| Sl No | Description | Qty | Unit | P.Mohana L1 | Sriram L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and scrub/ light jungle by cutting, removing
and disposing of all materials such as bushes, scrubs,
stumps, roots, grass, weeds, top organic soil not
exceeding 150mm in thickness rubbish including cutting
of trees up to 300mm girth | 150.6 | M2 | 6.36 ₹957.82 Lowest | 7.84 ₹1,180.7 |
| 2.00 | Picking the existing black top/ WBM surface to 50 MM
depth including labour, hire charges d plants and all
other incidental charges etc. complete as per MOST
specification. | 313.75 | M3 | 23.36 ₹7,329.2 Lowest | 24.36 ₹7,642.95 |
| 3.00 | Earth work excavation in all classes of soils except hard
rock requiring blasting depositing on bank with initial
lead of 10M and lift of 2M including all labour charges
and incidental charges such as shoring, strutting,
providing coffer dams, bailing out | 22.59 | M3 | 140.34 ₹3,170.28 | 140.15 ₹3,165.99 Lowest |
| 4.00 | Providing US Gravel with a lead of KM including
cost and conveyance and stacking at site to
departmental gauge for taking pre measurements by
departmental officers and including labour charges for
spreading the gravel as per standard specification etc | 22.59 | M2 | 499.5 ₹11,283.71 Lowest | 499.51 ₹11,283.93 |
| 5.00 | Providing and laying spreading and compacting graded
stone aggregate to Wet Mix Macadam(WMM)
specification including premixing the material with water
at OMC in machanical mix plant carriage of mixed
material by tipper to site laying in uniform layers
250mm thick with pavers in SubBase/Base course on
well prepared surface and compacting with vibratory
roller to achieve the desired density including cost of
material,labour charges, rentals for machinery, fuel and
all other incidental charges etc., complete. | 117.66 | M2 | 3,230.7 ₹3,80,124.16 Lowest | 3,231.5 ₹3,80,218.29 |
| 6.00 | ApplyingPRIMECOAT overWMB/WMMsurfaceat
7.00KgofSS-1BitumenEmulsion/10sq.mincluding
labour forspraying,hirechargesforbitumensprayer
etc. Comp | 941.25 | M3 | 86.6 ₹81,512.25 Lowest | 86.7 ₹81,606.38 |
| 7.00 | Providing and laying bituminous macadam with hot
mix plant using crushed aggregates of grading as per
Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a
previously prepared surface with paver finisher to th | 47.06 | M3 | 9,648.5 ₹4,54,058.41 Lowest | 9,648.63 ₹4,54,064.53 |
| 9.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING
cmp (Grade-II) Providing and
laying Bituminious concrete to 40mm thick using 0.13cum
of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with
50.3kgs of VG30/VG40 heating the KM 0/0 -0/610 | 23.53 | no | 12,288.5 ₹2,89,148.41 Lowest | 12,288.89 ₹2,89,157.58 |
| 10.00 | Provision for Name Board | 1 | No | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 11.00 | Photo Charges | 1 | No | 1,000 ₹1,000 Lowest | 1,500 ₹1,500 |
Tender Value
₹14.7 L
EMD Value
₹14,710
Closing Date
26 Feb 2026, 5:00 pmClosed
BDO (VP)
Block Development office Cuddalore
Providing BT Road at Pillaiyar Koil Street in uchimedu Panchayat
2026_RDTN_663333_34
B4/0471/2026-Peri Urban Panchayat Fund
Open Tender
Civil Works - Roads
Item Rate
30 days
Block Development office Cuddalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,710
Yes
18 Aug 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
26 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and scrub/ light jungle by cutting, removing
and disposing of all materials such as bushes, scrubs,
stumps, roots, grass, weeds, top organic soil not
exceeding 150mm in thickness rubbish including cutting
of trees up to 300mm girth | 1 | M2 | 1.25 | ₹1.25 |
| 2 | Picking the existing black top/ WBM surface to 50 MM
depth including labour, hire charges d plants and all
other incidental charges etc. complete as per MOST
specification. | - | M3 | 53 | - |
| 3 | Earth work excavation in all classes of soils except hard
rock requiring blasting depositing on bank with initial
lead of 10M and lift of 2M including all labour charges
and incidental charges such as shoring, strutting,
providing coffer dams, bailing out | 1 | M3 | 11 | ₹10.99 |
| 4 | Providing US Gravel with a lead of KM including
cost and conveyance and stacking at site to
departmental gauge for taking pre measurements by
departmental officers and including labour charges for
spreading the gravel as per standard specification etc | 1 | M2 | 11 | ₹10.99 |
| 5 | Providing and laying spreading and compacting graded
stone aggregate to Wet Mix Macadam(WMM)
specification including premixing the material with water
at OMC in machanical mix plant carriage of mixed
material by tipper to site laying in uniform layers
250mm thick with pavers in SubBase/Base course on
well prepared surface and compacting with vibratory
roller to achieve the desired density including cost of
material,labour charges, rentals for machinery, fuel and
all other incidental charges etc., complete. | 1 | M2 | 11 | ₹10.99 |
| 6 | ApplyingPRIMECOAT overWMB/WMMsurfaceat
7.00KgofSS-1BitumenEmulsion/10sq.mincluding
labour forspraying,hirechargesforbitumensprayer
etc. Comp | - | M3 | 53 | - |
| 7 | Providing and laying bituminous macadam with hot
mix plant using crushed aggregates of grading as per
Table 500.4 premixed with bituminous binder,
transported to site upto a lead of 1000 m laid over a
previously prepared surface with paver finisher to th | - | M3 | 53 | - |
| 9 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING
cmp (Grade-II) Providing and
laying Bituminious concrete to 40mm thick using 0.13cum
of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with
50.3kgs of VG30/VG40 heating the KM 0/0 -0/610 | - | no | 11 | - |
| 10 | Provision for Name Board | - | No | 100 | - |
| 11 | Photo Charges | - | No | 100 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
34pillarkoiluchimedu.pdf
Tender Documents • 0.07 MB
BOQ_798832.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .