Less scrap value @60% of total copper cost
Dala housing repair as per bearing size
Contractor profit
(B) Repairing and maintenance of 37KW, 550V starter for smooth drinking water supply at GVP Phase-II OCP. Supplying and fixing of thermal over load relay 100A
Supplying and fixing of E/L relay 415V
Supplying and fixing of single phase preventer 415V
Supplying and fixing of insulator with studs
Supplying and fixing of Core balance transformer with base
Supplying and fixing of current transformer (CT) 200/5A
Repairing of isolator with stud
Wiring cable, ferrule lugs, PVC tape and nut and bolt with washer etc.
Supplying and fixing of ML-6 contractor 550V
Total impact of GST for the purpose of CTC
M/S TIGER ENTERPRISES (BID ID -1138771)
M/S PUMPY N RAJ ENTERPRISES (BID ID -1138750)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_343590.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .