| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Fee/PreQual/Technical/Finance 52 GOVINDARAJAPATTINAM THAMARAINAGAR KANNANKURICHI SALEM 636030 | SALEM | SALEM | TAMIL NADU | 636030 | ₹6.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.6 L+₹7,732.33 (1.19%)Admitted-Fee/PreQual/Technical/Finance | ₹6.6 L+₹7,732.33 (1.19%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.6 L+₹7,812.74 (1.20%)Admitted-Fee/PreQual/Technical/Finance | ₹6.6 L+₹7,812.74 (1.20%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.6 L+₹7,814.95 (1.20%)Admitted-Fee/PreQual/Technical/Finance | ₹6.6 L+₹7,814.95 (1.20%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.8 L+₹26,464.99 (4.07%)Admitted-Fee/PreQual/Technical/Finance NO 1007 12TH SECTOR 78TH STREET KCEE MANASA APARTMENTS E BLOCK 3RD FLOOR K K NAGAR CH 600 078 | CHENNAI | CHENNAI | TAMIL NADU | 600078 | ₹6.8 L+₹26,464.99 (4.07%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | THANGAM AND CO L4 | SS ENGINEERRS L5 | S VIJAYAKUMAR L1 | SRI THANGAMMAN CONSTRUCTIONS L3 | Murugan Construction L6 | SRK CONSTRUCTIONS L8 | M THIRUNAVUKKARASU L2 | Viswanathan L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 55 | M3 | 187.02 ₹10,286.21 | 187.5 ₹10,312.5 | 184.8 ₹10,164 | 100 ₹5,500 Lowest | 198 ₹10,890 | 100 ₹5,500 Lowest | 187 ₹10,285 | 197 ₹10,835 |
| 2.00 | Conveying of excavated earth and debris including all labour charges etc., complete. | 33 | M3 | 88.41 ₹2,917.54 | 88.5 ₹2,920.5 | 87.36 ₹2,882.88 | 80 ₹2,640 | 93.6 ₹3,088.8 | 51 ₹1,683 Lowest | 88.4 ₹2,917.2 | 92 ₹3,036 |
| 3.00 | Filling with Quarry Rubbish including watering and consolidation incliuding all labour charges etc., complete. | 55 | M3 | 380.84 ₹20,946.46 | 445.75 ₹24,516.25 | 376.32 ₹20,697.6 | 350 ₹19,250 | 403.2 ₹22,176 | 300 ₹16,500 Lowest | 380.8 ₹20,944 | 402 ₹22,110 |
| 4.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 7 | M3 | 5,068.65 ₹35,480.57 | 5,082 ₹35,574 | 5,008.43 ₹35,059.01 | 3,100 ₹21,700 Lowest | 5,366.18 ₹37,563.26 | 5,000 ₹35,000 | 5,068.05 ₹35,476.35 | 5,366 ₹37,562 |
| 5.00 | Supplying and erecting Steel Centering including necessary supports for plane sufaces in foundation and in all floors for RCC Column Beams , using mild steel sheets of suitable size 90cm x 60cm and 10 gauge stiffened with including all labour charges etc., complete | 63 | M2 | 302.69 ₹19,069.26 | 1,006 ₹63,378 | 299.09 ₹18,842.67 Lowest | 315 ₹19,845 | 320.45 ₹20,188.35 | 400 ₹25,200 | 302.6 ₹19,063.8 | 320 ₹20,160 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 13 | M3 | 6,177.54 ₹80,308.03 | 6,194 ₹80,522 | 6,104.14 ₹79,353.82 Lowest | 6,500 ₹84,500 | 6,540.16 ₹85,022.08 | 6,500 ₹84,500 | 6,176.8 ₹80,298.4 | 6,540 ₹85,020 |
| 7.00 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. | 364 | M2 | 1,342.22 ₹4,88,569.13 | 1,261 ₹4,59,004 Lowest | 1,326.27 ₹4,82,762.28 | 1,385 ₹5,04,140 | 1,412.01 ₹5,13,971.64 | 1,450 ₹5,27,800 | 1,342.06 ₹4,88,509.84 | 1,420 ₹5,16,880 |
| 8.00Add :- GST @ 18% | |||||||||||
Tender Value
₹9.3 L
EMD Value
₹9,250
Closing Date
9 Jul 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Laying of Paver Block Road at Anjugam Nagar Cross Road in Ward no 3, North Zone
2026_MAWS_683429_3
E1/NorthZone/2026-27
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹9,250
10 Jul 2026
1 Jul 2026
10 Jul 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 55 | M3 | - | - |
| 2 | Conveying of excavated earth and debris including all labour charges etc., complete. | 33 | M3 | - | - |
| 3 | Filling with Quarry Rubbish including watering and consolidation incliuding all labour charges etc., complete. | 55 | M3 | - | - |
| 4 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 7 | M3 | - | - |
| 5 | Supplying and erecting Steel Centering including necessary supports for plane sufaces in foundation and in all floors for RCC Column Beams , using mild steel sheets of suitable size 90cm x 60cm and 10 gauge stiffened with including all labour charges etc., complete | 63 | M2 | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 13 | M3 | - | - |
| 7 | Supplying and laying Rubberised interlocking Paver block M40 grade Providing and laying of 83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. | 364 | M2 | - | - |
| 8 | Add :- GST @ 18% | - | - | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
ITBE1.pdf
Additional Documents • 0.05 MB
BOQ_821550.xls
BOQ • 0.28 MB
NITE1-Road.pdf
Tender Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .