Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹11.4 L (5.57%)Rejected-AOC 10 RUPANA ROAD 127046 | ₹2.2 Cr+₹11.4 L (5.57%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.2 Cr+₹14.3 L (6.95%)Rejected-AOC HOUSE NO 115 GALI NO 3 ADC COLONY SIRSA 125055 | SIRSA | SIRSA | HARYANA | 125055 | ₹2.2 Cr+₹14.3 L (6.95%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.2 Cr+₹17.9 L (8.72%)Rejected-AOC CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | ₹2.2 Cr+₹17.9 L (8.72%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.2 Cr+₹19.2 L (9.34%)Rejected-AOC BAKRIANWALI SIRSA HARYANA 125055 | SIRSA | SIRSA | HARYANA | 125055 | ₹2.2 Cr+₹19.2 L (9.34%) | L5 | Rejected-AOC L5 |
Tender Value
₹2.2 Cr
EMD Value
₹4.5 L
Closing Date
2 Nov 2023, 3:00 pmClosed
BHANU PARKASH SHARMA
EE PHE Division No. 2 Sirsa
Maujdin Estimate for Providing Canal Based Water Works at Village Maujdin, Distt. Sirsa.
2023_HRY_322277_1
2023572004A7 8013 4E41 A54C BBD7DB21DEB8583PUH
Open Tender
Civil Works
Works
390 days
MOUJDIN
2 documents required · 2 mandatory
₹15,000
₹4.5 L
Yes
13 Dec 2023
20 Oct 2023
2 Nov 2023
20 Oct 2023
2 Nov 2023
20 Oct 2023
Amount
N.S. Item
Provision for providing and installing of horizontal centrifugal pumping sets for raw water capable of delivering a discharge of (700 LPM) per hour against a head of 12 mtrs. driven by electric motors.
Recovery of Old Bricks
Recovery of Old Brick Bats
Provision for providing and installing of horizontal centrifugal pumping sets for raw water capable of delivering a discharge of (1000 LPM) per hour against a head of 15 mtrs. driven by electric motors.
Operation and maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per Schedule IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the Annual Mtc. estimate). complete in all respects as per approved NIT a) Operation and maintenance during defect liability oeriod after 3 month trial run period ( Operation only )
1st year operation and maintenance after defect liability period
2nd operation and maintenance after defect liability period
3rd operation and maintenance after defect liability period
4th operation and maintenance after defect liability period
5th operation and maintenance after defect liability period
Bidder Name
Amount
Krishan Kumar Aggarwal Contractor(GSTN-06ABZPG8254A1ZI)
Lokesh Kumar, Contractor(GSTN-06AYAPK6590K1Z4)
RAKESH KUMAR CONTRACTOR(GSTN-06BALPR8992J2ZP)
M.S. Construction Co.(GSTN-NA)
The Siwani Sadhbhawna Co op LC Society Ltd(GSTN-NA)
M.S. Construction Co.
Krishan Kumar Aggarwal Contractor
The Siwani Sadhbhawna Co op LC Society Ltd
RAKESH KUMAR CONTRACTOR
RAKESH KUMAR CONTRACTOR
The Siwani Sadhbhawna Co op LC Society Ltd
Krishan Kumar Aggarwal Contractor
M.S. Construction Co.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .